Cibitung, Bekasi Regency, West Java, Indonesia
Controlling Production Process on Assembly line 4 Wheel Division. Ensure production result reach the target, delivery on schedule, and improving assembly line performance regarding production capacity, work safety, and the quality of the product itself.
Line that under control: Switch Hazard Line, Switch Power Window Line, Switch Auto Mirror Line, Switch Back Up Lamp Line, Switch Seat Heater Line (5 Line