Superintendent with 4+ years of experience in National and International Dredging projects such as the creation of Resort Island and Land Reclamation at Maldives Atoll, Port/Channel Deepening Projects, River Navigability channel development, Hydrography Survey and River Training. Skilled in Dredging and Cost Estimation, Overseeing technical staff, and assuring that projects are completed on schedule, within budget and according to specifications. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
www.linkedin.com/in/ali-shahbaz-349632139 +960 7407790/+91 9082978411
Van Oord • November 2022 - Present
- Assisting in Dredging Coordination
- Drafting Documents of Procedures and Reports.
- Assisting in the Preparation and execution part of the project
- Managing Logistics and Safety requirements with the operational team.
- Rock and Reclamation work at Addu Island, Maldives
- Island Creation in Addu City, Maldives
- Production Assessment Viz
V2 MARITIME LLP • December 2019 - October 2022
- Assisting in Tender Search and bid preparation.
- Assisting in E-Tendering/ E-Bidding Handling.
- Dredging & Cost Estimations
- Prepare all tender documents as per requirements
related to the bid.
- Assisting in Tender preparation and evaluation,
checking of logs,
Preparation of expenditures and maintenance
Tenders details.
- Client Dealing & Prepare logs, reports & records of
Clients
- Follow up with Vendors/OEMs
- Project Management
INLAND WATERWAYS AUTHORITY OF INDIA • January 2019 - December 2019
-Carrying out Monthly Hydrographic Survey at NW-1 for
safe and flexible navigation of river plying vessels.
-Dredge Operations Management and Cost Estimation
for Civil Department.
-Tendering for Approved Government Schemes.
-Strategies for river Training by Analytical Hydrographic
Database Study.
-Automation of Dredge calculation using Python
language.
IMS SHIP MANAGEMENT PVT. LTD • October 2017 - July 2018
-Managing and Reporting field progress to the Client for the Development of National Waterway-4,
River Krishna.
-Dredge Costing and Estimation to Assist in Preparation of Tender Procurement.
-Site Coordinator at JNPT for 4th Jetty Construction, Mumbai
-Supervision of Dredgers and Barges at JNPT, Mumbai
-Managing Staff and Resources at two Individual Sites JNPT, Mumbai and the Development of NW-4, River Krishna
-Preparation of DPR for ITD Cem on the project for
the Development of JNPT 4th Jetty.
INLAND WATERWAYS AUTHORITY OF INDIA • January 2017 - May 2017
-Dredging Observation and Estimation at National Waterways-1, River Ganga
-Assisting in Hydrographic Survey and Dredging Operations at NW1.
-Inland Navigational Program under the Sagarmala Project, A Central Government Project,
connecting the hinterland with river bodies.
GURU GAVINDA CONSTRUCTION • May 2014 - June 2015
-Ensuring safety procedures are carried out by the workers.
-Management and maintenance of machine parts inventory.
-Assisting the inspection team with scheduled and daily maintenance.
Dredging and Harbour Engineering • 2015 - 2017
M.Tech Dredging and Harbour Engineering
Mechanical Engineering • 2010 - 2014
B.Tech Mechanical Engineering
Classification Algorithm: Logistic Regression, K-NN, Decision Tree(CART, C4.5), Random Forest, SVM
Clustering Techniques: K-Means, Hierarchical
Dimensionality Reduction: PCA, LDA
EDA, Inferential Analytics, Hypothesis Test, t-test, ANOVA, ANCOVA, Outlier Detection, Inter-Quartile Ranges, Sampling Techniques, Boxplot
Languages: Python
Visualization Tools/Lib: Tableau, Matplotlib, Seaborn, ggplot2, Power BI
Databases: SQL, BigQuery, PostgreSQL
Others: MsOffice, Auto Cad, VOSS (Dredging Survey tool)
1. Machine Learning: Stanford Online
2. Data Analytics: Google
English — Native or Bilingual Hindi — Native or Bilingual
Superintendent with 4+ years of experience in National and International Dredging projects such as the creation of Resort Island and Land Reclamation at Maldives Atoll, Port/Channel Deepening Projects, River Navigability channel development, Hydrography Survey and River Training. Skilled in Dredging and Cost Estimation, Overseeing technical staff, and assuring that projects are completed on schedule, within budget and according to specifications. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
www.linkedin.com/in/ali-shahbaz-349632139 +960 7407790/+91 9082978411
Van Oord • November 2022 - Present
- Assisting in Dredging Coordination
- Drafting Documents of Procedures and Reports.
- Assisting in the Preparation and execution part of the project
- Managing Logistics and Safety requirements with the operational team.
- Rock and Reclamation work at Addu Island, Maldives
- Island Creation in Addu City, Maldives
- Production Assessment Viz
V2 MARITIME LLP • December 2019 - October 2022
- Assisting in Tender Search and bid preparation.
- Assisting in E-Tendering/ E-Bidding Handling.
- Dredging & Cost Estimations
- Prepare all tender documents as per requirements
related to the bid.
- Assisting in Tender preparation and evaluation,
checking of logs,
Preparation of expenditures and maintenance
Tenders details.
- Client Dealing & Prepare logs, reports & records of
Clients
- Follow up with Vendors/OEMs
- Project Management
INLAND WATERWAYS AUTHORITY OF INDIA • January 2019 - December 2019
-Carrying out Monthly Hydrographic Survey at NW-1 for
safe and flexible navigation of river plying vessels.
-Dredge Operations Management and Cost Estimation
for Civil Department.
-Tendering for Approved Government Schemes.
-Strategies for river Training by Analytical Hydrographic
Database Study.
-Automation of Dredge calculation using Python
language.
IMS SHIP MANAGEMENT PVT. LTD • October 2017 - July 2018
-Managing and Reporting field progress to the Client for the Development of National Waterway-4,
River Krishna.
-Dredge Costing and Estimation to Assist in Preparation of Tender Procurement.
-Site Coordinator at JNPT for 4th Jetty Construction, Mumbai
-Supervision of Dredgers and Barges at JNPT, Mumbai
-Managing Staff and Resources at two Individual Sites JNPT, Mumbai and the Development of NW-4, River Krishna
-Preparation of DPR for ITD Cem on the project for
the Development of JNPT 4th Jetty.
INLAND WATERWAYS AUTHORITY OF INDIA • January 2017 - May 2017
-Dredging Observation and Estimation at National Waterways-1, River Ganga
-Assisting in Hydrographic Survey and Dredging Operations at NW1.
-Inland Navigational Program under the Sagarmala Project, A Central Government Project,
connecting the hinterland with river bodies.
GURU GAVINDA CONSTRUCTION • May 2014 - June 2015
-Ensuring safety procedures are carried out by the workers.
-Management and maintenance of machine parts inventory.
-Assisting the inspection team with scheduled and daily maintenance.
Dredging and Harbour Engineering • 2015 - 2017
M.Tech Dredging and Harbour Engineering
Mechanical Engineering • 2010 - 2014
B.Tech Mechanical Engineering
Classification Algorithm: Logistic Regression, K-NN, Decision Tree(CART, C4.5), Random Forest, SVM
Clustering Techniques: K-Means, Hierarchical
Dimensionality Reduction: PCA, LDA
EDA, Inferential Analytics, Hypothesis Test, t-test, ANOVA, ANCOVA, Outlier Detection, Inter-Quartile Ranges, Sampling Techniques, Boxplot
Languages: Python
Visualization Tools/Lib: Tableau, Matplotlib, Seaborn, ggplot2, Power BI
Databases: SQL, BigQuery, PostgreSQL
Others: MsOffice, Auto Cad, VOSS (Dredging Survey tool)
1. Machine Learning: Stanford Online
2. Data Analytics: Google
English — Native or Bilingual Hindi — Native or Bilingual