Avatar of 許進發.
許進發
Vice President, Production and Operations @ EVERDURA Technology Co., Ltd.
ProfileResume
Posts
18Connections
Print
Avatar of the user.

許進發

Vice President, Production and Operations @ EVERDURA Technology Co., Ltd.
25+ years manufacturing experience in 8 and 12 inch silicon wafer industry (Shin-Etsu Handotai Taiwan and Xuzhou XinJing Semicoductor Technology Co., Ltd.) specializing in plant startup of operation, organization, reengineering, facility and equipment maintenance, MES/ EAP and general management. 11+ years engineering experience in telecommunications industry (Alcatel and AT&T) cultivating the capability of circuit design, process layout, cost reduction, yield and productivity improvement, system programming and equipment maintenance. Versatile experience, strategic intelligence, and skill on the problem solving and management on the aspect of P-D-C-A, QC/NQC 7 tools, IE 7 tools, 5S, QCC, TQM, TPM, MBO, BSC, IATF 16949, ISO14001, ISO45001 and SEMI-E10. It contributes the proven result of product and process improvement in terms of yield, productivity, efficiency, quality, cost, and on time delivery. Hold the educational degree of Master in Management of Technology from National Chaio Tung University, the technical member of LRQA (Lloyd's Register Quality Assurance Taiwan), a writer of Quality Journal for Chinese Society for Quality and the certification of train-the-trainer of APEC BCP (Business Continuity Plan) .
EVERDURA Technology Co., Ltd.
National Chiao Tung University
Hsinchu County, 台灣

Professional Background

  • Current status
    Unemployed
  • Profession
    Factory Manager / Director
    COO, Chief Operation Officer
    Manufacturing Director
  • Fields
    Semiconductor
    Organization / Management
    EdTech
  • Work experience
    More than 15 years (More than 15 years relevant)
  • Management
    I've had experience in managing 15+ people
  • Skills
    Improvement
    Problem Solving
    Productivity
    Motivate
    Analysis
    Coordinating
    Communication Skills
    Defect Management
    QA Plan and Strategy
    專案管理
  • Languages
    English
    Professional
  • Highest level of education
    Master

Job search preferences

  • Desired job type
    Full-time
    Interested in working remotely
  • Desired positions
    廠長以上職務
  • Desired work locations
  • Freelance
    Part-time freelancer

Work Experience

Vice President, Production and Operations

Jan 2024 - Present
Taipei City, Taiwan
Develop and manage the manufacturing facility and team to produce Battery Energy Storage System (BESS) by using Panasonic Lithum Battery (LIB) and Vanadinum Redox Flow Battery (VRFB).

General Manager, Manufacturing Center

Dec 2019 - Jan 2022
2 yrs 2 mos
Total employee : 525; managed : 140 Report to : CEO Managed 8 and 12 silicon wafers manufacturing process ranged from ingot growth, cropping and grinding, slug evaluation, slicing and double-side grinding, edge grinding, HLM, alkaline and acid etching, RTA, double-side polishing, edge-polishing, cleaning, inspection, packaging, and Epi. Managed the daily operation of production output, quality, budget, material consumption, and events of factory automation, facility and equipment repairing and ESH. Drafted KPI of Manufacturing Center to find out the area for improvement at the perspective of productivity, efficiency, yield, quality, cost, delivery and safety.

Director, Manufacturing and Safety Division

May 1996 - Dec 2019
23 yrs 8 mos
Total employee : 138; managed : 83 Report to : CEO/Chairman Managed 8 silicon wafers manufacturing including the production flow/plan, quality system, factory automation, facility and equipment maintenance, safety, environment and hygiene. Drafted annual company goal and KPI in order to find out the area for improvement productivity, efficiency, yield, quality, cost, delivery, safety, and several expansion projects through the process analysis and review, Established the engineering platform to diagnose and maintain the operation of facility system, process equipment and the reduction of energy consumption. Awarded the best performance of water saving award by Hsin Chu Science Park Administration in 2011, and the best safety and environment performance by Shin Etsu

Senior Manager

Sep 2004 - Jan 2005
5 mos
Total employee : 182; managed : 108 Report to : CEO/Chairman Initiated and integrated the manufacturing execution system, set up improvement target and objective to increase the productivity, efficiency, utilization and the time to identify process abnormality. Led, unify and motivate the consciousness of improvement on systematic and logic thinking approach through daily operation meeting. Instructed and delivered the knowledge and skill of process diagnosis, data collection and

Manager

May 1996 - Sep 2004
8 yrs 5 mos
Total employee : 186; managed : 22 Report to : Vice President Supervised and managed the construction of SEH Taiwan 8 silicon wafer factory, including the building, clean room, ultra pure water system, waste water treatment system, chemical dispensing system, gas supply system, vacuum system, air emission system and electricity system, and integrated the pilot test of factory automation system. Completed several expansion project of clean room system, pure water system, the bio-treatment system of volatile organic solvent exhaust, and resolved the harmonic influence issue of electricity system. Conducted the accreditation of ISO14001 EMS and OHSAS18001 system as the measure of zero accident and incident for plant operation.

Supervisor, Manufacture Engineering Division

Jul 1986 - Apr 1995
8 yrs 10 mos
Joined AT&T-Taiwan at the initial stage of factory buildup and responsible for the process development of circuit board assembly and testing process. Developed test programs and working procedures to educate the engineer how to test and troubleshoot the circuit board. Educated technicians the test theory and principle of circuit boards, and troubleshot the defective control modules, communication modules and switching modules. Specialized at the development of C ++ and Informix SQL language, and developed the decision support system to manage RMA and yield analysis on Manufacturing Process Control System

Engineer

Sep 1984 - Jul 1986
1 yr 11 mos
Engineer, Quality Division Total employee : 900; managed : none Report to : Supervisor Developed testing programs to verify the function of electronic exchanger matrix board, control board, computer interface board, and relay control board including the troubleshooting of all function boards. Maintained and troubleshot the automatic testing equipment used in production line. Designed and installed two sets of Automatic Testing System for Westinghouse, Pittsburgh, USA to test and troubleshoot the malfunctioned control circuit boards of MRT system.

Education

Master of Business Administration (MBA)
Technology Management
2003 - 2005
Bachelor of Science (BS)
Electronic Engineering
1978 - 1982