王志昌 

Chih Chang Wang

84 . 04 . 22            

• 0981376910/0979247736

• t104310523@ntut.org.tw  

• 7F, No.155, Dade Rd., Sansia Dist., New Taipei City  

WORK EXPERIENCE

Equipment Engineer(WET)   •  Taiwan Semiconductor Manufacturing 

Sep 2019 -  Oct 2021

Equipment maintenance & installation / Test and debug sub-system and system level issues / Product defect analyses & improvement / Provide solutions to tooling and test fixtures for risk retirement / Knowledgeable in Semiconductor process / Communication & co-work with colleague

Project Engineer  •  Walsin Lihwa Corporation Company

May 2018 - Aug 2019

Import Industry 4.0  / Import & Analysis Automatic equipment / Import exploratory data analysis(EDA) system / Total Productive Management / Equipment abnormal handling Standard maintenance SOP / Analysis equipment rehabilitation 

Electronic Control Engineer  •  Leo Ultrasonic Co. , LTD. 

Aug 2015 - Apr 2018

Equipment & Electronic system design / Import equipment into the factory

EQUIPMENT EXPERIENCE

Improve Water Surface Defect  

Research different material of chamber wall to reduce the probability of chemical dropping problem. (We use TFPE to replace FPE.)

Install New Machine For Exhaust Low 

New tool chamber exhaust specification need to be above 1000mPA, but facility end could only offer to 800mPA.I come out a solution that add some blowers in exhaust pipeline between machine end to facility end.

Solve Chemical dropping problem

When Arm move to home position since the wafer process ending, some dropping problems would happen. Our team come out a solution that install suckback valve between flow meter to Arm pipeline.



EDUCATION                                                      SKILLS

Bachelor

National Taipei University of Technology 

Electrical Engineering 

  • Electrical equipment testing / researching 
  • Automatic equipment designing
  • Electrical equipment installation / controlling
  • Equipment improvement

ABOUT ME

Due to the highly enthusiasm of Electrical engineering, I decide to put myself into this area.

I was on duty independently as a newbie in TSMC in six months. And I also have many experiences about wet cleaning. I’m familiar with the machines of LAM like DV, DVP, EOS, and SEZ 4300 series. In addition, I successfully installed new machine independently in one month and got a good result.

I have strong self-learning ability to learn new things and related skills,  such as lay-out planning and RFID. In the end, I'm looking forward to have the opportunity to get this job!