Managed 15~20 people on the operation site, an average of 2~2.5 tons of vegetables and fruits are shipped every day.
Responsible for the development of the new plant, increase the average daily shipment volume of the plant from 0.7 to 3 tons/day in 4 months, Jan 2020 is assigned as the plant manager of the new plant, managing 25~30 people.
Assisted the operation manager to reduce the cost of the department, with a decrease of 18.5% in the 4-month period, also controlled the shipping error rate, which decreased by 47.6% from the weekly average high of 0.498% to 0.262% in the eight months from Sep 2019.
Established on-site work efficiency management standards and training SOPs.