Ran an assembly line by myself
Lifted 50-80lb bonnets onto 25+ valves
Drilled bolts and glued them
Retrieved parts and built valves completely before it was moved on for testing.
Reason for leaving: My truck broke down after my shift and my supervisor terminated me after seeing I no longer had a running vehicle to get to work.