Dec 2018 - Present
More than 300 projects.
1. Developed preliminary RFI/RFQ mechanical design specifications & evaluation criteria
2. Plotted 2D/3D drawings and maintained the drawings on a regular basis
3. Reflected on the mold design/tryout process
4. Conducted mechanical analysis & design validation from pilot run to mass production