I'm born on 29th December 1985. I'm adaptable, creative, innovative, self motivated, and hard-worker who enjoy identifying, analyzing, solving problem and keeping my best work ethic working at any circumstances. My organizational activities had given me intuition on good analytical and leadership. My ability in communication had made me good working as a team as good as when I working on my own.
Juni 2010 - Present
- Checking & Editing/Modify PCB Design (Gerber)
- Editing & Convert BOM List from Customer to SAP and MMS system
- Analysis Customer CAD Data (XY & Gerber Data)
- Compare the New PCB sample with PCB Drawing / Gerber
- Editing & Convert PCB gerber for stencil check plot
- Editing, Prepare & Convert CAD Data for Mounter machine (Fuji, Hitachi & Yamaha Machines)
- Editing, Prepare & Convert CAD Data for SPI machines (PARMI)
- Editing, Prepare & Convert CAD Data for AOI machines (Mirtec)
- Generate Mounter Machine program (Fuji, Hitachi & Yamaha Machines)
- Manage & Backup mounter machines program after production
- Balancing the mounter machine program for line capacity
- Generate target Line capacity (UPH) based on machine cycle time
- Generate Flow Chart
- Generate Working Instruction
- Control and monitoring for NPI (New Product Introduction)
- Installation & Repair CPU
- Installation Machine Software
- Understanding ISO 45001 - 2018 (Healthy & Safety Management System)
Oktober 2005 - Juli 2009
- Qualification new production project / Model (Qual Model)
- Qualification new material project (Testing new material)
- Generate report qualification Material result for Supplier
- Generate report qualification Material result for Customer
- Analysis & Identification material problem during production
- Analysis & Identification material problem during production
- Generate SOP for QC & Production reference
- Generate Customer Notification Report
- Study & Modify material design if there is defect during production
- Conduct Meeting with Vendor / Supplier
September 2003 - September 2005
- Operating the Slitting & Bonder Tape Machines
- Set up the Slitting & Bonder Tape Machines
- Maintenance the Slitting & Bonder Tape Machines
Januari 2002 - Juli 2002
- PIC on Sub Store Area
- Handle stock material from Store to Production
- Record and report daily incoming material from Store
- Report and record daily output Line production
- Supervising and control Ribbon Lane production
2000 - 2003
I'm born on 29th December 1985. I'm adaptable, creative, innovative, self motivated, and hard-worker who enjoy identifying, analyzing, solving problem and keeping my best work ethic working at any circumstances. My organizational activities had given me intuition on good analytical and leadership. My ability in communication had made me good working as a team as good as when I working on my own.
Juni 2010 - Present
- Checking & Editing/Modify PCB Design (Gerber)
- Editing & Convert BOM List from Customer to SAP and MMS system
- Analysis Customer CAD Data (XY & Gerber Data)
- Compare the New PCB sample with PCB Drawing / Gerber
- Editing & Convert PCB gerber for stencil check plot
- Editing, Prepare & Convert CAD Data for Mounter machine (Fuji, Hitachi & Yamaha Machines)
- Editing, Prepare & Convert CAD Data for SPI machines (PARMI)
- Editing, Prepare & Convert CAD Data for AOI machines (Mirtec)
- Generate Mounter Machine program (Fuji, Hitachi & Yamaha Machines)
- Manage & Backup mounter machines program after production
- Balancing the mounter machine program for line capacity
- Generate target Line capacity (UPH) based on machine cycle time
- Generate Flow Chart
- Generate Working Instruction
- Control and monitoring for NPI (New Product Introduction)
- Installation & Repair CPU
- Installation Machine Software
- Understanding ISO 45001 - 2018 (Healthy & Safety Management System)
Oktober 2005 - Juli 2009
- Qualification new production project / Model (Qual Model)
- Qualification new material project (Testing new material)
- Generate report qualification Material result for Supplier
- Generate report qualification Material result for Customer
- Analysis & Identification material problem during production
- Analysis & Identification material problem during production
- Generate SOP for QC & Production reference
- Generate Customer Notification Report
- Study & Modify material design if there is defect during production
- Conduct Meeting with Vendor / Supplier
September 2003 - September 2005
- Operating the Slitting & Bonder Tape Machines
- Set up the Slitting & Bonder Tape Machines
- Maintenance the Slitting & Bonder Tape Machines
Januari 2002 - Juli 2002
- PIC on Sub Store Area
- Handle stock material from Store to Production
- Record and report daily incoming material from Store
- Report and record daily output Line production
- Supervising and control Ribbon Lane production
2000 - 2003