Material Planner
緯創資通股份有限公司
・
Full-time庫存物料控制。
簡化報表。將物料報表適量的自動化, 平均減少60%的製作時間,並且減少人為錯誤。
將現有的物料及生產系統,移植到新廠區,並且不定時與新廠區的物控工程師,進行系統及物料方面的訓練。
針對比較容易短缺的物料,根據生產計畫以及物料的進貨日期,進一步分配生產線之間的物料數量。
- Inventory material control
- Streamlining reports by implementing a suitable level of automation for material reports, reducing the average production time by 60% and minimizing human errors
- Migrating existing material and production systems to a new production site, while periodically conducting system and material management training with material control engineers at the new site
- Allocating material quantities between production lines more effectively for materials prone to shortages, considering the production plan and material delivery dates