CakeResume Talent Search

Advanced filters
On
4-6 years
6-10 years
10-15 years
More than 15 years
Avatar of Deni Reza.
Avatar of Deni Reza.
Surveyor @PT. ALAM HIJAU LESTARI
2022 ~ Present
Surveyor
Within one year
geografis lainnya. Saya menggunakan total station, GPS, dan perangkat lunak pemetaan yang canggih untuk mengumpulkan data dengan akurasi yang tinggi Peta Topografi memvisualisasikan menjadi peta kontur Perhitungan volume cut & fill Serta mapping area elevasi rencana galian and timbunan Potongan profil longsection Serta keterangan elevasi existing, elevasi rencana, section elevasi galian and timbunan Work Experience Surveyor • PT. ALAM HIJAU LESTARI NovemberPresent Melakukan penggambaran desain rencana Cut & Fill menggunakan Autodesk Civil 3D Melakukan kegiatan pengukuran di lapangan Melakukan pengukuran progres mingguan untuk mengetahui berapa persen kenaikan progress mingguan Melakukan perhitungan dan penggambaran progress mingguan melakukan pengawasan t...
Word
Excel
AutoCAD
Employed
Full-time / Interested in working remotely
4-6 years
SMK Adi Sanggoro
smk
Avatar of the user.
Avatar of the user.
Past
Field Assistant (FFA - Wash) @Islamic Relief Yemen
2019 ~ 2021
PROJECT OFFICER
More than one year
Excel
PowerPoint
Photoshop
Unemployed
Full-time / Remote Only
4-6 years
Infrastructure University of Kuala Lumpur
Civil Engineering
Avatar of Sameh Saad Labib Botros Ishaq.
Avatar of Sameh Saad Labib Botros Ishaq.
Urban & Regional Planner @St - Jamea3a el Dewal El Arabiya El Dokki
2009 ~ 2009
Architect - Planning Engineer - Landscape Planner - 2D-3D Modeling
More than one year
St - Jamea3a el Dewal El Arabiya El Dokki, GIS Engineer., Jun 2019 ~ Jun 2019 Dates of employment or involvement : One year starting from 01/6/2018 until now. Job description : Working on GIS & Geomedia and Google Earth to Draw the Underground utilities using coordinates Working on Civil 3D to draw the isometric of the land using the x, y, z Coordinates St - Jamea3a el Dewal El Arabiya El Dokki, Urban & Regional Planner, Nov 2009 ~ Nov 2009 Companys name : The Executive Agency of the Industrial and Investment Zone. Companys Location : Giza Governorate, at K.M
Good Attendance
Hard Working
Cooperative
Employed
Full-time / Interested in working remotely
10-15 years
Cairo University
Urban & Regional Planning
Avatar of the user.
專案經理
Within one month
Word
Google Drive
Photoshop
Full-time / Interested in working remotely
6-10 years
國立中興大學
營建管理、工程規劃、室內設計
Avatar of Roby Syuhada.
Active
Avatar of Roby Syuhada.
Active
Mine Planning Engineer @PT. Sulawesi Cahaya Mineral
2018 ~ Present
Mining / Mine Plan Engineer
Within one month
with GARPulaubalang formation). Software & Device Mining Design (Vulcan 8, Surpac 6.4.1, Datamine Studio 3, Minex 6.3, Minescape 5.7) Mapping & Geotechnical (GPS, Surfer 13, Global Mapper, Slide, Rocfall) Data Analytics & Presentation (Excel Pivot + Visual Basic, PPT Thinkcell, Project Gantt Chart, Visio Flowchart) Drafting & Design (CAD Civil 3D, SketchUp) Video (AdPremiere + DJI Phantom 4) Marketing & Language Obtained off-takers agreement with coal trader/buyer (Glencore, Far East, Nobel, and HMS Bergbau Indonesia). Obtained a discounted fee sample analysis (10%) with Geoservices Lab. Obtained a discou...
Coal Mining
Nickel
Mine Planning
Full-time / Interested in working remotely
4-6 years
Institut Teknologi Bandung
Mining Engineering, Mine Environmental Management
Avatar of the user.
Avatar of the user.
Project Manager @Real Builders
2019 ~ 2021
Civil Project Manager
More than one year
Commercial Awareness
Collaboration
Supervision
Employed
Full-time / Interested in working remotely
10-15 years
KSR Polytechnic College
Diploma In Civil Engineering
Avatar of SHARAVAN KUMAR JAGIRI.
Avatar of SHARAVAN KUMAR JAGIRI.
Past
Site Engineer @Er.Kola Anna Reddy
2016 ~ 2021
Site Engineer
Within one year
to plan infrastructure and construction projects. Developed cost estimates for planned projects to aid in costing and budget planning efforts. Monitored team of 10 personnel during construction activities for compliance with health and safety requirements Education JuneMar-2000 Vivekananda vidyanikethan High school AprJan 2015 J.R.N Rajasthan vidyapeeth (Deeemed) university Diploma in civil Skills Auto-cad 3dsmax Revit architecture MS-word Languages Language — Telugu]} Language — English Language — Hindi SHARAVAN KUMAR JAGIRI SITE ENGINEER Karimnagar, Telangana, India Ingenious site engineer Successfully Monitor quality construction. Skilled at reading blue prints and communicating duties to workers.
Excel
AutoCad 2D
3dsmax vray
Unemployed
Full-time / Interested in working remotely
4-6 years
J.R.N Rajasthan vidyapeeth (Deemed ) university
Avatar of surya hendra.
Avatar of surya hendra.
Past
Site Enginner @PT. Orela Shipyard
2016 ~ 2016
GET/PROJECT MANAGEMENT/PRODUCTION ENGINEER/PRODUCTION SUPERVISOR/QUALITY ANALYST
Within two months
Kerja Field Project Control/ Supervisor Civil/HSE/QA/QC • PT Miranti Adhi Persada AgustusFebruari 2024 Project PT. CHEIL JEDANG INDONESIA - PASURUAN Sebagai Site Enginner, Supervisor Civil Qc Field Project Control & Supervisor Civil • PT. Mega Surya Eratama AgustusJuli 2022 sebagai Field Project Control / Supervisor Civil pembangunan industri Site Enginner, Supervisor Civil • Dinas Perumahan Rakyat dan Kawasan Permukiman, Cipta Karya dan Tata Ruang Kota Surabaya JanuariJuli 2021 sebagai Site Enginner, Supervisor Civil pemetaan Site Enginner • PT. Orela Shipyard JanuariDesember 2016 Site Enginner 3d modeling Pendidikan UNIVERSITAS BHAYANGKARA SURABAYA teknik sipilSkil Word Microsoft Office Excel
Word
Microsoft Office
Excel
Unemployed
Ready to interview
Full-time / Interested in working remotely
6-10 years
UNIVERSITAS BHAYANGKARA SURABAYA
teknik sipil
Avatar of 曾柏硯.
Avatar of 曾柏硯.
AI Technical Lead @WeBIM Services
2024 ~ Present
前端工程師、後端工程師、全端工程師
Within one month
SyncoBox Automation to automate 100% of the inspection process of BIM models. Developed and maintained shared packages, permission logic, and microservice communication interfaces for the backend team to improve maintainability and reduce collaboration costs. Researched and utilized Nvidia Omniverse to develop high-quality rendering services. Developed the 3D model management module for SyncoBox digital design automation service. Designed and utilized Autodesk Platform Service Viewer to develop 3D model rendering components. Designed and developed SyncoBox Panorama to provide online panoramic services with offline access support. Refactored WeBIMSync with web technologies and integrated it into SyncoBox
HTML/CSS
JavaScript
Node.js
Employed
Open to opportunities
Full-time / Interested in working remotely
4-6 years
National Taiwan University
Civil Engineering (Division of Transportation Engineering)
Avatar of 陳惠龍.
Avatar of 陳惠龍.
Data science lecturer @Ittraining
2020 ~ Present
Data Scientist 資料科學家_數據分析師
Within one month
工程): - Silver medal (solo): (Kaggle) 1st and Future - Player Contact Detection: Detect Player Contacts from Sensor and Video Data, 2023/03/03 AIGC (生成式AI): - Bronze medal (solo): (Kaggle) Stable Diffusion - Image to Prompts: Deduce the prompts that generated our "highly detailed, sharp focus, illustration, 3d renders of majestic, epic" images, 2023/05/16 Object detection (目標檢測): - 4th place (solo): (Aidea AI CUP) 肺腺癌病理切片影像之腫瘤氣道擴散偵測競賽 I:運用物體偵測
nlp-rasa
recommender system
pytorch tensorflow
Employed
Open to opportunities
Part-time / Interested in working remotely
More than 15 years
Purdue University
School of civil engineering (Stochastic & statistical hydrology)

The Most Lightweight and Effective Recruiting Plan

Search resumes and take the initiative to contact job applicants for higher recruiting efficiency. The Choice of Hundreds of Companies.

  • Browse all search results
  • Unlimited access to start new conversations
  • Resumes accessible for only paid companies
  • View users’ email address & phone numbers
Search Tips
1
Search a precise keyword combination
senior backend php
If the number of the search result is not enough, you can remove the less important keywords
2
Use quotes to search for an exact phrase
"business development"
3
Use the minus sign to eliminate results containing certain words
UI designer -UX
Only public resumes are available with the free plan.
Upgrade to an advanced plan to view all search results including tens of thousands of resumes exclusive on CakeResume.

Definition of Reputation Credits

Technical Skills
Specialized knowledge and expertise within the profession (e.g. familiar with SEO and use of related tools).
Problem-Solving
Ability to identify, analyze, and prepare solutions to problems.
Adaptability
Ability to navigate unexpected situations; and keep up with shifting priorities, projects, clients, and technology.
Communication
Ability to convey information effectively and is willing to give and receive feedback.
Time Management
Ability to prioritize tasks based on importance; and have them completed within the assigned timeline.
Teamwork
Ability to work cooperatively, communicate effectively, and anticipate each other's demands, resulting in coordinated collective action.
Leadership
Ability to coach, guide, and inspire a team to achieve a shared goal or outcome effectively.
Within one month
Mine Planning Engineer
Logo of PT. Sulawesi Cahaya Mineral.
PT. Sulawesi Cahaya Mineral
2018 ~ Present
West Java, Indonesia
Professional Background
Current status
Job Search Progress
Professions
Other
Fields of Employment
Mining Metals
Work experience
4-6 years
Management
Skills
Coal Mining
Nickel
Mine Planning
General Management
Presentation Skills
Vulcan
Surpac
data analysis and dashboarding
Supply Chain Management
Drone Piloting
Project Management Skills
Languages
Job search preferences
Positions
Mining / Mine Plan Engineer
Job types
Full-time
Locations
Remote
Interested in working remotely
Freelance
Educations
School
Institut Teknologi Bandung
Major
Mining Engineering, Mine Environmental Management
Print
Iypr3kseyjjcmp3ifm4h

Roby Syuhada

Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis.
Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result.
Proven record as mining project manager for project accomplishments and presenting to BoD & Stakeholder.

Mining / Mine Plan Engineer

(+62)81222829625

Biola No. 8 Bandung, Jawa Barat, ID
[email protected]

Skill & Achievement


Mining

  1. Supervised 900k tpm delivery and coal quality assessed front to barge.
  2. Managed fleet match 25-PC2000 & 3-EX3500 with 140-HD785.
  3. Improved Pit-CPP haul cap. (22k to 25k tpd) with 6-Double Trailer Trial.
  4. Reduced 48-HD785+HD777 FBR (save 7% fuel) by ECO-Mode optimization.

Mine Plan

  1. Orchestrated nickel wet ore blending prod. (RKEF, Heap Leach, and HPAL) to optimize additional 2 million reserve.
  2. Implemented:
  • Open pit coal avg. SR 5:1 within 14Ha with crest-toe level 45m (LOM 4yr)
  • Open-cast nickel avg. SR 1.64:1 and COG Ni 1.6% within 1.24k Ha with crest- toe level 85m (LOM 12yr)

General Mgt. Ops.

  1. Reduced 2018 Q1-Q2 Incident Rate 11% by implementing Safety Accountability Program (SAP)
  2. Facilitated EHS Automation System Upgrade (RFID) with Auto Tracking + Clustering Data
  3. Implemented Radial Crusher Design Construction (CR-12) for coal blending variance (5-6 types) 
  4. Reduced 3s of barge mooring time by implementing dredge operation.

Exploration

  1. Led 1 unit Jackro 175 drilling ops. in 2 months resulting 800k ton coal resources with GAR 3300-3500 (Balikpapan formation).
  2. Led 2 unit Jackro 175 drilling ops. in 3 weeks resulting 150k ton coal resources with GAR 4400-4900 (Pulaubalang formation).

Software & Device

  1. Mining Design (Vulcan 8, Surpac 6.4.1, Datamine Studio 3, Minex 6.3, Minescape 5.7)
  2. Mapping & Geotechnical (GPS, Surfer 13, Global Mapper, Slide, Rocfall)
  3. Data Analytics & Presentation (Excel Pivot + Visual Basic, PPT Thinkcell, Project Gantt Chart, Visio Flowchart)
  4. Drafting & Design (CAD Civil 3D, SketchUp)
  5. Video (AdPremiere + DJI Phantom 4)

Marketing & Language

  1. Obtained off-takers agreement with coal trader/buyer (Glencore, Far East, Nobel, and HMS Bergbau Indonesia).
  2. Obtained a discounted fee sample analysis (10%) with Geoservices Lab.
  3. Obtained a discounted price (10%) and 2-stage term of payment instead of full payment in advance with Coates Service & Valfrol Dewatering.
  4. Advanced proficient in English Business Conversation (iBT 87), native in Bahasa

Projects

Projects 01 00@2x

Spearheaded ECO Mode research by experiencing it directly on operator cabin (HD785 / CAT 777) by:

1. Utilize ECO Mode, evaluate Modular data bank, and optimize ECO Mode (Komatsu/CAT)

2. Fuel Efficiency results: 7-11% lesser FBR (lt/hr) with minimum usage 60% ECO Mode.

Projects 01 01@2x

Facilitated EHS and Compliance System Upgrade by:

1. Integrating technology RFID, cloud database, and on-site personnel activity (inspection-investigation etc.)

2. EHS Automation results: Comprehensive Site-to-HQ Live EHS Data for deep analytical of preventive incident presented with interactive (custom design).

Projects 01 02@2x

Generated opportunity of new marketing products with:

1. Implementing Radial Stacker Crusher Design (CR-12) to prepare 5-6 coal qualities blending

2. Total project value approx. $3million.

Work Experience

PT. Sulawesi Cahaya Mineral, Mine Planning Engineer
Dec 2018 ~ Present

Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator

• Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown.
• Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration.
• Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Syjloebslimusj5clrpp

PT Indo Mining Services, Mining Project Manager
Jun 2018 ~ Dec 2018

Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Verbal and Written Communication Skills

• Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation).
• Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review.
• Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner).
• Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Cryrmebhq2xfijyvpnba

PT Berau Coal, Mining Engineering and General Management Operation Jul 2016 ~ Jun 2018

Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator

• Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director.
• Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge.
• Managing lead 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785.
• Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied.
• Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Hwj3d7qvcg5bxg7jgdev

PT Rokatera Prima Minera, Mining Geology and Planning Engineer

Oct 2014 ~ Jul 2016

Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience

• Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown.
• Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources.
• Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Dalgadzlkerbgilyau1g

PT LAPI ITB, Mining Environment Researcher
Oct 2013 ~ Oct 2014

Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by:

• Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis.
• Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.
Peydqgvkusldmnezdkt2

Education

Institut Teknologi Bandung, Master of Science (MS), Mining Engineering & Mine Environmental Management, 2013 ~ 2014

• 1 year fast track graduate program with full ITB Dean Scholarship focusing on Mine Environmental Mgt. Engineering (Geochemist & Mine Reclamation).
• Thesis project in open pit coal PT Bukit Asam to predict ARD/AMD potential by characterizing Cubical-Framboidal Pyrite in order.
• AJ-BCEP Student Exchange with a participant from ASEAN and Japan University Student with 3 campuses visited:
a. Institut Teknologi Bandung, Laboratorium visit, and Pongkor Underground Gold Mine, Bogor-Indonesia
b. Chulalongkorn University and Gypsum Open Pit Mine, Thailand
c. Kyushu University, laboratorium visit, and CINEST Resources Symposium Speaker in Kyushu-Japan
• 2013 CINEST Earth Resources Symposium Speaker in Kyushu-Japan, about Vein Deposit Gold Exploration report.
Jkere2ucmqecoztkpb8y

Institut Teknologi Bandung, Bachelor of Science (BS), Mining Engineering & Mining & Oil Exploration, 2009 ~ 2013

• 4 year undergraduate program with 2 years ITB Dean Scholarship focusing on Mining Engineering (Coal and Mineral Exploration, Planning, and Operation).
• Thesis project in creating a quantitative table of Resource-Reserve Conservation Evaluation by: a. Converting Indonesia Mineral and Energy Ministry Regulation into a quantitative table. b. Assessing exploratory documents and annual production - financial reports from 4 major mining corporate (Newmont Copper & Gold, KBK Gold, NHM Copper & Iron Ore) as a subject to evaluate.


• Field Leader of ITB Mining Student Orientation.
• Head of Logistics and Documentation Division of ITB President Election.
• Facilitator of ITB Oil-Gas-Mining Professional Discussion.
Bx1qzb8ghug2zifldddf
Resume
Profile
Iypr3kseyjjcmp3ifm4h

Roby Syuhada

Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis.
Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result.
Proven record as mining project manager for project accomplishments and presenting to BoD & Stakeholder.

Mining / Mine Plan Engineer

(+62)81222829625

Biola No. 8 Bandung, Jawa Barat, ID
[email protected]

Skill & Achievement


Mining

  1. Supervised 900k tpm delivery and coal quality assessed front to barge.
  2. Managed fleet match 25-PC2000 & 3-EX3500 with 140-HD785.
  3. Improved Pit-CPP haul cap. (22k to 25k tpd) with 6-Double Trailer Trial.
  4. Reduced 48-HD785+HD777 FBR (save 7% fuel) by ECO-Mode optimization.

Mine Plan

  1. Orchestrated nickel wet ore blending prod. (RKEF, Heap Leach, and HPAL) to optimize additional 2 million reserve.
  2. Implemented:
  • Open pit coal avg. SR 5:1 within 14Ha with crest-toe level 45m (LOM 4yr)
  • Open-cast nickel avg. SR 1.64:1 and COG Ni 1.6% within 1.24k Ha with crest- toe level 85m (LOM 12yr)

General Mgt. Ops.

  1. Reduced 2018 Q1-Q2 Incident Rate 11% by implementing Safety Accountability Program (SAP)
  2. Facilitated EHS Automation System Upgrade (RFID) with Auto Tracking + Clustering Data
  3. Implemented Radial Crusher Design Construction (CR-12) for coal blending variance (5-6 types) 
  4. Reduced 3s of barge mooring time by implementing dredge operation.

Exploration

  1. Led 1 unit Jackro 175 drilling ops. in 2 months resulting 800k ton coal resources with GAR 3300-3500 (Balikpapan formation).
  2. Led 2 unit Jackro 175 drilling ops. in 3 weeks resulting 150k ton coal resources with GAR 4400-4900 (Pulaubalang formation).

Software & Device

  1. Mining Design (Vulcan 8, Surpac 6.4.1, Datamine Studio 3, Minex 6.3, Minescape 5.7)
  2. Mapping & Geotechnical (GPS, Surfer 13, Global Mapper, Slide, Rocfall)
  3. Data Analytics & Presentation (Excel Pivot + Visual Basic, PPT Thinkcell, Project Gantt Chart, Visio Flowchart)
  4. Drafting & Design (CAD Civil 3D, SketchUp)
  5. Video (AdPremiere + DJI Phantom 4)

Marketing & Language

  1. Obtained off-takers agreement with coal trader/buyer (Glencore, Far East, Nobel, and HMS Bergbau Indonesia).
  2. Obtained a discounted fee sample analysis (10%) with Geoservices Lab.
  3. Obtained a discounted price (10%) and 2-stage term of payment instead of full payment in advance with Coates Service & Valfrol Dewatering.
  4. Advanced proficient in English Business Conversation (iBT 87), native in Bahasa

Projects

Projects 01 00@2x

Spearheaded ECO Mode research by experiencing it directly on operator cabin (HD785 / CAT 777) by:

1. Utilize ECO Mode, evaluate Modular data bank, and optimize ECO Mode (Komatsu/CAT)

2. Fuel Efficiency results: 7-11% lesser FBR (lt/hr) with minimum usage 60% ECO Mode.

Projects 01 01@2x

Facilitated EHS and Compliance System Upgrade by:

1. Integrating technology RFID, cloud database, and on-site personnel activity (inspection-investigation etc.)

2. EHS Automation results: Comprehensive Site-to-HQ Live EHS Data for deep analytical of preventive incident presented with interactive (custom design).

Projects 01 02@2x

Generated opportunity of new marketing products with:

1. Implementing Radial Stacker Crusher Design (CR-12) to prepare 5-6 coal qualities blending

2. Total project value approx. $3million.

Work Experience

PT. Sulawesi Cahaya Mineral, Mine Planning Engineer
Dec 2018 ~ Present

Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator

• Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown.
• Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration.
• Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Syjloebslimusj5clrpp

PT Indo Mining Services, Mining Project Manager
Jun 2018 ~ Dec 2018

Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Verbal and Written Communication Skills

• Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation).
• Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review.
• Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner).
• Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Cryrmebhq2xfijyvpnba

PT Berau Coal, Mining Engineering and General Management Operation Jul 2016 ~ Jun 2018

Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator

• Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director.
• Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge.
• Managing lead 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785.
• Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied.
• Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Hwj3d7qvcg5bxg7jgdev

PT Rokatera Prima Minera, Mining Geology and Planning Engineer

Oct 2014 ~ Jul 2016

Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience

• Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown.
• Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources.
• Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Dalgadzlkerbgilyau1g

PT LAPI ITB, Mining Environment Researcher
Oct 2013 ~ Oct 2014

Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by:

• Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis.
• Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.
Peydqgvkusldmnezdkt2

Education

Institut Teknologi Bandung, Master of Science (MS), Mining Engineering & Mine Environmental Management, 2013 ~ 2014

• 1 year fast track graduate program with full ITB Dean Scholarship focusing on Mine Environmental Mgt. Engineering (Geochemist & Mine Reclamation).
• Thesis project in open pit coal PT Bukit Asam to predict ARD/AMD potential by characterizing Cubical-Framboidal Pyrite in order.
• AJ-BCEP Student Exchange with a participant from ASEAN and Japan University Student with 3 campuses visited:
a. Institut Teknologi Bandung, Laboratorium visit, and Pongkor Underground Gold Mine, Bogor-Indonesia
b. Chulalongkorn University and Gypsum Open Pit Mine, Thailand
c. Kyushu University, laboratorium visit, and CINEST Resources Symposium Speaker in Kyushu-Japan
• 2013 CINEST Earth Resources Symposium Speaker in Kyushu-Japan, about Vein Deposit Gold Exploration report.
Jkere2ucmqecoztkpb8y

Institut Teknologi Bandung, Bachelor of Science (BS), Mining Engineering & Mining & Oil Exploration, 2009 ~ 2013

• 4 year undergraduate program with 2 years ITB Dean Scholarship focusing on Mining Engineering (Coal and Mineral Exploration, Planning, and Operation).
• Thesis project in creating a quantitative table of Resource-Reserve Conservation Evaluation by: a. Converting Indonesia Mineral and Energy Ministry Regulation into a quantitative table. b. Assessing exploratory documents and annual production - financial reports from 4 major mining corporate (Newmont Copper & Gold, KBK Gold, NHM Copper & Iron Ore) as a subject to evaluate.


• Field Leader of ITB Mining Student Orientation.
• Head of Logistics and Documentation Division of ITB President Election.
• Facilitator of ITB Oil-Gas-Mining Professional Discussion.
Bx1qzb8ghug2zifldddf