Nov 2016 - Present
Responsible for assembly process and facility implementation for body shop.
Design feasibility to concept design study on model addition in existing line #1, #2 and #3 in RNAIPL plant India
PB1D, XBA, RBC, PY1B, HHA
Exposure in Alliance Standard lines ASL and Nissan Standard Lines fixtures NSL . Executed in Flexible body main lines programs LJO, RBC, P42Q .
Creation of Floor Fix, base assembly, fixed Roller bed to moveable one by adding pallet lifter and with safety device
inclined light curtain, vertical light curtain, horizontal light curtain
In Renault XFK project delivered two work cell creation namely hood ledge member and floor pan assembly with collision free environment contains 15 jigs and 64 robots.
Develop a BIW fixture, equipment with considering the collision free environment, ergonomic validation and gun feasibility study in the virtual phase of studies.
Design of concept level to final welding fixture design 3D & 2D manufacturing drawing, time chart and
Pneumatic circuit & purchase part selection.
Evaluate and prepare BOM, coordinate supplier discussion, to get design approval end to end support for
Equipment implementation.
Team Management, preparing project report and delivery schedule.