Innovated and energetic Mine Planning Engineer with 6 years of experiences in Coal and Nickel Mining operation complements with Master of Science (M.Sc.) Mining Engineering. Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis. Generated an additional 18.5% coal reserve (total 1.9 million ton coal) by optimising Life Of Mine pit designs using Minex6.4 with 40k ton per month production. Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project, formulated contractors KPI evaluation table based on production and safety quarter performance with penalty-award applied, saved 7% fuel usage by optimising ECO Mode in 3 months, and boosted 13% coal haul capacity (Pit-to-Port) by leading 6 Double Trailer Trial. Succeed to deliver all milestone project 1 month ahead of the schedule ($1.95million project worth) with 7% budget saving and develop weekly observation with HSEC contractor as a safety operation mentor to develop safety awareness.
Logo of PT. Sulawesi Cahaya Mineral.
PT. Sulawesi Cahaya Mineral
Logo of Institut Teknologi Bandung.
Institut Teknologi Bandung
West Java, Indonesia

Skills

Coal Mining
Nickel
Mine Planning
General Management
Presentation Skills
Vulcan
Surpac
data analysis and dashboarding
Supply Chain Management
Drone Piloting
Project Management Skills

Work experiences

Logo of PT. Sulawesi Cahaya Mineral.

Mine Planning Engineer

PT. Sulawesi Cahaya Mineral

Dec 2018 ~ Present
Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator • Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown. • Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study. • Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration. • Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Logo of PT Indo Mining Services - ENA Project.

Project Manager

PT Indo Mining Services - ENA Project

Jun 2018 ~ Dec 2018
7 mos
Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Communication Skills • Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation). • Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review. • Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner). • Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Logo of PT Berau Coal.

Mining Engineer and General Management Operation

PT Berau Coal

Aug 2016 ~ Jun 2018
1 yr 11 mos
Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator • Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director. • Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge. • Led 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785. • Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied. • Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Logo of PT Rokatera Prima Minera.

Mining Geology and Planning Engineer

PT Rokatera Prima Minera

Oct 2014 ~ Jul 2016
1 yr 10 mos
Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience • Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown. • Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study. • Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources. • Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Logo of PT LAPI ITB.

Mining Environment Researcher

PT LAPI ITB

Oct 2013 ~ Oct 2014
1 yr 1 mo
Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by: • Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis. • Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.

Educations

Logo of Institut Teknologi Bandung.

Institut Teknologi Bandung

Master of Science (MS)
Mining Engineering, Mine Environmental Management

2013 - 2014
3.6/4 GPA
Activities and societies
Conduct research with study cases of the geochemical map of pyrite in open-pit mining refers to coal basin genesis with a total sulfur value approach. Lead the research with a partner in conducting five tests (Static, Kinetic, XRD, XRF, Mineralogy) to characterize and measure Acid Rock Drainage potential also to predict dispersion pattern of organic and an-organic sulfur refers to acid mine drainage agent.
Description
Fast track master program starts from 4th years bachelors program until 1-year after bachelor graduation.
Logo of Institut Teknologi Bandung.

Institut Teknologi Bandung

Bachelor of Science (BS)
Mining Engineering, Mining & Oil Exploration

2009 - 2013
3.3/4 GPA
Activities and societies
ITB Student Mining Committee Leadership Training Professional Division Walk-In Interview Committee 3rd winner of PERHAPI Student Paper Competition Head Dept. of Documentation and Logistic in ITB President Election Committee
Description
My research is to highlight every key parameter in coal & mineral conservation policy from the Indonesia Ministry of Energy and Mineral that must be applied in mining industries starting from exploration stages. By reviewing and assessing abundant of an exploratory document and annual production - financial report from 4 major mining corporate (coal, copper and gold mining) as my secondary data, I could measure how far conservation method is applied by those corporate using Conservation Valuation Table that I formulated with Ministry Regulation as my blueprint.