CakeResume Talent Search

Advanced filters
On
4-6 years
6-10 years
10-15 years
More than 15 years
Avatar of Teuku Muhammad Mifdhal Ridho.
Avatar of Teuku Muhammad Mifdhal Ridho.
Geographic Information System Specialist @Thiess
2023 ~ Present
GIS Specialist
Within two months
Teuku Muhammad Mifdhal Ridho South Tangerang, South Tangerang City, Banten, [email protected] https://www.linkedin.com/in/teuku-muhammad-mifdhal-ridho/ I have less than a year of experiences in the area of Project Planning and Inventory Control, 3 years in Geotechnical Engineering, 4 years in Geographic Information System as GIS Specialist as last position in Esri Indonesia and a year as GIS Specialist at Thiess. I have many experiences in developing geospatial solution using ESRI Platform based on customer’s needs and also developing GIS tools
GIS Software
Python Programming
SQL Database
Employed
Open to opportunities
Full-time / Interested in working remotely
4-6 years
Diponegoro University
Geological/Geophysical Engineering
Avatar of the user.
Avatar of the user.
R&D Section Lead @興創知能股份有限公司(ThinkTron Ltd.)
2018 ~ Present
Within one month
Docker
Docker Swarm
AWS Lambda
Full-time / Interested in working remotely
4-6 years
National Taiwan University
GeoTechnical Engineering
Avatar of the user.
Avatar of the user.
事業二部一課課長 @興創知能股份有限公司
2018 ~ Present
Within one year
GIS
GIS analysis
Docker
Full-time / Interested in working remotely
4-6 years
國立台灣大學土木工程學系 Dept. of Civil Engineering, National Taiwan University
GeoTechnical Engineering
Avatar of Harold “Brent” Franks.
Avatar of Harold “Brent” Franks.
Construction Engineering Inspector @Bunnell Lammons Engineering
2016 ~ Present
Senior Engineering Inspector
More than one year
dependable. I have an outgoing personality and do well in a team based environment, work well with others and maintain a positive attitude throughout the work day. I believe strongly in my convictions and always put my best foot forward. Cullowhee, NC, USA Work Experience MayPresent Construction Engineering Inspector Bunnell Lammons Engineering Structural and Geotechnical inspections. Concrete testing, reinforcing steel inspection. Post tension cable placement and stressing. In situ testing of soils for density and bearing. Assist in the laboratory conducting concrete strength testing and Geotechnical soils testing. JanuaryPresent Mail Carrier USPS
Concrete Testing
Geotechnical Engineering
Construction Engineering
Employed
Full-time / Not interested in working remotely
More than 15 years
Cullowhee High School
General Education
Avatar of fikriy alawiy.
Avatar of fikriy alawiy.
Geotechnical Engineer @PT. Mettana Engineering Consultant
2015 ~ Present
Civil Engineer
Within one month
Muhammad Fikriy Alawiy Geotechnical engineer who has about 5 years experience (sincein soil investigation, soil laboratory, and geotechnical design I am someone who is eager to continue learning, aiming to effectively solve geotechnical problems, including the utilization of various geotechnical software such as PLAXIS, Slide, Settle 3D, LPile, and others Personal Information : My current age is 35 years old Married I live in the city of Bandung Experiences : Geotechnical Engineer • PT. Nur Straits EngineeringJob Desk; Managing Soil Investigation Projects Supervising Soil Laboratory Tests Preparing Reports on Soil Investigation & Geotechnical Design No Project Client Job 1 DED Retaining Wall Sisi
Employed
Open to opportunities
Full-time / Interested in working remotely
4-6 years
Politeknik Negeri Bandung
Civil Engineering
Avatar of the user.
Avatar of the user.
Past
產品經理 @SGS台灣檢驗科技股份有限公司
2022 ~ 2023
建築資訊塑模(BIM)研發專案管理、虛擬技術相關專案管理、營建新創相關專案管理、流程制度設計相關
Within one month
BIM理論與實務
BIM導入與應用
Revit
Unemployed
Open to opportunities
Full-time / Interested in working remotely
6-10 years
國立交通大學
土木工程大地組
Avatar of Andika Hafid.
Avatar of Andika Hafid.
Hauling Supervisor @PT Gunung Bara Utama
2021 ~ Present
Within six months
ANDIKA Mining Engineer Saya memiliki pengalaman bekerja di perusahaan pertambangan batubara selama kurang lebih 5 tahun 10 bulan. Saya pernah bekerja di PT. Bayan Resources Tbk dengan posisi group leader Production Coal Hauling and Processing (3 tahun) dan Mining Geotech Enggineering (8 bulan), PT. Gunung Bara Utama dengan posisi Supervisor Coal Hauling and Road Maintenance (1 tahun).dan saat ini saya bekerja di Paramresources & SinarMas Group PT Indo Bara Pratama posisi Mining Operation Supervisor. Dengan bekal pengalaman ini saya yakin mampu bekerja dibagian Mining Operation, Coal Hauling dan Mining Engineering yang juga didukung dengan skill
Microsoft Excel
Microsoft Word
Microsoft PowerPoint
Employed
Full-time / Interested in working remotely
4-6 years
Universitas Hasanuddin
Mining Engineering
Avatar of 葉佳鴻.
Avatar of 葉佳鴻.
工程師 @CECI Engineering Consultants, Inc. Taiwan (台灣世曦工程顧問股份有限公司)
2020 ~ Present
Geologist
More than one year
Yeh, Chia-Hung (葉佳鴻) A result oriented engineer with 5+ years of experience, Possess time management and strategic thinking in addition to strong cross-culture communication, data analytical skills. Keeping focus on slope disasters, geotechnical field and data visualization now. Taipei, Taiwan WORK EXPERIENCE Geological Engineer •CECI Engineering Consultants, Inc., Taiwan JunPresent Developed a geologic-drilling query database by Python to simply predict the market conditions and potential price of current contracting cases, reduced contractor expenses by 10% per year. Collaborated with 10+ members to execute the project about soil liquefaction analysis
Word
Excel
PowerPoint
Employed
Full-time / Interested in working remotely
4-6 years
國立臺灣大學
Geoscience
Avatar of Kevin Deng.
Avatar of Kevin Deng.
Data Engineer - Marketing Data Science @Grubhub - Just Eat Takeaway
2021 ~ Present
Data Analytics Lead
More than one year
Kevin Deng Data Analytics Lead 4+ years Data Science in Analytics, ML Engineering roles in E-commerce and Ads in U.S. with a Master degree in Engineering Taipei City, Taiwan Work Experience Data Analytics Lead • Groupon . Lead analytics team to build up ETL pipelines, API-Dashboard, and Machine Learning fraud prevention model for achieving Groupon global engineering operation and financial operation KPI. NovemberPresent Data Analyst III • Groupon . Increase 5% payment authorizing rate by redesigning recurring payment for Groupon Select Loyalty Program . Formulate databases, tables, catalog, metadata for all fraud services with GDPR
Python
sql
Snowflake
Full-time / Interested in working remotely
4-6 years
Northwestern University
Project Management
Avatar of Roby Syuhada.
Offline
Avatar of Roby Syuhada.
Offline
Mine Planning Engineer @PT. Sulawesi Cahaya Mineral
2018 ~ Present
Mining / Mine Plan Engineer
Within one month
Roby Syuhada Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis. Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result. Proven record as mining project manager for project accomplishments and presenting to
Coal Mining
Nickel
Mine Planning
Full-time / Interested in working remotely
4-6 years
Institut Teknologi Bandung
Mining Engineering, Mine Environmental Management

The Most Lightweight and Effective Recruiting Plan

Search resumes and take the initiative to contact job applicants for higher recruiting efficiency. The Choice of Hundreds of Companies.

  • Browse all search results
  • Unlimited access to start new conversations
  • Resumes accessible for only paid companies
  • View users’ email address & phone numbers
Search Tips
1
Search a precise keyword combination
senior backend php
If the number of the search result is not enough, you can remove the less important keywords
2
Use quotes to search for an exact phrase
"business development"
3
Use the minus sign to eliminate results containing certain words
UI designer -UX
Only public resumes are available with the free plan.
Upgrade to an advanced plan to view all search results including tens of thousands of resumes exclusive on CakeResume.

Definition of Reputation Credits

Technical Skills
Specialized knowledge and expertise within the profession (e.g. familiar with SEO and use of related tools).
Problem-Solving
Ability to identify, analyze, and prepare solutions to problems.
Adaptability
Ability to navigate unexpected situations; and keep up with shifting priorities, projects, clients, and technology.
Communication
Ability to convey information effectively and is willing to give and receive feedback.
Time Management
Ability to prioritize tasks based on importance; and have them completed within the assigned timeline.
Teamwork
Ability to work cooperatively, communicate effectively, and anticipate each other's demands, resulting in coordinated collective action.
Leadership
Ability to coach, guide, and inspire a team to achieve a shared goal or outcome effectively.
Within one month
Mine Planning Engineer
Logo of PT. Sulawesi Cahaya Mineral.
PT. Sulawesi Cahaya Mineral
2018 ~ Present
West Java, Indonesia
Professional Background
Current status
Job Search Progress
Professions
Other
Fields of Employment
Mining Metals
Work experience
4-6 years
Management
Skills
Coal Mining
Nickel
Mine Planning
General Management
Presentation Skills
Vulcan
Surpac
data analysis and dashboarding
Supply Chain Management
Drone Piloting
Project Management Skills
Languages
Job search preferences
Positions
Mining / Mine Plan Engineer
Job types
Full-time
Locations
Remote
Interested in working remotely
Freelance
Educations
School
Institut Teknologi Bandung
Major
Mining Engineering, Mine Environmental Management
Print
Iypr3kseyjjcmp3ifm4h

Roby Syuhada

Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis.
Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result.
Proven record as mining project manager for project accomplishments and presenting to BoD & Stakeholder.

Mining / Mine Plan Engineer

(+62)81222829625

Biola No. 8 Bandung, Jawa Barat, ID
[email protected]

Skill & Achievement


Mining

  1. Supervised 900k tpm delivery and coal quality assessed front to barge.
  2. Managed fleet match 25-PC2000 & 3-EX3500 with 140-HD785.
  3. Improved Pit-CPP haul cap. (22k to 25k tpd) with 6-Double Trailer Trial.
  4. Reduced 48-HD785+HD777 FBR (save 7% fuel) by ECO-Mode optimization.

Mine Plan

  1. Orchestrated nickel wet ore blending prod. (RKEF, Heap Leach, and HPAL) to optimize additional 2 million reserve.
  2. Implemented:
  • Open pit coal avg. SR 5:1 within 14Ha with crest-toe level 45m (LOM 4yr)
  • Open-cast nickel avg. SR 1.64:1 and COG Ni 1.6% within 1.24k Ha with crest- toe level 85m (LOM 12yr)

General Mgt. Ops.

  1. Reduced 2018 Q1-Q2 Incident Rate 11% by implementing Safety Accountability Program (SAP)
  2. Facilitated EHS Automation System Upgrade (RFID) with Auto Tracking + Clustering Data
  3. Implemented Radial Crusher Design Construction (CR-12) for coal blending variance (5-6 types) 
  4. Reduced 3s of barge mooring time by implementing dredge operation.

Exploration

  1. Led 1 unit Jackro 175 drilling ops. in 2 months resulting 800k ton coal resources with GAR 3300-3500 (Balikpapan formation).
  2. Led 2 unit Jackro 175 drilling ops. in 3 weeks resulting 150k ton coal resources with GAR 4400-4900 (Pulaubalang formation).

Software & Device

  1. Mining Design (Vulcan 8, Surpac 6.4.1, Datamine Studio 3, Minex 6.3, Minescape 5.7)
  2. Mapping & Geotechnical (GPS, Surfer 13, Global Mapper, Slide, Rocfall)
  3. Data Analytics & Presentation (Excel Pivot + Visual Basic, PPT Thinkcell, Project Gantt Chart, Visio Flowchart)
  4. Drafting & Design (CAD Civil 3D, SketchUp)
  5. Video (AdPremiere + DJI Phantom 4)

Marketing & Language

  1. Obtained off-takers agreement with coal trader/buyer (Glencore, Far East, Nobel, and HMS Bergbau Indonesia).
  2. Obtained a discounted fee sample analysis (10%) with Geoservices Lab.
  3. Obtained a discounted price (10%) and 2-stage term of payment instead of full payment in advance with Coates Service & Valfrol Dewatering.
  4. Advanced proficient in English Business Conversation (iBT 87), native in Bahasa

Projects

Projects 01 00@2x

Spearheaded ECO Mode research by experiencing it directly on operator cabin (HD785 / CAT 777) by:

1. Utilize ECO Mode, evaluate Modular data bank, and optimize ECO Mode (Komatsu/CAT)

2. Fuel Efficiency results: 7-11% lesser FBR (lt/hr) with minimum usage 60% ECO Mode.

Projects 01 01@2x

Facilitated EHS and Compliance System Upgrade by:

1. Integrating technology RFID, cloud database, and on-site personnel activity (inspection-investigation etc.)

2. EHS Automation results: Comprehensive Site-to-HQ Live EHS Data for deep analytical of preventive incident presented with interactive (custom design).

Projects 01 02@2x

Generated opportunity of new marketing products with:

1. Implementing Radial Stacker Crusher Design (CR-12) to prepare 5-6 coal qualities blending

2. Total project value approx. $3million.

Work Experience

PT. Sulawesi Cahaya Mineral, Mine Planning Engineer
Dec 2018 ~ Present

Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator

• Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown.
• Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration.
• Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Syjloebslimusj5clrpp

PT Indo Mining Services, Mining Project Manager
Jun 2018 ~ Dec 2018

Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Verbal and Written Communication Skills

• Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation).
• Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review.
• Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner).
• Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Cryrmebhq2xfijyvpnba

PT Berau Coal, Mining Engineering and General Management Operation Jul 2016 ~ Jun 2018

Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator

• Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director.
• Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge.
• Managing lead 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785.
• Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied.
• Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Hwj3d7qvcg5bxg7jgdev

PT Rokatera Prima Minera, Mining Geology and Planning Engineer

Oct 2014 ~ Jul 2016

Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience

• Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown.
• Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources.
• Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Dalgadzlkerbgilyau1g

PT LAPI ITB, Mining Environment Researcher
Oct 2013 ~ Oct 2014

Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by:

• Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis.
• Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.
Peydqgvkusldmnezdkt2

Education

Institut Teknologi Bandung, Master of Science (MS), Mining Engineering & Mine Environmental Management, 2013 ~ 2014

• 1 year fast track graduate program with full ITB Dean Scholarship focusing on Mine Environmental Mgt. Engineering (Geochemist & Mine Reclamation).
• Thesis project in open pit coal PT Bukit Asam to predict ARD/AMD potential by characterizing Cubical-Framboidal Pyrite in order.
• AJ-BCEP Student Exchange with a participant from ASEAN and Japan University Student with 3 campuses visited:
a. Institut Teknologi Bandung, Laboratorium visit, and Pongkor Underground Gold Mine, Bogor-Indonesia
b. Chulalongkorn University and Gypsum Open Pit Mine, Thailand
c. Kyushu University, laboratorium visit, and CINEST Resources Symposium Speaker in Kyushu-Japan
• 2013 CINEST Earth Resources Symposium Speaker in Kyushu-Japan, about Vein Deposit Gold Exploration report.
Jkere2ucmqecoztkpb8y

Institut Teknologi Bandung, Bachelor of Science (BS), Mining Engineering & Mining & Oil Exploration, 2009 ~ 2013

• 4 year undergraduate program with 2 years ITB Dean Scholarship focusing on Mining Engineering (Coal and Mineral Exploration, Planning, and Operation).
• Thesis project in creating a quantitative table of Resource-Reserve Conservation Evaluation by: a. Converting Indonesia Mineral and Energy Ministry Regulation into a quantitative table. b. Assessing exploratory documents and annual production - financial reports from 4 major mining corporate (Newmont Copper & Gold, KBK Gold, NHM Copper & Iron Ore) as a subject to evaluate.


• Field Leader of ITB Mining Student Orientation.
• Head of Logistics and Documentation Division of ITB President Election.
• Facilitator of ITB Oil-Gas-Mining Professional Discussion.
Bx1qzb8ghug2zifldddf
Resume
Profile
Iypr3kseyjjcmp3ifm4h

Roby Syuhada

Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis.
Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result.
Proven record as mining project manager for project accomplishments and presenting to BoD & Stakeholder.

Mining / Mine Plan Engineer

(+62)81222829625

Biola No. 8 Bandung, Jawa Barat, ID
[email protected]

Skill & Achievement


Mining

  1. Supervised 900k tpm delivery and coal quality assessed front to barge.
  2. Managed fleet match 25-PC2000 & 3-EX3500 with 140-HD785.
  3. Improved Pit-CPP haul cap. (22k to 25k tpd) with 6-Double Trailer Trial.
  4. Reduced 48-HD785+HD777 FBR (save 7% fuel) by ECO-Mode optimization.

Mine Plan

  1. Orchestrated nickel wet ore blending prod. (RKEF, Heap Leach, and HPAL) to optimize additional 2 million reserve.
  2. Implemented:
  • Open pit coal avg. SR 5:1 within 14Ha with crest-toe level 45m (LOM 4yr)
  • Open-cast nickel avg. SR 1.64:1 and COG Ni 1.6% within 1.24k Ha with crest- toe level 85m (LOM 12yr)

General Mgt. Ops.

  1. Reduced 2018 Q1-Q2 Incident Rate 11% by implementing Safety Accountability Program (SAP)
  2. Facilitated EHS Automation System Upgrade (RFID) with Auto Tracking + Clustering Data
  3. Implemented Radial Crusher Design Construction (CR-12) for coal blending variance (5-6 types) 
  4. Reduced 3s of barge mooring time by implementing dredge operation.

Exploration

  1. Led 1 unit Jackro 175 drilling ops. in 2 months resulting 800k ton coal resources with GAR 3300-3500 (Balikpapan formation).
  2. Led 2 unit Jackro 175 drilling ops. in 3 weeks resulting 150k ton coal resources with GAR 4400-4900 (Pulaubalang formation).

Software & Device

  1. Mining Design (Vulcan 8, Surpac 6.4.1, Datamine Studio 3, Minex 6.3, Minescape 5.7)
  2. Mapping & Geotechnical (GPS, Surfer 13, Global Mapper, Slide, Rocfall)
  3. Data Analytics & Presentation (Excel Pivot + Visual Basic, PPT Thinkcell, Project Gantt Chart, Visio Flowchart)
  4. Drafting & Design (CAD Civil 3D, SketchUp)
  5. Video (AdPremiere + DJI Phantom 4)

Marketing & Language

  1. Obtained off-takers agreement with coal trader/buyer (Glencore, Far East, Nobel, and HMS Bergbau Indonesia).
  2. Obtained a discounted fee sample analysis (10%) with Geoservices Lab.
  3. Obtained a discounted price (10%) and 2-stage term of payment instead of full payment in advance with Coates Service & Valfrol Dewatering.
  4. Advanced proficient in English Business Conversation (iBT 87), native in Bahasa

Projects

Projects 01 00@2x

Spearheaded ECO Mode research by experiencing it directly on operator cabin (HD785 / CAT 777) by:

1. Utilize ECO Mode, evaluate Modular data bank, and optimize ECO Mode (Komatsu/CAT)

2. Fuel Efficiency results: 7-11% lesser FBR (lt/hr) with minimum usage 60% ECO Mode.

Projects 01 01@2x

Facilitated EHS and Compliance System Upgrade by:

1. Integrating technology RFID, cloud database, and on-site personnel activity (inspection-investigation etc.)

2. EHS Automation results: Comprehensive Site-to-HQ Live EHS Data for deep analytical of preventive incident presented with interactive (custom design).

Projects 01 02@2x

Generated opportunity of new marketing products with:

1. Implementing Radial Stacker Crusher Design (CR-12) to prepare 5-6 coal qualities blending

2. Total project value approx. $3million.

Work Experience

PT. Sulawesi Cahaya Mineral, Mine Planning Engineer
Dec 2018 ~ Present

Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator

• Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown.
• Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration.
• Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Syjloebslimusj5clrpp

PT Indo Mining Services, Mining Project Manager
Jun 2018 ~ Dec 2018

Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Verbal and Written Communication Skills

• Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation).
• Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review.
• Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner).
• Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Cryrmebhq2xfijyvpnba

PT Berau Coal, Mining Engineering and General Management Operation Jul 2016 ~ Jun 2018

Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator

• Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director.
• Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge.
• Managing lead 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785.
• Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied.
• Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Hwj3d7qvcg5bxg7jgdev

PT Rokatera Prima Minera, Mining Geology and Planning Engineer

Oct 2014 ~ Jul 2016

Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience

• Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown.
• Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources.
• Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Dalgadzlkerbgilyau1g

PT LAPI ITB, Mining Environment Researcher
Oct 2013 ~ Oct 2014

Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by:

• Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis.
• Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.
Peydqgvkusldmnezdkt2

Education

Institut Teknologi Bandung, Master of Science (MS), Mining Engineering & Mine Environmental Management, 2013 ~ 2014

• 1 year fast track graduate program with full ITB Dean Scholarship focusing on Mine Environmental Mgt. Engineering (Geochemist & Mine Reclamation).
• Thesis project in open pit coal PT Bukit Asam to predict ARD/AMD potential by characterizing Cubical-Framboidal Pyrite in order.
• AJ-BCEP Student Exchange with a participant from ASEAN and Japan University Student with 3 campuses visited:
a. Institut Teknologi Bandung, Laboratorium visit, and Pongkor Underground Gold Mine, Bogor-Indonesia
b. Chulalongkorn University and Gypsum Open Pit Mine, Thailand
c. Kyushu University, laboratorium visit, and CINEST Resources Symposium Speaker in Kyushu-Japan
• 2013 CINEST Earth Resources Symposium Speaker in Kyushu-Japan, about Vein Deposit Gold Exploration report.
Jkere2ucmqecoztkpb8y

Institut Teknologi Bandung, Bachelor of Science (BS), Mining Engineering & Mining & Oil Exploration, 2009 ~ 2013

• 4 year undergraduate program with 2 years ITB Dean Scholarship focusing on Mining Engineering (Coal and Mineral Exploration, Planning, and Operation).
• Thesis project in creating a quantitative table of Resource-Reserve Conservation Evaluation by: a. Converting Indonesia Mineral and Energy Ministry Regulation into a quantitative table. b. Assessing exploratory documents and annual production - financial reports from 4 major mining corporate (Newmont Copper & Gold, KBK Gold, NHM Copper & Iron Ore) as a subject to evaluate.


• Field Leader of ITB Mining Student Orientation.
• Head of Logistics and Documentation Division of ITB President Election.
• Facilitator of ITB Oil-Gas-Mining Professional Discussion.
Bx1qzb8ghug2zifldddf