• Recorded various log details including Surveying, Request for inspection, pile bore log details, concrete pour card for 30 cast in-situ piles at MGBS site.
• Studied placing of viaduct segments and design and work specifications of Launching girders, gluing and tensioning process at Hi-Tech city stretch.
• Observed station construction of station Raidurg and studied its drawing and specifications.
• Studied various pier diagrams and different types of pier heads at MGBS site, their alignment and correlated it with works on-site.
• Observed casting of viaduct segments, laboratory tests and non-destructive testing.