CakeResume Talent Search

Advanced filters
On
4 à 6 ans
6 à 10 ans
10 à 15 ans
Plus de 15 ans
Avatar of 吳明赫.
Avatar of 吳明赫.
Test Equipment Technician @Micron Technology 台灣美光
2018 ~ Présent
製程工程師、設備工程師、半導體工程師
Dans 1 mois
cost of ownership *Demonstrate ownership of assigned projects including coordination, installation, maintenance, documentation, modification, and overall support of equipment projects *Recommend equipment changes to improve process metrics *Transfer owned equipment knowledge to manufacturing with good support and documentation *Research, gather, and analyze information related to specific assignments within your technical discipline *During the mass production stage, MFG production capacity requirements need to be met and various states of the machine need to be repaired at the work site. *Machine maintenance and product yield improvement, including regular maintenance, parts replacement, parameter adjustment and execution program optimization, etc. Scanner Equipment
Microsoft Office
critical thinking
Analytical Skills
Employé
Prêt à l'interview
Temps plein / Je ne suis pas intéressé par le travail à distance
10 à 15 ans
南台科技大學
電機工程系
Avatar of the user.
Avatar of the user.
Past
FIRST CLASS SECOND ENGINEER @Evergreen Marine Corp
2017 ~ 2024
Chief engineer
Dans 1 mois
Marine Engineering
Engineering Management
Shipbuilding
Sans Emploi
Prêt à l'interview
Temps plein / Je ne suis pas intéressé par le travail à distance
6 à 10 ans
國立高雄科技大學 National Kaohsiung University of Science and Technology
Marine engineering
Avatar of DICKY DWI RIFALDI.
Avatar of DICKY DWI RIFALDI.
Staff Mechanic Avionic @PT. Batam Aero Technic
2019 ~ Présent
engineer
Dans 2 mois
DICKY DWI RIFALDI I'm young and Strongly, Independent with high initiative, good communication skills, able towork independently or as a part of a team, dynamic and flexible person and able to work unser pressure Indonesia Email : [email protected] Contact :Profesional Experience Mechanic Avionic • PT. Batam Aero Technic JanuariPresent I work as a mechanic and inspector in the avionics and electrical shop division. and I am also a storeman in my division Admin Leader • PT. Adhya Tirta Batam JanuariJuli 2017 MAKE A SCHEDULE OF PAYMENT, MAKE A DEAL WITH CONTRACTOR FEE ENTRY PART ASSEMBLY
leadership skills
Microsoft Office
Communication
Employé
Prêt à l'interview
Temps plein / Intéressé par le travail à distance
6 à 10 ans
State Polytechnic of Batam
MACHINE
Avatar of 梁雯玲.
Avatar of 梁雯玲.
Past
Senior Manager @Horizon-Brands LLC.,
2021 ~ Présent
Business Development, Product Manager, Project Management, Business Operations, Process Design
Dans 1 mois
數據改善產品 專案經理 • 怡利電子股份有限公司 一月十月 2017 Responsible for carrying out projects under agreed scope, budget, schedule and customer expectations. Coordinate and negotiate among supervising, direction and motivating teams of multi-discipline contractors and team. 1. Development new product SPEC with Apple team. 2. Developing a new system with Auto OEM vehicle makers in Japan before model launch. 3. Design new product and system at company 4. Design the first Android system then get
Agile
NPI
Product Management
Sans Emploi
Prêt à l'interview
Temps plein / Intéressé par le travail à distance
Plus de 15 ans
文化大學
經濟
Avatar of the user.
Avatar of the user.
Past
Technical Manager @仲琦科技
2022 ~ 2023
PM/產品經理/專案管理
Dans 1 mois
Golang
AWS
Project Management
Sans Emploi
Prêt à l'interview
Temps plein / Je ne suis pas intéressé par le travail à distance
4 à 6 ans
Chung Hua University
Computer Engineering
Avatar of the user.
Avatar of the user.
Senior Civil Superintendent @Hofusan S.A.P.I. DE C.V.
2017 ~ 2022
Dans 1 an
Word
Excel
excel
Employé
Prêt à l'interview
Temps plein / Je ne suis pas intéressé par le travail à distance
Plus de 15 ans
UNIVERSIDAD REGIOMONTANA
Civil Engineering
Avatar of Kimberly Yu.
Project Manager
Plus d'1 an
and reports for key launch meetings aimed at engaging key leadership across hospital systems, community organizations, payers, and Department of Health. Increased patient access to care in 10+ primary care clinics, improved conversion of positive diagnosis to treatment, and established training for additional health care providers across various disciplines. Coordinated with Financial Administrator to manage budgets and successfully meet deadlines for deliverable goals across 6-8 multiple projects. Collaborated closely with Data Managers to develop data management tools and address data collection challenges to improve data collection errors. Hired, trained, and supervised team of 16
Word
Excel
Outlook
Prêt à l'interview
Temps plein / Intéressé par le travail à distance
4 à 6 ans
New York University
MPH
Avatar of R Yanuar FY.
Avatar of R Yanuar FY.
Past
Senior Architect @Diamond Land Development
2023 ~ 2024
senior architecture /interior designer
Dans 1 mois
— R Yanuar FY I lead and managing architecture design of hotel projects, ranging from 3-star to 5-star categories. With over 10 years of experience in the architecture and planning industry, I have developed a strong expertise in hospitality design, 3D visualization, and architectural project management. I collaborate with principals from various disciplines, contractors, and project owners to ensure the proper execution and delivery of the projects. I also represent the principal to project meetings, explaining the design concept and resolving any issues. Some of the projects I have worked on include The Imperial
AutoCAD
Word
PowerPoint
Sans Emploi
Ouvert à de nouvelles opportunités
Temps plein / Intéressé par le travail à distance
10 à 15 ans
SMA Negeri 6 Jakarta
Avatar of Mike Hung.
Avatar of Mike Hung.
Past
Welding, QC Manager @PT. MEINDO ELANG INDAH
2011 ~ Présent
Construction manager, Welding manager, QC manager
Dans 1 mois
magna aliquam erat volutpat. Vietnam Maritime University Naval Archietecture •Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Skills 1. Strong leadership, ability to handle multitasks and a team from 200 – 250 pax of multi disciplines & cultures. 2. Steel metallurgy and welding including exotic materials 3. Onshore and offshore construction methods 4. Welding processes and equipment for offshore pipeline welding 5. Coating for pipeline, onshore & offshore structure 6. Good in presentation and communication 7. Good problem s.
powerpoint
Excel
Microsoft Office
Sans Emploi
Ouvert à de nouvelles opportunités
Temps plein / Je ne suis pas intéressé par le travail à distance
Plus de 15 ans
Balai Besar Bahan dan Barang Teknik (B4T)
International Welding Engineer
Avatar of Juan Constantine.
Avatar of Juan Constantine.
Mechanical Design Drafter @PT. Otopakindo Anugrah, Indonesia
2020 ~ 2022
Electrical Engineer, Mechanical Engineer
Dans 1 mois
Juan Constantine 陳高祥[email protected] Taipei City, Taiwan https://www.linkedin.com/in/juanconstantine/ Experienced engineer with 4+ years of experience as maintenance engineer and machine designer. Practical knowledge in factory utility maintenance, water treatment, steam system, machine automation, machine design, and CAD software. Responsible professional with good work ethic and willingness to learn. Education 教育經歷 2022年2月年2月 Master's degree 碩士 國立台灣科技大學 National Taiwan University
Autodesk Inventor
Microsoft Office
SolidWorks
Étudiant
Ouvert à de nouvelles opportunités
Temps plein / Je ne suis pas intéressé par le travail à distance
4 à 6 ans
國立台灣科技大學 National Taiwan University of Science and Technology
Electrical Engineering - Power System

Le Plan de Recrutement le Plus Efficace et Facile

Recherchez 800.000 CV et prenez l'initiative de contacter les candidats pour améliorer votre taux de recrutement. Le Choix de Centaines d'Entreprises

  • Consulter tous les résultats
  • Démarrer des nouvelles conversations sans limites
  • Seules les entreprises avec un abonnement peuvent consulter les CV
  • Consulter les adresses email et les numéros de téléphone des utilisateurs
Conseils de Recherche
1
Search a precise keyword combination
senior backend php
If the number of the search result is not enough, you can remove the less important keywords
2
Use quotes to search for an exact phrase
"business development"
3
Use the minus sign to eliminate results containing certain words
UI designer -UX
Seuls les CV publics sont disponibles avec pour les utilisateurs gratuits.
Mettez à niveau vers un abonnement Supérieur pour voir tous les résultats de recherche dont des dizaines de milliers de CV exclusifs à CakeResume.

Definition of Reputation Credits

Technical Skills
Specialized knowledge and expertise within the profession (e.g. familiar with SEO and use of related tools).
Problem-Solving
Ability to identify, analyze, and prepare solutions to problems.
Adaptability
Ability to navigate unexpected situations; and keep up with shifting priorities, projects, clients, and technology.
Communication
Ability to convey information effectively and is willing to give and receive feedback.
Time Management
Ability to prioritize tasks based on importance; and have them completed within the assigned timeline.
Teamwork
Ability to work cooperatively, communicate effectively, and anticipate each other's demands, resulting in coordinated collective action.
Leadership
Ability to coach, guide, and inspire a team to achieve a shared goal or outcome effectively.
Dans 1 an
Advanced Project Manager
Taiwan Cube Energy
2022 ~ Présent
Taiwan
Professional Background
Statut Actuel
Sans Emploi
Progrès de la Recherche d'Emploi
Professions
Project Manager
Fields of Employment
Énergie
Expérience Professionnelle
6 à 10 ans
Management
I've had experience in managing 5-10 people
Compétences
Cooperative
Disciplines
Sustainability
Communication
Team Working
Negotiating
Negotiation
Project Construction Management
Technology Evaluation
Strategic Negotiation
Langues
Chinese
Natif ou Bilingue
English
Professionnel
Job search preferences
Position Désirée
Advanced Project Manager
Type d'emploi
Temps plein
Lieu Désiré
Travail à distance
Intéressé par le travail à distance
Freelance
Non.
Éducation
École
National Taiwan University
Spécialisation
Chemical engineering
Imprimer

Wei-Fu Chuang 

Certificated Industrial Engineer and capital investment project manager

  [email protected]   https://www.linkedin.com/in/wei-fu-chuang-a8a7b787/   (+886)920860193    Taiwan, Taipei

Certificate Industrial engineer and a skilled capital investment project manager, specializing in project leadership, business thinking, resource allocation and  project sourcing.

Key Skills


Strategic Planning

Proficient in developing comprehensive strategic plans ,financial analysis, and goal alignment for capital investment projects

Business Savvy

Conducting comprehensive business analyses, gathering requirements, and identifying opportunities to optimize processes and drive informed decision-making in projects. 

Leadership

Guiding and inspiring cross-functional teams, fostering a collaborative environment, and driving performance to achieve project objectives

Risk management

Conducting thorough risk assessments, implementing proactive mitigation strategies, and developing contingency plans to minimize project risks and ensure successful outcomes.

Work Experience


Project Development Manager  •  Taiwan Cube Energy  January 2022 - April 2022

Executing government tender project development, conducting  competitor analysis to find potential competitors and partners

Conducting plant pre-project planing, successfully developing an EPC ITP for a 3.3 million plant

Advanced Project Manager  •  Formosa Chemicals & Fibre September 2017- January 2022

Executing Mega Greenfield Development O&G Project, team-working with the major contractors like Fluor, CTCI and ensuring seamless communication for all disciplines. Project on schedule and on budget. 

Managing EIA application and Emission Control, Utilizing BACT measurement to reduce 70% of VOC compared to the same capa. plant. Air permit/Land-Use granted by US state gov.


Conducting process optimizationdecreasing utility consumption to 90% of the original design factor.  

Site Construction Manager  •  Formosa Chemicals & Fibre March 2017 - September 2017

Executing EPC Project Construction Management, achieving no-change-order/on-schedule goal

Establishing Site Safety Culture, achieving no-near-misses and no-casualty KPI during construction

Process R&D Engineer  •  Formosa Chemicals & Fibre December 2011 - March 2017

Conducting Wastewater and UPW facility basic design and lead a commission team to realizing design in VN. 

Education and Certification


National Taiwan University

Chemical engineering

2005 - 2010

Certificate Industrial Engineer, CIIE

Certificate Pollutant control specialist, EPA Taiwan gov.

Major Project List


SunShine Project Louisiana USA, $1.2B

Executing mega greenfield project as project manager. Managing FEL 1, FEL 2, FEL-3 projects and ensuring the project is on schedule and on budget.

Managing EIA application, and Land-Use granted in 2018.

Fine chemical facility project Tainan, TW €12M 

Executing EPC project as construction manager, no change order and on project schedule

Managing Site EHS,  no near-misses and no casualties during construction.

Power Plant FGD Project Vietnam 30 M USD

Developing and designing advanced processes in Vietnam, leading a 5-person team to complete punch and commission work on time.

Specialty gas facility project Taiwan,TW €1.5M 

Developing and designing advanced processes in Vietnam, leading a 5-person team to complete punch and commission work on time. 

Resume
Profile

Wei-Fu Chuang 

Certificated Industrial Engineer and capital investment project manager

  [email protected]   https://www.linkedin.com/in/wei-fu-chuang-a8a7b787/   (+886)920860193    Taiwan, Taipei

Certificate Industrial engineer and a skilled capital investment project manager, specializing in project leadership, business thinking, resource allocation and  project sourcing.

Key Skills


Strategic Planning

Proficient in developing comprehensive strategic plans ,financial analysis, and goal alignment for capital investment projects

Business Savvy

Conducting comprehensive business analyses, gathering requirements, and identifying opportunities to optimize processes and drive informed decision-making in projects. 

Leadership

Guiding and inspiring cross-functional teams, fostering a collaborative environment, and driving performance to achieve project objectives

Risk management

Conducting thorough risk assessments, implementing proactive mitigation strategies, and developing contingency plans to minimize project risks and ensure successful outcomes.

Work Experience


Project Development Manager  •  Taiwan Cube Energy  January 2022 - April 2022

Executing government tender project development, conducting  competitor analysis to find potential competitors and partners

Conducting plant pre-project planing, successfully developing an EPC ITP for a 3.3 million plant

Advanced Project Manager  •  Formosa Chemicals & Fibre September 2017- January 2022

Executing Mega Greenfield Development O&G Project, team-working with the major contractors like Fluor, CTCI and ensuring seamless communication for all disciplines. Project on schedule and on budget. 

Managing EIA application and Emission Control, Utilizing BACT measurement to reduce 70% of VOC compared to the same capa. plant. Air permit/Land-Use granted by US state gov.


Conducting process optimizationdecreasing utility consumption to 90% of the original design factor.  

Site Construction Manager  •  Formosa Chemicals & Fibre March 2017 - September 2017

Executing EPC Project Construction Management, achieving no-change-order/on-schedule goal

Establishing Site Safety Culture, achieving no-near-misses and no-casualty KPI during construction

Process R&D Engineer  •  Formosa Chemicals & Fibre December 2011 - March 2017

Conducting Wastewater and UPW facility basic design and lead a commission team to realizing design in VN. 

Education and Certification


National Taiwan University

Chemical engineering

2005 - 2010

Certificate Industrial Engineer, CIIE

Certificate Pollutant control specialist, EPA Taiwan gov.

Major Project List


SunShine Project Louisiana USA, $1.2B

Executing mega greenfield project as project manager. Managing FEL 1, FEL 2, FEL-3 projects and ensuring the project is on schedule and on budget.

Managing EIA application, and Land-Use granted in 2018.

Fine chemical facility project Tainan, TW €12M 

Executing EPC project as construction manager, no change order and on project schedule

Managing Site EHS,  no near-misses and no casualties during construction.

Power Plant FGD Project Vietnam 30 M USD

Developing and designing advanced processes in Vietnam, leading a 5-person team to complete punch and commission work on time.

Specialty gas facility project Taiwan,TW €1.5M 

Developing and designing advanced processes in Vietnam, leading a 5-person team to complete punch and commission work on time.