Avatar of Roby Syuhada.
Roby Syuhada
Mine Planning Engineer
ProfileResume
Posts
0Connections
Imprimer
Avatar of the user.

Roby Syuhada

Mine Planning Engineer
Innovated and energetic Mine Planning Engineer with 6 years of experiences in Coal and Nickel Mining operation complements with Master of Science (M.Sc.) Mining Engineering. Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis. Generated an additional 18.5% coal reserve (total 1.9 million ton coal) by optimising Life Of Mine pit designs using Minex6.4 with 40k ton per month production. Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project, formulated contractors KPI evaluation table based on production and safety quarter performance with penalty-award applied, saved 7% fuel usage by optimising ECO Mode in 3 months, and boosted 13% coal haul capacity (Pit-to-Port) by leading 6 Double Trailer Trial. Succeed to deliver all milestone project 1 month ahead of the schedule ($1.95million project worth) with 7% budget saving and develop weekly observation with HSEC contractor as a safety operation mentor to develop safety awareness.
Logo of the organization.
PT. Sulawesi Cahaya Mineral
Logo of the organization.
Institut Teknologi Bandung
West Java, Indonesia

Professional Background

  • Statut Actuel
  • Profession
    Other
  • Fields
    Mining Metals
  • Expérience professionnelle
    4 à 6 ans
  • Management
  • Skills
    Coal Mining
    Nickel
    Mine Planning
    General Management
    Presentation Skills
    Vulcan
    Surpac
    data analysis and dashboarding
    Supply Chain Management
    Drone Piloting
    Project Management Skills
  • Highest level of education
    Master

Job search preferences

  • Desired job type
    Temps plein
    Intéressé par le travail à distance
  • Desired positions
    Mining / Mine Plan Engineer
  • Lieu de travail désiré
  • Freelance

Work Experience

Logo of the organization.

Mine Planning Engineer

déc. 2018 - Présent
Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator • Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown. • Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study. • Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration. • Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Logo of the organization.

Project Manager

juin 2018 - déc. 2018
7 mos
Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Communication Skills • Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation). • Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review. • Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner). • Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Logo of the organization.

Mining Engineer and General Management Operation

août 2016 - juin 2018
1 yr 11 mos
Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator • Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director. • Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge. • Led 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785. • Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied. • Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Logo of the organization.

Mining Geology and Planning Engineer

oct. 2014 - juil. 2016
1 yr 10 mos
Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience • Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown. • Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study. • Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources. • Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Logo of the organization.

Mining Environment Researcher

oct. 2013 - oct. 2014
1 yr 1 mo
Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by: • Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis. • Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.

Education

Logo of the organization.
Master of Science (MS)
Mining Engineering, Mine Environmental Management
2013 - 2014
3.6/4 GPA
Activités et groupes
Conduct research with study cases of the geochemical map of pyrite in open-pit mining refers to coal basin genesis with a total sulfur value approach. Lead the research with a partner in conducting five tests (Static, Kinetic, XRD, XRF, Mineralogy) to characterize and measure Acid Rock Drainage potential also to predict dispersion pattern of organic and an-organic sulfur refers to acid mine drainage agent.
Description
Fast track master program starts from 4th years bachelors program until 1-year after bachelor graduation.
Logo of the organization.
Bachelor of Science (BS)
Mining Engineering, Mining & Oil Exploration
2009 - 2013
3.3/4 GPA
Activités et groupes
ITB Student Mining Committee Leadership Training Professional Division Walk-In Interview Committee 3rd winner of PERHAPI Student Paper Competition Head Dept. of Documentation and Logistic in ITB President Election Committee
Description
My research is to highlight every key parameter in coal & mineral conservation policy from the Indonesia Ministry of Energy and Mineral that must be applied in mining industries starting from exploration stages. By reviewing and assessing abundant of an exploratory document and annual production - financial report from 4 major mining corporate (coal, copper and gold mining) as my secondary data, I could measure how far conservation method is applied by those corporate using Conservation Valuation Table that I formulated with Ministry Regulation as my blueprint.