avr. 2022 - Présent
Soldering, measuring power integrity (ex. ripple, current limit, startup / shutdown and etc) and signal integrity (ex. I2C, SPI, UART, TDT, S parameter and etc), making test report, new topic study and lesson learn. First assist for importing automated test for our power verification test and saving 66% time from the former manual test. Submit investment allowance report in two weeks and has passed the division internal approval.