Sep 2020 - Present
1. Design the UI web automation test. (Data Related Platform)
2. Find out the root cause of failures in daily buildings which are running robot tests in parallel in CI/CD, then report the issue of daily build failure in the JIRA issue tracking system.
3. Optimize the tests to reduce the execution time.
Run tests in parallel to save time.
4. Review the new robot test pull request.