Check and calculate the progress of the construction periodically
Review and approval of contractor progress
Check the work of the contractor to fit the implementation procedures
Recheck the list of total items in detail
Give a letter of reprimand QMC (Quality Monitoring Card) to the contractor executor of all the findings of the defective item, and oversee a team to check the list and handover of consumers
Accompanying the pre-hand over team to check the list and handover of consumers
Attend every field coordination meeting with the section head and report on all work progress
September 2021 - Present
February 2020 - September 2021
Calculating and drafting structure buildings of office extension, warehouse gable frame, foundation of moulding machine and storage of HDPE
Arraging RAB
Supervising project
Make sure expanse of material and wage
Doing checklist and supervising in the field from lower structure to upper structure
Doing daily and weekly mapping progress
Doing daily evaluation of field performance
October 2017 - April 2018
Title of my final project: Designing and Evaluating the Performance of Structures in Reinforced Concrete Buildings Using the Capacity Spectrum Method. Case Study: Building 31-floor Cibubur Area Depok West Java
Title of my Civil Engineering Work Practice Report : AEON Mall Southgate West Tanjung Project. The Method and Countermeasure of Bad Concrete on Vertical Element Work of Column Floor 1 Area 3A
Don't seek a life in the company. On the other hand, give life itself to the company, so you will also come alive.
TTL : Jepara, Jawa Tengah (9 November 1996)
LinkedIn : www.linkedin.com/in/ahmad-luthfi-mubarok-846a84123
Email : [email protected]
Phone : +62 822 4332 1149
Check and calculate the progress of the construction periodically
Review and approval of contractor progress
Check the work of the contractor to fit the implementation procedures
Recheck the list of total items in detail
Give a letter of reprimand QMC (Quality Monitoring Card) to the contractor executor of all the findings of the defective item, and oversee a team to check the list and handover of consumers
Accompanying the pre-hand over team to check the list and handover of consumers
Attend every field coordination meeting with the section head and report on all work progress
September 2021 - Present
February 2020 - September 2021
Calculating and drafting structure buildings of office extension, warehouse gable frame, foundation of moulding machine and storage of HDPE
Arraging RAB
Supervising project
Make sure expanse of material and wage
Doing checklist and supervising in the field from lower structure to upper structure
Doing daily and weekly mapping progress
Doing daily evaluation of field performance
October 2017 - April 2018
Title of my final project: Designing and Evaluating the Performance of Structures in Reinforced Concrete Buildings Using the Capacity Spectrum Method. Case Study: Building 31-floor Cibubur Area Depok West Java
Title of my Civil Engineering Work Practice Report : AEON Mall Southgate West Tanjung Project. The Method and Countermeasure of Bad Concrete on Vertical Element Work of Column Floor 1 Area 3A