- Measure signal interference of the server system rack.
- Schematic drawing and PCB placement design.
- Generate BOM; implement 2nd Source, and material check.
- Process EQ questions from PCB vendors.
- Using Dell derating tool to check every component.
- Debug with SIT,ME,AC member for PIB thermal temperature issues.