CakeResume Talent Search

Advanced filters
On
4 à 6 ans
6 à 10 ans
10 à 15 ans
Plus de 15 ans
Avatar of the user.
Avatar of the user.
Past
Senior Product Application Engineer @Mi Equipment
2021 ~ 2023
Senior Engineer
Dans 1 mois
DOE
FMEA Risk Analysis
MES
Sans Emploi
Prêt à l'interview
Temps plein / Intéressé par le travail à distance
6 à 10 ans
Chung Yuan Christian University
Physic
Avatar of the user.
Avatar of the user.
Deputy Manager @Toshiba International Procurement Corp.
2016 ~ 2019
Project Manager
Plus d'1 an
Computer Software
Coordination
Reviewing
Temps plein / Je ne suis pas intéressé par le travail à distance
10 à 15 ans
Huafan University
Foreign Languages and Literature
Avatar of the user.
Avatar of the user.
Project Enginner @ASE Technology Holding Co., Ltd.
2019 ~ Présent
QA Engineer
Plus d'1 an
Word
Excel
PowerPoint
Employé
Temps plein / Intéressé par le travail à distance
6 à 10 ans
國立嘉義大學
應用數學, 統計
Avatar of Blair Yu.
Avatar of Blair Yu.
Director of Product Engineering @SV TCL
2017 ~ Présent
管理職
Dans 1 mois
Blair Yu Director of Product Engineering at SV TCL Multi-site and Multi-culture communication and team work experience (countries includes Autria, China, Czech, German, Neitherland, Mexico, USA, Switzerland) Problem solving with solid logic thinking Large team (30+ team members) leading and management People and team development Risk assessment with mitigation plan Team coaching and motivation Specialties: SPC, Statistic Process Control Skill and knowledge FMEA analysis and action plan Hsinchu, Hsinchu City, [email protected] https://www.linkedin.com/in/bert-blair-yu-pmp-89334a20/ 工作經歷 一
PowerPoint
Excel
Microsoft Office
Employé
Prêt à l'interview
Temps plein / Je ne suis pas intéressé par le travail à distance
Plus de 15 ans
NTOU (Unofficial)
Material Engineering
Avatar of 林庭揚.
Avatar of 林庭揚.
Process Integration Engineer @Taiwan Semiconductor Manufacturing Company
2014 ~ Présent
Product Engineer
Dans 1 an
@gmail.comSkills Semiconductor (5nm~90nm) Device engineering Semiconductor Process WAT Analysis Yield Analysis Process Quality Test Manufacturing Statistical Process Control (SPC) Cp/Cpk Failure Mode and Effects Analysis (FMEA) Design of Experiments (DOE) PDCA 3-Leg-5-Why 8D Pareto Chart Box Plot & Normal Quantile Plot Failure Analysis Tool JMP software Transmission Electron Microscopy (TEM) Energy-dispersive X-ray spectroscopy (EDX) Work Experience TSMC, Process Integration Engineer Nov 2014 ~ Present 5nm process experience for new product tape-out, yield/device improvement, process optimization and risk assessment. More than moore products' experience including 40/55
Temps plein / Intéressé par le travail à distance
4 à 6 ans
Cheng Kung University
Electrical Engineering
Avatar of Ripley Li.
Avatar of Ripley Li.
Past
Senior Mechanical Design Engineer @Smartmatic
2018 ~ 2024
Lead mechanical engineer
Dans 1 mois
sheet metal module. ‐ Validate the layout and module function, establish evaluation plan for testing according to the industry-specific regulations and standards, ensuring designs comply with relevant requirements. ‐ Collect CMF and DFM for tooling open, driving technical knowledge transfer to mass production. ‐ Establish and evaluate the tolerance analysis, statistical analysis for the quality control. ‐ Draft new product development and quotation to customer, ensuring the cost-effectiveness and cost optimization. ‐ Spot the creative mindset to propose and implement innovative solutions to the engineering challenges and then register the new patent, e.g., Paper staging
Creo Parametric
CREO PARAMETRIC
Microsoft Office
Sans Emploi
Prêt à l'interview
Temps plein / Intéressé par le travail à distance
Plus de 15 ans
國立中央大學 National Central University
Mechanical Engineering
Avatar of Rakesh Ramachandran.
Avatar of Rakesh Ramachandran.
Team Lead @Real Team Systems Pvt Ltd
2011 ~ 2014
Project Lead / Tech Lead / Team Lead / Senior Engineer
Dans 6 mois
. •Review and document the lesson learnt in the project and deploy / train the stake holders regarding the risks. •Periodic review with supplier to track on child part development and monitor quality feedback to ensure product quality. •Review and approve Micro Level Time Plan, Initial Process Flow, PFMEA, Control Plan (In-house & supplier) . • Be a part of tool trials, to address, analyze and motivate the team for problem solving and achieve project milestone. •Support Sales and Marketing during acquisition phase of the project (Product feasibility check, approximate budget, capacity analysis and project summary). •Participate
PowerPoint
Excel
Employé
Temps plein / Je ne suis pas intéressé par le travail à distance
10 à 15 ans
MGM's Jawaharlal Nehru Engineering College
Production / Industrial

Le Plan de Recrutement le Plus Efficace et Facile

Recherchez 800.000 CV et prenez l'initiative de contacter les candidats pour améliorer votre taux de recrutement. Le Choix de Centaines d'Entreprises

  • Consulter tous les résultats
  • Démarrer des nouvelles conversations sans limites
  • Seules les entreprises avec un abonnement peuvent consulter les CV
  • Consulter les adresses email et les numéros de téléphone des utilisateurs
Conseils de Recherche
1
Search a precise keyword combination
senior backend php
If the number of the search result is not enough, you can remove the less important keywords
2
Use quotes to search for an exact phrase
"business development"
3
Use the minus sign to eliminate results containing certain words
UI designer -UX
Seuls les CV publics sont disponibles avec pour les utilisateurs gratuits.
Mettez à niveau vers un abonnement Supérieur pour voir tous les résultats de recherche dont des dizaines de milliers de CV exclusifs à CakeResume.

Definition of Reputation Credits

Technical Skills
Specialized knowledge and expertise within the profession (e.g. familiar with SEO and use of related tools).
Problem-Solving
Ability to identify, analyze, and prepare solutions to problems.
Adaptability
Ability to navigate unexpected situations; and keep up with shifting priorities, projects, clients, and technology.
Communication
Ability to convey information effectively and is willing to give and receive feedback.
Time Management
Ability to prioritize tasks based on importance; and have them completed within the assigned timeline.
Teamwork
Ability to work cooperatively, communicate effectively, and anticipate each other's demands, resulting in coordinated collective action.
Leadership
Ability to coach, guide, and inspire a team to achieve a shared goal or outcome effectively.
Dans 1 mois
Global Service Manager
Logo of Lenovo.
Lenovo
2022 ~ Présent
台灣台北市
Professional Background
Statut Actuel
Employé
Progrès de la Recherche d'Emploi
Professions
Customer Service / Support
Fields of Employment
Électronique Grand Public
Expérience Professionnelle
4 à 6 ans
Management
I've had experience in managing 1-5 people
Compétences
word
english
excel
powerpoint
Google Drive
Outlook
Teamwork
Coordination
project management
Inventory Management
Cost Reduction Analysis
Forecasting
Logistics Management
Langues
English
Intermédiaire
Chinese
Natif ou Bilingue
Job search preferences
Position Désirée
Production Planner/Project Manager/Supply Chain/Logistics
Type d'emploi
Temps plein
Lieu Désiré
Taipei, 台灣, Taipei City, 台灣
Travail à distance
Intéressé par le travail à distance
Freelance
Oui, je suis actuellement indépendant à temps plein.
Éducation
École
University of Kent
Spécialisation
International Business
Imprimer

陳佳鈴 Joanne 

Chia-ling Chen

Sr. Service Readiness Specialist


I am a positive person with great enthusiasm. I will apply my knowledge to work with independent and rapid adaptation to learn new things, and also be brave to accept challenges. Besides, I have a wealth of experience of working with multiple departments to accumulate knowledge and improve communication skills and flexibility.

  [email protected]   Chia-Ling Chen

Working Experience

Sr. Service Readiness Specialist

Lenovo •  Jun 2022 - Present

As a Service Readiness to monitor server/storage/software NPI service related working list needed to ready before prodcut launch.

  • Seat in project team as a service focal and provide key informaiton to service support team to determine warranty cost and impact of issues on service. 
  • Working with internal stateholders (Project manager, Devlopment, Marketing, Supply Chain, Finance and Quality team) closely to ensure issue impact on service will be resolved and not gateing launch schedule. 
  • Compare responsible product design with predecessor, analyzing its highlight and lowlight in terms of part replacement, service cost saving and problem determination perspective. Suggest improvement to Development team and enlist helpfule resources on service effectiveness. 
  • Be a coordinator between service support team and project team to coordinate work items will on the same page and track issues for resolution.  
  • Monitor service spare parts status and working with planning/fulfilment and procurement team to ensure spare parts will ready in Worldwide HUB before product launch. 
  • Review product information (including user manual, farmware code, prodcut support webpage, repair engineer/repair centre training course) need to ready and publish on product launch date. 
  • Summary annual NPI projects data for managment level review.

Logistic Programe Manager

Wipro Ltd  •  Sep 2021 - May 2022

As a Logistic Programe manager to monitor the daily operation (device inbound/outbound, logistics and inventory management, business process maintain and creation, and the coordination with related stakeholder to provide the optimised service and needs to the customer) for developing NB and analyse the weekly, monthly and quarterly operation data to match the SLO/KPI.

  • Tracking the APAC team daily activity to ensure the operation process correctly. 
  • Collaborate with stakeholder in order to optimise and maintain the operation wisely.
  • Create the business process and documentation for operation standard.
  • Analyse the operation data for SOL/KPI and present the performance to the customer by weekly/monthly/quarterly.
  • Provide to the analysis data and report to the customer based on requirement.

Global Service Manager

ASUSTeK Computer Inc  •  Oct 2019 - 2021 Sep

As a Global Service manager (GSM) establish product service policy and cost optimisation to server, wireless and ODD/Accessories. Besides, I am closely aligned with the business units/sales to concentrated support business prosperity.

  1. Lead 4-5 team members to achieve the right service road map and strategy with reasonable cost.
  2. Coordinate with the cross function team to ensure project and policy will be on schedule.
  3. Perform regularly service cost variance analysis to reduce the risk and abnormal.
  4. Collaborate with the cross function team and provide the management leadership to optimised cost and process by introducing wise CRM, repair material end-to-end planning improvement, product quality and technical problem-solving.
  5. Plan and execute a strong service model and be a cost expert to provide a suitable service policy/solution.

Achievements

  1. Improve current service level limitation for server product to promote pan-EMEA or cross counties/international service and on-site services applying to key region such as TW, US, EU.
  2. Establish centralise repair for wireless product to decreases 0.05% of service cost in CN.
  3. Doing benchmark for OMAP(Chassis, HDD) and accessories (mouse, keyboards, headset, chair…) to provide the best policy then establish an appropriate service for end users under acceptable cost.

Logistics Managment Specialist

ASUSTeK Computer Inc  •  Mar 2015 - Oct 2019

As a logistic management specialist to manage APAC/EMEA regional HUB and 3rd Party repair centre inventory and the process of logistic operation (forward to reverse) created, improvement and announcement. Also, I worked with the cross function team closely to ensure the operation be applied in the right way.

  1. Outsourcing warehouse management included RFQ, contract, performance monitor and QBR.
  2. Plan and monitor the regional repair material be used wisely.
  3. Create and improve the process of back-end supply chain operation deployed to the global service team and collect the feedback to develop the appropriateness.
  4. Report and analysis abnormal inventory regularly to avoid hazard.
  5. Coordinator between HQ and local service team to offer the solution and guidelines. Ensure the operations are alignment in the World Wide.

Achievements

  1. Set up AU outsourcing country HUB in Sydney on 2016. Spare parts transport TAT decreased from 5WD to 2WD and spare parts full fill rate increased from 80% to 90%.
  2. EMEA repair centre reverse logistics process improvement in order to speed up good/bad repair spare part turnover rate was decreased to 1.5 weeks from 5 weeks.
  3. Redefine EMEA bad/idle inventory management process meanwhile eliminate risky stock. As the result, the inventory accuracy was increased 20% to 95%.

Education

University of Kent

International Business •  2013 - 2014

National Kaohsiung First University of Science and Technology

Department of Logistics Management •  2008-2012

Resume
Profile

陳佳鈴 Joanne 

Chia-ling Chen

Sr. Service Readiness Specialist


I am a positive person with great enthusiasm. I will apply my knowledge to work with independent and rapid adaptation to learn new things, and also be brave to accept challenges. Besides, I have a wealth of experience of working with multiple departments to accumulate knowledge and improve communication skills and flexibility.

  [email protected]   Chia-Ling Chen

Working Experience

Sr. Service Readiness Specialist

Lenovo •  Jun 2022 - Present

As a Service Readiness to monitor server/storage/software NPI service related working list needed to ready before prodcut launch.

  • Seat in project team as a service focal and provide key informaiton to service support team to determine warranty cost and impact of issues on service. 
  • Working with internal stateholders (Project manager, Devlopment, Marketing, Supply Chain, Finance and Quality team) closely to ensure issue impact on service will be resolved and not gateing launch schedule. 
  • Compare responsible product design with predecessor, analyzing its highlight and lowlight in terms of part replacement, service cost saving and problem determination perspective. Suggest improvement to Development team and enlist helpfule resources on service effectiveness. 
  • Be a coordinator between service support team and project team to coordinate work items will on the same page and track issues for resolution.  
  • Monitor service spare parts status and working with planning/fulfilment and procurement team to ensure spare parts will ready in Worldwide HUB before product launch. 
  • Review product information (including user manual, farmware code, prodcut support webpage, repair engineer/repair centre training course) need to ready and publish on product launch date. 
  • Summary annual NPI projects data for managment level review.

Logistic Programe Manager

Wipro Ltd  •  Sep 2021 - May 2022

As a Logistic Programe manager to monitor the daily operation (device inbound/outbound, logistics and inventory management, business process maintain and creation, and the coordination with related stakeholder to provide the optimised service and needs to the customer) for developing NB and analyse the weekly, monthly and quarterly operation data to match the SLO/KPI.

  • Tracking the APAC team daily activity to ensure the operation process correctly. 
  • Collaborate with stakeholder in order to optimise and maintain the operation wisely.
  • Create the business process and documentation for operation standard.
  • Analyse the operation data for SOL/KPI and present the performance to the customer by weekly/monthly/quarterly.
  • Provide to the analysis data and report to the customer based on requirement.

Global Service Manager

ASUSTeK Computer Inc  •  Oct 2019 - 2021 Sep

As a Global Service manager (GSM) establish product service policy and cost optimisation to server, wireless and ODD/Accessories. Besides, I am closely aligned with the business units/sales to concentrated support business prosperity.

  1. Lead 4-5 team members to achieve the right service road map and strategy with reasonable cost.
  2. Coordinate with the cross function team to ensure project and policy will be on schedule.
  3. Perform regularly service cost variance analysis to reduce the risk and abnormal.
  4. Collaborate with the cross function team and provide the management leadership to optimised cost and process by introducing wise CRM, repair material end-to-end planning improvement, product quality and technical problem-solving.
  5. Plan and execute a strong service model and be a cost expert to provide a suitable service policy/solution.

Achievements

  1. Improve current service level limitation for server product to promote pan-EMEA or cross counties/international service and on-site services applying to key region such as TW, US, EU.
  2. Establish centralise repair for wireless product to decreases 0.05% of service cost in CN.
  3. Doing benchmark for OMAP(Chassis, HDD) and accessories (mouse, keyboards, headset, chair…) to provide the best policy then establish an appropriate service for end users under acceptable cost.

Logistics Managment Specialist

ASUSTeK Computer Inc  •  Mar 2015 - Oct 2019

As a logistic management specialist to manage APAC/EMEA regional HUB and 3rd Party repair centre inventory and the process of logistic operation (forward to reverse) created, improvement and announcement. Also, I worked with the cross function team closely to ensure the operation be applied in the right way.

  1. Outsourcing warehouse management included RFQ, contract, performance monitor and QBR.
  2. Plan and monitor the regional repair material be used wisely.
  3. Create and improve the process of back-end supply chain operation deployed to the global service team and collect the feedback to develop the appropriateness.
  4. Report and analysis abnormal inventory regularly to avoid hazard.
  5. Coordinator between HQ and local service team to offer the solution and guidelines. Ensure the operations are alignment in the World Wide.

Achievements

  1. Set up AU outsourcing country HUB in Sydney on 2016. Spare parts transport TAT decreased from 5WD to 2WD and spare parts full fill rate increased from 80% to 90%.
  2. EMEA repair centre reverse logistics process improvement in order to speed up good/bad repair spare part turnover rate was decreased to 1.5 weeks from 5 weeks.
  3. Redefine EMEA bad/idle inventory management process meanwhile eliminate risky stock. As the result, the inventory accuracy was increased 20% to 95%.

Education

University of Kent

International Business •  2013 - 2014

National Kaohsiung First University of Science and Technology

Department of Logistics Management •  2008-2012