- Jobs
- Resume
Resume Builder
Make a resume for free.
Resume Templates
Find the best resume template.
Resume Guide
Resume guide & examples for all jobs/industries.
Resume Format
Choose the right resume format.
How to Write a Resume
Write a professional resume.
Resume Help
Explore more resume writing resources.
Resume Builder Pricing Plans
- CV
- Portfolio
- Articles
For job seekers
Resume, Cover Letter Tutorials
Job Search Tips
Interview Skills
Career Development
Job Search Channels
People or Company Interviews
For employers
Hiring Tips
Work with Recruitment Agency
All Articles
Talent Connect Podcast
We invite talents in different fields to share their interesting career stories.Apple Podcast
Google Podcast
Spotify
- Hire
Talent Search
Find Resumes.Job Posting
Start for Free.Recruitment Services
Acquire Talent.Employer Branding
Build and promote your employer brand.BETAJobEspresso Recruitment Platform
Contact mid-senior level talent on JobEspresso, and find the right employees quickly.Job Posting Pricing Plans
Talent Search Pricing Plans
- Community

Roby Syuhada
Mine Planning Engineer
Innovated and energetic Mine Planning Engineer with 6 years of experiences in Coal and Nickel Mining operation complements with
Master of Science (M.Sc.) Mining Engineering.
Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis.
Generated an additional 18.5% coal reserve (total 1.9 million ton coal) by optimising Life Of Mine pit designs using Minex6.4 with 40k ton per month production.
Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project, formulated contractors KPI evaluation table based on production and safety quarter performance with penalty-award applied, saved 7% fuel usage by optimising ECO Mode in 3 months, and boosted 13% coal haul capacity (Pit-to-Port) by leading 6 Double Trailer Trial.
Succeed to deliver all milestone project 1 month ahead of the schedule ($1.95million project worth) with 7% budget saving and develop weekly observation with HSEC contractor as a safety operation mentor to develop safety awareness.
Professional Background
Current status
-
Profession
Other
Fields
Mining Metals
Work experience
4-6 years
Management
-
Skills
Coal MiningNickelMine PlanningGeneral ManagementPresentation SkillsVulcanSurpacdata analysis and dashboardingSupply Chain ManagementDrone PilotingProject Management Skills
Job search preferences
Desired job type
Full time・Interested in working remotely
Desired positions
Mining / Mine Plan Engineer
Desired work locations
-
Freelance
-
Work Experience
Mine Planning Engineer
December 2018 - Present3 yrs6 mos
Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator • Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown. • Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study. • Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration. • Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.Project Manager
PT Indo Mining Services - ENA Project
June 2018 - December 20187 mos
Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Communication Skills • Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation). • Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review. • Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner). • Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.Mining Engineer and General Management Operation
August 2016 - June 20181 yr11 mos
Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator • Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director. • Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge. • Led 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785. • Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied. • Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.Mining Geology and Planning Engineer
October 2014 - July 20161 yr10 mos
Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience • Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown. • Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study. • Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources. • Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).Mining Environment Researcher
October 2013 - October 20141 yr1 mo
Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by: • Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis. • Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.
Education
Institut Teknologi Bandung
Master of Science (MS)・Mining Engineering, Mine Environmental Management
2013 - 2014・ 3.6/4 GPA
Activities and societies
Conduct research with study cases of the geochemical map of pyrite in open-pit mining refers to coal basin genesis with a total sulfur value approach. Lead the research with a partner in conducting five tests (Static, Kinetic, XRD, XRF, Mineralogy) to characterize and measure Acid Rock Drainage potential also to predict dispersion pattern of organic and an-organic sulfur refers to acid mine drainage agent.Description
Fast track master program starts from 4th years bachelors program until 1-year after bachelor graduation.Institut Teknologi Bandung
Bachelor of Science (BS)・Mining Engineering, Mining & Oil Exploration
2009 - 2013・ 3.3/4 GPA
Activities and societies
ITB Student Mining Committee Leadership Training Professional Division Walk-In Interview Committee 3rd winner of PERHAPI Student Paper Competition Head Dept. of Documentation and Logistic in ITB President Election CommitteeDescription
My research is to highlight every key parameter in coal & mineral conservation policy from the Indonesia Ministry of Energy and Mineral that must be applied in mining industries starting from exploration stages. By reviewing and assessing abundant of an exploratory document and annual production - financial report from 4 major mining corporate (coal, copper and gold mining) as my secondary data, I could measure how far conservation method is applied by those corporate using Conservation Valuation Table that I formulated with Ministry Regulation as my blueprint.

Build Your Professional Network
Click icon on the company page or under talent search engine to start the conversation.