Jakarta, Indonesia
Experienced as an electrical engineer for more than 5 years in several multinational companies, experienced in handling projects local and overseas. Also experienced as quality control. Have good analytical skills and good presentation skills.
As a personal I Have high self-confidence and are quick to learn and adapt, has strong leadership , I'm diligent and likes new things, easy to get along with.
Contact Me:
Phone/WhatsApp: +62 822-9833-8104
Email: [email protected]
Handling customer claim for electrical equipment such as: ACB, VCB, MCCB and LV/MV Panel, analyze the cause of problem. Perform electrical testing, support customer for preventive maintenance of the equipment. Supporting sales team for product presentation.
Sept 2017 - Dec 2021
Handling customer claim for electrical LV/MV Panel, perform commissioning test at site (Local and Overseas), support customer for preventive maintenance of the equipment. Doing modification for LV / MV panel according to requirement .
Project reference:
1. Petronas Rapid project package, Malaysia
2. Maynilad Water Treatment Plant , Philippines
3. Tangguh expansion project, Papua - Indonesia
4. Apical KAO chemical project, Dumai - Indonesia
Dec 2015 - Sept 2017
Ensuring all products (LV panels) are in good condition functionally and visually before delivery. Arranging manhour to complete the project, visiting customers for commissioning and testing LV panels on site.
Project reference:
1. Moho Nord FPSO project, TOTAL E&P Congo , South Korea
2. Shell Seraya project , Singapore
3. Kaombo FPSO project, TOTAL E&P Angola, Singapore
4. Yadana project, TOTAL E&P, Myanmar
5. PDO gas development project, Oman
6. NPU Block Mahakam project, TOTAL E&P Indonesie, Kalimantan - Indonesia
7. Bualuang PDE BDN project, Ophir Energgy, Tailand
Nov 2011 - Jul 2014
Ensuring all products (LV panels) are in good condition functionally and visually before delivery. Perform testing of Switchgear function, protection relay, and metering. Make daily report after testing
Mar 2008 - Sept 2011
Checking all product (Washing machine and water pump) at line production, separate not good product and make daily report
Mar 2007- Jan 2008
Check the quantity of goods that coming from production line to warehouse, make sure to have space for the goods at the warehouse, collect the goods for delivery
Factory visit in Korea
Product seminar
Electrical testing
Sept 2011 - Mar 2015
Jun 2003 - Jun 2006
Jakarta, Indonesia
Experienced as an electrical engineer for more than 5 years in several multinational companies, experienced in handling projects local and overseas. Also experienced as quality control. Have good analytical skills and good presentation skills.
As a personal I Have high self-confidence and are quick to learn and adapt, has strong leadership , I'm diligent and likes new things, easy to get along with.
Contact Me:
Phone/WhatsApp: +62 822-9833-8104
Email: [email protected]
Handling customer claim for electrical equipment such as: ACB, VCB, MCCB and LV/MV Panel, analyze the cause of problem. Perform electrical testing, support customer for preventive maintenance of the equipment. Supporting sales team for product presentation.
Sept 2017 - Dec 2021
Handling customer claim for electrical LV/MV Panel, perform commissioning test at site (Local and Overseas), support customer for preventive maintenance of the equipment. Doing modification for LV / MV panel according to requirement .
Project reference:
1. Petronas Rapid project package, Malaysia
2. Maynilad Water Treatment Plant , Philippines
3. Tangguh expansion project, Papua - Indonesia
4. Apical KAO chemical project, Dumai - Indonesia
Dec 2015 - Sept 2017
Ensuring all products (LV panels) are in good condition functionally and visually before delivery. Arranging manhour to complete the project, visiting customers for commissioning and testing LV panels on site.
Project reference:
1. Moho Nord FPSO project, TOTAL E&P Congo , South Korea
2. Shell Seraya project , Singapore
3. Kaombo FPSO project, TOTAL E&P Angola, Singapore
4. Yadana project, TOTAL E&P, Myanmar
5. PDO gas development project, Oman
6. NPU Block Mahakam project, TOTAL E&P Indonesie, Kalimantan - Indonesia
7. Bualuang PDE BDN project, Ophir Energgy, Tailand
Nov 2011 - Jul 2014
Ensuring all products (LV panels) are in good condition functionally and visually before delivery. Perform testing of Switchgear function, protection relay, and metering. Make daily report after testing
Mar 2008 - Sept 2011
Checking all product (Washing machine and water pump) at line production, separate not good product and make daily report
Mar 2007- Jan 2008
Check the quantity of goods that coming from production line to warehouse, make sure to have space for the goods at the warehouse, collect the goods for delivery
Factory visit in Korea
Product seminar
Electrical testing
Sept 2011 - Mar 2015
Jun 2003 - Jun 2006