Avatar of yery awan susanto.

yery awan susanto

Construction Manager
RAPID INFRASTRUCTURE
Brawijaya University

Work experiences

Construction Manager

RAPID INFRASTRUCTURE

Jul 2020 ~ Dec 2021
1 yr 6 mos
BATIK PROJECT - SUGAR MILL PLANT Muria Sumba Manis Responsibility : - Monitoring progress and all activity - Make procedure for construction work - Make schedule for construction - Make sure that all works as per standart and specification. - Review, monitoring and make solvent problem - Held coordination meeting with subcont/vendor for mechanical activities - Assist precom and commissioning activities

Preservation Coordinator

PERTAMINA

Sep 2021 ~ Nov 2021
3 mos
JAMBARAN TIUNG BIRU- GAS PLANT PERTAMINA Cepu Responsibility : - Preservation for all equipment and material from damage and corrosion - Make sure all material and equipment storage in proper and suitable with vendor and client requirement - Carry out the periodical care and protection with the assistance from material controller and quality control. - Conduct inspection with client to check periodic as per preservation schedule - Make schedule preservation for all equipment as per vendor requirement - Make sure all equipment and material that they are maintained correctly free from corrosion and damage

TEHNIK

PT.INTIKARYA PERSADA

Jan 2017 ~ Dec 2018
2 yrs 0 mos

Construction Manager

CEMARA SEMITAMA

Jul 2017 ~ Dec 2017
6 mos
SUBAN COMPRESSOR PROJECT Responsibility : - Install rotating equipment GTC , GTG , pump , ACHE - Install static equipment separator , scubber , Ko drum , degassing , etc - Install package equipment Air instrument and compressor package , flare stack , - Make procedure for mechanical work - Make rigging study - Make schedule for mechanical work - Make sure that rotating and static works as per standart and specification. - Inspection fist aligment until final aligment. - Inspection for solo run motor - Inspection for mechanical run rotaring equipment and package equipment. - Inspection for Site Accetance Test - Quality Assurance of rotating , static and package Works. - Study and review site condition for mechanical work - Held coordination meeting with subcont/vendor for mechanical activities - Provide list of mechanical equipment - Provide list of mechanical monitoring and progress - Provide mechanical work schedule base on master schedule - Review , monitoring and make solvent problem for mechanical - Provide and submit RFI for all mechanical sequence inspection - Held the joint inspection with Subcon and Client mechanical activities - Held the supervision for all mechanical site activities. - Assist mechanical precomm and commissioning activities - Assist precom and commissioning activities - Assist mechanical function test activities - Attended in daily coordination meeting with management July 2017 - December 2017 PT. CEMARA SEMITAMA , JAKARTA Construction Manager

Test Package Coordinator

PETRONAS

Feb 2015 ~ Mar 2016
1 yr 2 mos
Responsibility : - Prepare test package document - Solve document test package problem - Manage all line check actifity - Solve line check actifity problem - Conduct hydrotest - Prepare Manpower, tool and equipment for hydro test - Prepare test package/test block piping. - Prepare schedule and planning hydrotest and test package - Check & review the design drawing as per P&ID. - Review document for as build drawing. - Solve engineering problem - Monitoring progress line check and test package - Coordination with construction team for punch list item and killing punch list - Coordination with precomm ang process team about priority test package - Coordination with QC team for complete document test package - Conduct line check and killing punch list with client

Piping and Mechanical engineer

PMC PT. PERTAMINA

Jan 2014 ~ Feb 2015
1 yr 2 mos
JAVA GAS DEVELOPMENT PROJECT Responsibility : 1 - Make sure that rotating works as per standart and specification. - Joint survey for inspection elevation, grouting, and aligment - Inspection fist aligment until final aligment. - Inspection for solo run motor - Inspection for mechanical run rotaring equipment and package equipment. - Inspection for Site Accetance Test - Inspection fof complete unit test - Quality Assurance of rotating Works. - Analysis problem, calculation, and final design. - Line check and command for construction. - Check & review the design drawing as per P&ID. - Review document for as build drawing. - Review and check mechanical data sheet and mechanical drawing - Provide list of mechanical monitoring and progress - Study and review site condition for mechanical work - Held coordination meeting with contractort/vendor for mechanical activities 2 - Line check and command for construction. - Inspection for post test - Inspection for blowing up - Check & review the design drawing as per P&ID. - Review document for as build drawing. 3 - Make sure that static works as per standart and specification. - Inspection for elevation, centerline and plumness. - Inspection for boxing up/loading test - Review document for as build drawing.

Mechanical Engineer

TRUBA JAYA ENGINEERING

Jun 2012 ~ Mar 2014
1 yr 10 mos
Piping Onshore Pigging Facility Upgrade Batch 1 shutdown on Conoco Phillip - Suban and gressik plant south sumatra Responsibility : - Excecution Plan - Provide project work schedule base on master schedule - Make Manpower , equipment and tool plan - Make budget plan - Provide list of project monitoring and progress - Provide project work schedule base on master schedule - Study and review site condition - Prepare Material Take Off (MTO) - Prepare BQ - Controlling document June 2012 - March 2014 PT. TRUBA JAYA ENGINEERING Mechanical Engineer

Site Manager

SHAFTINDO ENERGY

Mar 2013 ~ Jan 2014
11 mos
JAVA GAS DEVELOPMENT PROJECT Responsibility : 1 - Make sure that rotating works as per standart and specification. - Joint survey for inspection elevation , grouting , and aligment - Inspection fist aligment until final aligment. - Inspection for solo run motor - Inspection for mechanical run rotaring equipment and package equipment. - Inspection for Site Accetance Test - Inspection fof complete unit test - Quality Assurance of rotating Works. - Analysis problem , calculation , and final design. - Line check and command for construction. - Check & review the design drawing as per P&ID. - Review document for as build drawing. - Review and check mechanical data sheet and mechanical drawing - Provide list of mechanical monitoring and progress - Study and review site condition for mechanical work - Held coordination meeting with contractort/vendor for mechanical activities 2 - Line check and command for construction. - Inspection for post test - Inspection for blowing up - Check & review the design drawing as per P&ID. - Review document for as build drawing. 3 - Make sure that static works as per standart and specification. - Inspection for elevation , centerline and plumness. - Inspection for boxing up/loading test - Review document for as build drawing. March 2013 - Jan 2014 PT. SHAFTINDO ENERGY Site Manager

Field Engineer

Solve engineering problem

Dec 2004 ~ Oct 2006
1 yr 11 mos
FABRICATION EXPANSION PLANT OF GIIC PELLET PLANT KINGDOM OF BAHRAIM, MIDDLE EAST . Responsibility : - Monitoring fabrication on workshop - Monitoring progress, Manpower and productivity of fabrication - Coordination with client for engineering problem. - Make procedure for fabrication - Make plan and schedule fabrication - Coordination with superintendent and supervisor for target and scheduling project - Reporting to shop manager. - Make schedule and planning fabrication. Professional Membership :

Educations

Brawijaya University

Bachelor of Engineering (BEng)
Mechanical Engineering

-
Powered By CakeResume