CakeResume 找人才

進階搜尋
On
4 到 6 年
6 到 10 年
10 到 15 年
15 年以上
Avatar of Teuku Muhammad Mifdhal Ridho.
Avatar of Teuku Muhammad Mifdhal Ridho.
Geographic Information System Specialist @Thiess
2023 ~ 現在
GIS Specialist
兩個月內
complete before due. PPIC (Project Planner and Inventory Control) Vessel Staff • PT Gerbang Saranabaja AugustOctober 2016 | Jakarta, Indonesia Successfully planned, estimated, and controlled more than five oil and gas, and chemical industry projects. Education Diponegoro University Geological Engineering •Thesis about Mentawai's Accretion Zone Skills GIS Software Python Programming SQL Database Data Engineering Microsoft Office ArcGIS Pro ArcGIS Desktop ArcGIS Enterprise Survey123 ArcGIS Field Maps Geocortex Global Mapper Languages Indonesian — Native or Bilingual English — Fluent Certification Microsoft Certified: Azure AI FundamentalsArcGIS Pro ProfessionalMicrosoft Certified: Azure Data FundamentalsEnterprise Administration ProfessionalMTA: Introduction to Programming Using Python - Certi...
GIS Software
Python Programming
SQL Database
就職中
目前會考慮了解新的機會
全職 / 對遠端工作有興趣
4 到 6 年
Diponegoro University
Geological/Geophysical Engineering
Avatar of Deni Reza.
Avatar of Deni Reza.
Surveyor @PT. ALAM HIJAU LESTARI
2022 ~ 現在
Surveyor
一年內
Deni Reja Saya adalah seorang surveyor proyek dengan pengalaman yang luas dalam mengelola dan melaksanakan survei lahan untuk proyek konstruksi. Saya memiliki pengetahuan mendalam tentang teknik survei dan mampu menghasilkan data yang akurat untuk mendukung keberhasilan proyek. Sebagai seorang surveyor proyek, saya telah bekerja pada berbagai jenis proyek konstruksi, termasuk bangunan komersial, infrastruktur, dan pembangunan perumahan. Saya terampil dalam menggunakan peralatan survei canggih dan software pemetaan untuk mengumpulkan, menganalisis, dan menginterpretasikan data Saya tetap bersemangat dalam mengikuti perkembangan terkini di bidang survei dan pemetaan. Saya selalu siap untuk belajar dan mengadopsi teknologi dan metode baru yang
Word
Excel
AutoCAD
就職中
全職 / 對遠端工作有興趣
4 到 6 年
SMK Adi Sanggoro
smk
Avatar of MAMANK PRATHAMA.
Avatar of MAMANK PRATHAMA.
曾任
pengawas lapangan,Quantity @CV. Cipta Estetika Konsultan
2021 ~ 2022
GET/PROJECT MANAGEMENT/PRODUCTION ENGINEER/PRODUCTION SUPERVISOR/QUALITY ANALYST
超過一年
MAMANK PRATHAMA Job Title Konawe Islands Regency, South East Sulawesi, Indonesia Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper suscipit lobortis nisl ut aliquip ex ea commodo consequat. Pengalaman Kerja pengawas lapangan,Quantity • CV. Cipta Estetika Konsultan JuliJanuari 2022 melakukan pengawasan pada pekerjaan pembangunan pasar rakyat mowewe.dan membuat laporan bulanan untuk dan mingguan untuk mengukur progres kemajuan pekerjaan tersebut. pengawas lapangan,Drafter,timSurvey • cv.AMIRAH LAND JanuariMei 2021 melakukan
Photoshop
AutoCAD
photoshop
待業中
全職 / 對遠端工作有興趣
4 到 6 年
Universitas Muslim Indonesia Makassar
teknik sipil
Avatar of the user.
Avatar of the user.
Freelance GIS Specialist @any company
2021 ~ 現在
超過一年
MICROSOFT OFFICE Windows
Arcmap
Global Mapper
兼職 / 對遠端工作有興趣
4 到 6 年
Universitas Gadjah Mada
Geografi Lingkungan
Avatar of the user.
Avatar of the user.
Mine Planning Engineer @PT. Sulawesi Cahaya Mineral
2018 ~ 現在
Mining / Mine Plan Engineer
一個月內
Coal Mining
Nickel
Mine Planning
全職 / 對遠端工作有興趣
4 到 6 年
Institut Teknologi Bandung
Mining Engineering, Mine Environmental Management
Avatar of the user.
Avatar of the user.
Sr. Backend @AmazingTalker
2021 ~ 現在
Backend Engineer
一年內
JavaScript
Node.js
Sass
就職中
全職 / 對遠端工作有興趣
4 到 6 年
交通大學
資訊工程

最輕量、快速的招募方案,數百家企業的選擇

搜尋履歷,主動聯繫求職者,提升招募效率。

  • 瀏覽所有搜尋結果
  • 每日可無限次數開啟陌生對話
  • 搜尋僅開放付費企業檢視的履歷
  • 檢視使用者信箱 & 電話
搜尋技巧
1
嘗試搜尋最精準的關鍵字組合
資深 後端 php laravel
如果結果不夠多,再逐一刪除較不重要的關鍵字
2
將須完全符合的字詞放在雙引號中
"社群行銷"
3
在不想搜尋到的字詞前面加上減號,如果想濾掉中文字,需搭配雙引號使用 (-"人資")
UI designer -UX
免費方案僅能搜尋公開履歷。
升級至進階方案,即可瀏覽所有搜尋結果(包含數萬筆覽僅在 CakeResume 平台上公開的履歷)。

職場能力評價定義

專業技能
該領域中具備哪些專業能力(例如熟悉 SEO 操作,且會使用相關工具)。
問題解決能力
能洞察、分析問題,並擬定方案有效解決問題。
變通能力
遇到突發事件能冷靜應對,並隨時調整專案、客戶、技術的相對優先序。
溝通能力
有效傳達個人想法,且願意傾聽他人意見並給予反饋。
時間管理能力
了解工作項目的優先順序,有效運用時間,準時完成工作內容。
團隊合作能力
具有向心力與團隊責任感,願意傾聽他人意見並主動溝通協調。
領導力
專注於團隊發展,有效引領團隊採取行動,達成共同目標。
一個月內
Mine Planning Engineer
Logo of PT. Sulawesi Cahaya Mineral.
PT. Sulawesi Cahaya Mineral
2018 ~ 現在
West Java, Indonesia
專業背景
目前狀態
求職階段
專業
其他
產業
礦業金屬
工作年資
4 到 6 年
管理經歷
技能
Coal Mining
Nickel
Mine Planning
General Management
Presentation Skills
Vulcan
Surpac
data analysis and dashboarding
Supply Chain Management
Drone Piloting
Project Management Skills
語言能力
求職偏好
希望獲得的職位
Mining / Mine Plan Engineer
預期工作模式
全職
期望的工作地點
遠端工作意願
對遠端工作有興趣
接案服務
學歷
學校
Institut Teknologi Bandung
主修科系
Mining Engineering, Mine Environmental Management
列印
Iypr3kseyjjcmp3ifm4h

Roby Syuhada

Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis.
Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result.
Proven record as mining project manager for project accomplishments and presenting to BoD & Stakeholder.

Mining / Mine Plan Engineer

(+62)81222829625

Biola No. 8 Bandung, Jawa Barat, ID
[email protected]

Skill & Achievement


Mining

  1. Supervised 900k tpm delivery and coal quality assessed front to barge.
  2. Managed fleet match 25-PC2000 & 3-EX3500 with 140-HD785.
  3. Improved Pit-CPP haul cap. (22k to 25k tpd) with 6-Double Trailer Trial.
  4. Reduced 48-HD785+HD777 FBR (save 7% fuel) by ECO-Mode optimization.

Mine Plan

  1. Orchestrated nickel wet ore blending prod. (RKEF, Heap Leach, and HPAL) to optimize additional 2 million reserve.
  2. Implemented:
  • Open pit coal avg. SR 5:1 within 14Ha with crest-toe level 45m (LOM 4yr)
  • Open-cast nickel avg. SR 1.64:1 and COG Ni 1.6% within 1.24k Ha with crest- toe level 85m (LOM 12yr)

General Mgt. Ops.

  1. Reduced 2018 Q1-Q2 Incident Rate 11% by implementing Safety Accountability Program (SAP)
  2. Facilitated EHS Automation System Upgrade (RFID) with Auto Tracking + Clustering Data
  3. Implemented Radial Crusher Design Construction (CR-12) for coal blending variance (5-6 types) 
  4. Reduced 3s of barge mooring time by implementing dredge operation.

Exploration

  1. Led 1 unit Jackro 175 drilling ops. in 2 months resulting 800k ton coal resources with GAR 3300-3500 (Balikpapan formation).
  2. Led 2 unit Jackro 175 drilling ops. in 3 weeks resulting 150k ton coal resources with GAR 4400-4900 (Pulaubalang formation).

Software & Device

  1. Mining Design (Vulcan 8, Surpac 6.4.1, Datamine Studio 3, Minex 6.3, Minescape 5.7)
  2. Mapping & Geotechnical (GPS, Surfer 13, Global Mapper, Slide, Rocfall)
  3. Data Analytics & Presentation (Excel Pivot + Visual Basic, PPT Thinkcell, Project Gantt Chart, Visio Flowchart)
  4. Drafting & Design (CAD Civil 3D, SketchUp)
  5. Video (AdPremiere + DJI Phantom 4)

Marketing & Language

  1. Obtained off-takers agreement with coal trader/buyer (Glencore, Far East, Nobel, and HMS Bergbau Indonesia).
  2. Obtained a discounted fee sample analysis (10%) with Geoservices Lab.
  3. Obtained a discounted price (10%) and 2-stage term of payment instead of full payment in advance with Coates Service & Valfrol Dewatering.
  4. Advanced proficient in English Business Conversation (iBT 87), native in Bahasa

Projects

Projects 01 00@2x

Spearheaded ECO Mode research by experiencing it directly on operator cabin (HD785 / CAT 777) by:

1. Utilize ECO Mode, evaluate Modular data bank, and optimize ECO Mode (Komatsu/CAT)

2. Fuel Efficiency results: 7-11% lesser FBR (lt/hr) with minimum usage 60% ECO Mode.

Projects 01 01@2x

Facilitated EHS and Compliance System Upgrade by:

1. Integrating technology RFID, cloud database, and on-site personnel activity (inspection-investigation etc.)

2. EHS Automation results: Comprehensive Site-to-HQ Live EHS Data for deep analytical of preventive incident presented with interactive (custom design).

Projects 01 02@2x

Generated opportunity of new marketing products with:

1. Implementing Radial Stacker Crusher Design (CR-12) to prepare 5-6 coal qualities blending

2. Total project value approx. $3million.

Work Experience

PT. Sulawesi Cahaya Mineral, Mine Planning Engineer
Dec 2018 ~ Present

Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator

• Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown.
• Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration.
• Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Syjloebslimusj5clrpp

PT Indo Mining Services, Mining Project Manager
Jun 2018 ~ Dec 2018

Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Verbal and Written Communication Skills

• Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation).
• Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review.
• Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner).
• Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Cryrmebhq2xfijyvpnba

PT Berau Coal, Mining Engineering and General Management Operation Jul 2016 ~ Jun 2018

Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator

• Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director.
• Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge.
• Managing lead 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785.
• Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied.
• Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Hwj3d7qvcg5bxg7jgdev

PT Rokatera Prima Minera, Mining Geology and Planning Engineer

Oct 2014 ~ Jul 2016

Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience

• Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown.
• Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources.
• Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Dalgadzlkerbgilyau1g

PT LAPI ITB, Mining Environment Researcher
Oct 2013 ~ Oct 2014

Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by:

• Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis.
• Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.
Peydqgvkusldmnezdkt2

Education

Institut Teknologi Bandung, Master of Science (MS), Mining Engineering & Mine Environmental Management, 2013 ~ 2014

• 1 year fast track graduate program with full ITB Dean Scholarship focusing on Mine Environmental Mgt. Engineering (Geochemist & Mine Reclamation).
• Thesis project in open pit coal PT Bukit Asam to predict ARD/AMD potential by characterizing Cubical-Framboidal Pyrite in order.
• AJ-BCEP Student Exchange with a participant from ASEAN and Japan University Student with 3 campuses visited:
a. Institut Teknologi Bandung, Laboratorium visit, and Pongkor Underground Gold Mine, Bogor-Indonesia
b. Chulalongkorn University and Gypsum Open Pit Mine, Thailand
c. Kyushu University, laboratorium visit, and CINEST Resources Symposium Speaker in Kyushu-Japan
• 2013 CINEST Earth Resources Symposium Speaker in Kyushu-Japan, about Vein Deposit Gold Exploration report.
Jkere2ucmqecoztkpb8y

Institut Teknologi Bandung, Bachelor of Science (BS), Mining Engineering & Mining & Oil Exploration, 2009 ~ 2013

• 4 year undergraduate program with 2 years ITB Dean Scholarship focusing on Mining Engineering (Coal and Mineral Exploration, Planning, and Operation).
• Thesis project in creating a quantitative table of Resource-Reserve Conservation Evaluation by: a. Converting Indonesia Mineral and Energy Ministry Regulation into a quantitative table. b. Assessing exploratory documents and annual production - financial reports from 4 major mining corporate (Newmont Copper & Gold, KBK Gold, NHM Copper & Iron Ore) as a subject to evaluate.


• Field Leader of ITB Mining Student Orientation.
• Head of Logistics and Documentation Division of ITB President Election.
• Facilitator of ITB Oil-Gas-Mining Professional Discussion.
Bx1qzb8ghug2zifldddf
履歷
個人檔案
Iypr3kseyjjcmp3ifm4h

Roby Syuhada

Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis.
Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result.
Proven record as mining project manager for project accomplishments and presenting to BoD & Stakeholder.

Mining / Mine Plan Engineer

(+62)81222829625

Biola No. 8 Bandung, Jawa Barat, ID
[email protected]

Skill & Achievement


Mining

  1. Supervised 900k tpm delivery and coal quality assessed front to barge.
  2. Managed fleet match 25-PC2000 & 3-EX3500 with 140-HD785.
  3. Improved Pit-CPP haul cap. (22k to 25k tpd) with 6-Double Trailer Trial.
  4. Reduced 48-HD785+HD777 FBR (save 7% fuel) by ECO-Mode optimization.

Mine Plan

  1. Orchestrated nickel wet ore blending prod. (RKEF, Heap Leach, and HPAL) to optimize additional 2 million reserve.
  2. Implemented:
  • Open pit coal avg. SR 5:1 within 14Ha with crest-toe level 45m (LOM 4yr)
  • Open-cast nickel avg. SR 1.64:1 and COG Ni 1.6% within 1.24k Ha with crest- toe level 85m (LOM 12yr)

General Mgt. Ops.

  1. Reduced 2018 Q1-Q2 Incident Rate 11% by implementing Safety Accountability Program (SAP)
  2. Facilitated EHS Automation System Upgrade (RFID) with Auto Tracking + Clustering Data
  3. Implemented Radial Crusher Design Construction (CR-12) for coal blending variance (5-6 types) 
  4. Reduced 3s of barge mooring time by implementing dredge operation.

Exploration

  1. Led 1 unit Jackro 175 drilling ops. in 2 months resulting 800k ton coal resources with GAR 3300-3500 (Balikpapan formation).
  2. Led 2 unit Jackro 175 drilling ops. in 3 weeks resulting 150k ton coal resources with GAR 4400-4900 (Pulaubalang formation).

Software & Device

  1. Mining Design (Vulcan 8, Surpac 6.4.1, Datamine Studio 3, Minex 6.3, Minescape 5.7)
  2. Mapping & Geotechnical (GPS, Surfer 13, Global Mapper, Slide, Rocfall)
  3. Data Analytics & Presentation (Excel Pivot + Visual Basic, PPT Thinkcell, Project Gantt Chart, Visio Flowchart)
  4. Drafting & Design (CAD Civil 3D, SketchUp)
  5. Video (AdPremiere + DJI Phantom 4)

Marketing & Language

  1. Obtained off-takers agreement with coal trader/buyer (Glencore, Far East, Nobel, and HMS Bergbau Indonesia).
  2. Obtained a discounted fee sample analysis (10%) with Geoservices Lab.
  3. Obtained a discounted price (10%) and 2-stage term of payment instead of full payment in advance with Coates Service & Valfrol Dewatering.
  4. Advanced proficient in English Business Conversation (iBT 87), native in Bahasa

Projects

Projects 01 00@2x

Spearheaded ECO Mode research by experiencing it directly on operator cabin (HD785 / CAT 777) by:

1. Utilize ECO Mode, evaluate Modular data bank, and optimize ECO Mode (Komatsu/CAT)

2. Fuel Efficiency results: 7-11% lesser FBR (lt/hr) with minimum usage 60% ECO Mode.

Projects 01 01@2x

Facilitated EHS and Compliance System Upgrade by:

1. Integrating technology RFID, cloud database, and on-site personnel activity (inspection-investigation etc.)

2. EHS Automation results: Comprehensive Site-to-HQ Live EHS Data for deep analytical of preventive incident presented with interactive (custom design).

Projects 01 02@2x

Generated opportunity of new marketing products with:

1. Implementing Radial Stacker Crusher Design (CR-12) to prepare 5-6 coal qualities blending

2. Total project value approx. $3million.

Work Experience

PT. Sulawesi Cahaya Mineral, Mine Planning Engineer
Dec 2018 ~ Present

Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator

• Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown.
• Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration.
• Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Syjloebslimusj5clrpp

PT Indo Mining Services, Mining Project Manager
Jun 2018 ~ Dec 2018

Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Verbal and Written Communication Skills

• Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation).
• Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review.
• Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner).
• Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Cryrmebhq2xfijyvpnba

PT Berau Coal, Mining Engineering and General Management Operation Jul 2016 ~ Jun 2018

Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator

• Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director.
• Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge.
• Managing lead 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785.
• Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied.
• Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Hwj3d7qvcg5bxg7jgdev

PT Rokatera Prima Minera, Mining Geology and Planning Engineer

Oct 2014 ~ Jul 2016

Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience

• Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown.
• Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources.
• Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Dalgadzlkerbgilyau1g

PT LAPI ITB, Mining Environment Researcher
Oct 2013 ~ Oct 2014

Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by:

• Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis.
• Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.
Peydqgvkusldmnezdkt2

Education

Institut Teknologi Bandung, Master of Science (MS), Mining Engineering & Mine Environmental Management, 2013 ~ 2014

• 1 year fast track graduate program with full ITB Dean Scholarship focusing on Mine Environmental Mgt. Engineering (Geochemist & Mine Reclamation).
• Thesis project in open pit coal PT Bukit Asam to predict ARD/AMD potential by characterizing Cubical-Framboidal Pyrite in order.
• AJ-BCEP Student Exchange with a participant from ASEAN and Japan University Student with 3 campuses visited:
a. Institut Teknologi Bandung, Laboratorium visit, and Pongkor Underground Gold Mine, Bogor-Indonesia
b. Chulalongkorn University and Gypsum Open Pit Mine, Thailand
c. Kyushu University, laboratorium visit, and CINEST Resources Symposium Speaker in Kyushu-Japan
• 2013 CINEST Earth Resources Symposium Speaker in Kyushu-Japan, about Vein Deposit Gold Exploration report.
Jkere2ucmqecoztkpb8y

Institut Teknologi Bandung, Bachelor of Science (BS), Mining Engineering & Mining & Oil Exploration, 2009 ~ 2013

• 4 year undergraduate program with 2 years ITB Dean Scholarship focusing on Mining Engineering (Coal and Mineral Exploration, Planning, and Operation).
• Thesis project in creating a quantitative table of Resource-Reserve Conservation Evaluation by: a. Converting Indonesia Mineral and Energy Ministry Regulation into a quantitative table. b. Assessing exploratory documents and annual production - financial reports from 4 major mining corporate (Newmont Copper & Gold, KBK Gold, NHM Copper & Iron Ore) as a subject to evaluate.


• Field Leader of ITB Mining Student Orientation.
• Head of Logistics and Documentation Division of ITB President Election.
• Facilitator of ITB Oil-Gas-Mining Professional Discussion.
Bx1qzb8ghug2zifldddf