Bachelor Degree of Mechanical Engineering from Bandung Institute of Technology. Experienced Engineer and supervisor in steel industry. Skilled on managing projects for about 2 years, Planning (material, work order, and budgeting) for about 7 years , performing root cause analyses with DMAIC method on problems, and managing inventories. Experience with Google Docs, Midasgen, ERP, SolidWorks, and Microsoft Office (Excel, Word, Powerpoint, and Outlook).
Jakarta, Indonesia Valdo Naibaho [email protected]
August 2016 - Present
- Project leader of belt conveyor assessment at sinter plant (current)
- Project leader for rod mill sinter plant vibration reduce (2023)
- Project Member of pick up crane 40 ton investment and rail extension (2021)
- Project leader for hot metal crane main hook 480 ton exchange and testing (2020)
- Project leader for pick up crane tong key modification (2019)
- Reviewing the safety facility and safety SOP
- Budget management
- Inventory management, including optimum and safety stock, update and follow up (to procurement team, third parties, and warehousing team) the inventory delivery status, update and monitoring inventory
- Managed outsourcing company with 35 members (5 Korean and 30 Indonesian)
- Soft service management (Driver management, waste management, antivirus and mail phishing program, and daily security check)
March 2015 - August 2016
- Visually inspected and tested machinery and equipment, performing routine preventive maintenance.
- Developed work scope for contracted projects, analysing received quotes and recommending preferred vendors.
- Performed troubleshooting and repair on complex mechanical equipment, especially auxiliary facilities of blast furnace (stock house, scrubber, and pulverize coal injection)
January 2010 - March 2010
- Internship program, as facility operation and maintenance
- Learned about the analysis of heat transfer process in a vacuum furnace.
- Performed calculations according to standard procedures.
Modified structure of belt conveyor to prevent collapse, by doing analysis and assessment
Invest new main hook beam to prevent failure after 8 years of using, at the same time adding spare for this unit
Modified old tong key by installing proximity sensor to prevent crane falling while lifting
Extend rail to increase range of pick up crane and can access transfer car ( to transfer slab to the new plant)
- Member of Himpunan Mahasiswa Mesin (HMM) ITB, Persekutuan Mahasiswa Kristen (PMK) ITB, Unit Kesenian Sumatera Utara (UKSU) ITB, and Apresiasi Senin (Apres) ITB.
- Elected to Olahraga, seni, dan komunikasi (Orsenkom ) member for Himpunan Mahasiswa Mesin (HMM) ITB in
- Assistant coordinator of fluid machinery laboratorium ITB.
- Assistant coordinator of Kebijakan Iklim course Metrology assistant practice.
- Best group in 2nd quarter meeting 2022 in facility department
- Best employee in 2nd quarter meeting 2022 in facility department
- Achieved best team 2021 in facility department through effectively prevent downtime (0 HOUR)
- Mega-Y Project award, Reduce Material Cost by reuse repaired S/Conveyor mold of PCM
- Used Microsoft Excel to develop inventory tracking spreadsheets.
- Achieved 3rd place in Krakatau Posco's schooling program (KP Infinity)
- Collaborated with team of plate mill team in the development of overhead magnet crane improvement.
- Supervised team of 35 staff members including contractors.
Issued June 2023 · No Expiration Date
Issued May 2023 · No Expiration Date
110218-OPK3-OC/PAA/XI/2021
Issued November 2021 · No Expiration Date
10790/TKBT-TK2/X/2018
Issued October 2018 · No Expiration Date