Batam, Batam City, Riau Islands, Indonesia
- Control & maintain the system for issuance recording / filing, tracking, retrieval of documents like procedures, QA/QC records, specifications, drawings and related documents.
- Prepare Request For Inspection (RFI) check list within 24 hours prior to inspection.
- Ensure that all other discipline activities that required inspection within the activity have been inspected approved.