New Taipei City, Taiwan
A SI/PI validation assistant engineer with 1 year experience measuring the power integrity of automotive products. Considering the replacement rate of electric vehicles, I'm more optimistic about the development of servers due to big data and cloud computing. Also, I hope to have more opportunities to get in touch with different high-speed signal transmission interfaces and the PC x86 architecture.
Soldering, measuring power integrity by oscilloscope, digital multimeter and electronic load (ex. ripple, current limit, transient, startup / shutdown and etc), renting test equipment, using Allergo by searching for test points in the circuit diagrams, reading IC datasheet for checking specifications, and studying new topics (ex. studying de-embedded skills from VNA). I have participated in three projects and have been completed. Assist for importing automated testing for our power verification and saving 66% time from the former manual testing. Submit an investment allowance report in two weeks that has got approval by the division internal review.
四月 2022 - Present
2016 - 2020
2013 - 2016
New Taipei City, Taiwan
A SI/PI validation assistant engineer with 1 year experience measuring the power integrity of automotive products. Considering the replacement rate of electric vehicles, I'm more optimistic about the development of servers due to big data and cloud computing. Also, I hope to have more opportunities to get in touch with different high-speed signal transmission interfaces and the PC x86 architecture.
Soldering, measuring power integrity by oscilloscope, digital multimeter and electronic load (ex. ripple, current limit, transient, startup / shutdown and etc), renting test equipment, using Allergo by searching for test points in the circuit diagrams, reading IC datasheet for checking specifications, and studying new topics (ex. studying de-embedded skills from VNA). I have participated in three projects and have been completed. Assist for importing automated testing for our power verification and saving 66% time from the former manual testing. Submit an investment allowance report in two weeks that has got approval by the division internal review.
四月 2022 - Present
2016 - 2020
2013 - 2016