1. Participated in several product development projects: Wind shield type Head-Up Display(HUD) series, Combiner type HUD series, Kinematics HUD series, Telematics box(T-BOX), and automotive DVD player series.
2. Developed automated testing system that can measured mechanical, optics, and electronic.
3. Introduced automated testing system to production line in Guangzhou, and guided the skills transfer to engineers of factory side.
4. Improved automated testing efficiency and yield rate in factory, the testing efficiency had increased from 24 pcs/hour to 120 pcs/hour, and the yield rate had increased from 70% to 97%.
5. Cooperated with project manager and engineers of client side, including maintained service of automated testing system that we sold to them, analyzed test reports and provided validation solutions of products or equipment, took business trip to client sites to resolved the issues.
6. Analyzed test data and reproduced exception conditions to point out the problems might cause, documented technical reports and presented to engineers and manager, cooperated with people in different function or Business Unit to resolved root cause of problems.
7. Developed the validation plan, including documented test instruction and test summary, and established the automated testing tool base on the plan.
8. Validated the automated testing system by Gage R&R to confirmed the system is stable.
9. Cooperated with vendors on designed the test equipment or asked for solutions.