CakeResume 找人才

進階搜尋
On
4 到 6 年
6 到 10 年
10 到 15 年
15 年以上
National Taiwan University
New Taipei City, Taiwan
Avatar of the user.
Avatar of the user.
Media Planning Assistant Manager @DAC_台灣迪艾思股份有限公司
2023 ~ 現在
Account Manager
一個月內
Word
Excel
PowerPoint
就職中
正在積極求職中
全職 / 暫不考慮遠端工作
4 到 6 年
National Taiwan University
Bachelor
Avatar of Chien Chou Hong.
Avatar of Chien Chou Hong.
Director of Operations @Jmen Taiwan - Jiuh Men 鉅門工業
2020 ~ 現在
資深產品經理 Senior Product Manager
一個月內
洪健洲 Chien Chou Hong 12 年專案管理經驗,4 年團隊主管經驗 7 年以上敏捷式軟體開發團隊 Product Manager / Product Owner / Scrum Master 經驗,專注於軟體產品的開發,負責進行用戶訪談、繪製產品線稿、制定產品規格、並協助團隊進行驗證 擅長對內與開發團隊成員整合意見,以
Agile Project Management
Scrum
User Experience Design
就職中
正在積極求職中
全職 / 對遠端工作有興趣
10 到 15 年
National Taiwan University
Electronics Engineering
Avatar of the user.
Avatar of the user.
Controls/Software Engineer @CYTENA BPS
2022 ~ 現在
Software Engineer / Backend Engineer
一個月內
Word
Google Drive
Project Management
就職中
正在積極求職中
全職 / 對遠端工作有興趣
6 到 10 年
National Taiwan University
Computer Science
Avatar of 曾柏硯.
Avatar of 曾柏硯.
AI Technical Lead @WeBIM Services
2024 ~ 現在
前端工程師、後端工程師、全端工程師
一個月內
Preston Tseng AI Technical Lead at WeBIM Services Since high school, I have embarked on a journey of self-education in programming. My enthusiasm for technology motivated me to enroll in computer science courses throughout my university and postgraduate studies. Eager to refine my practical skills, I actively participated in internships and side-projects from my university years. Initially, I began my career as a front-end developer. However, my eagerness to expand my skill set led me to volunteer for back-end development tasks, ultimately transitioning into a full-stack developer role. I possess
HTML/CSS
JavaScript
Node.js
就職中
目前會考慮了解新的機會
全職 / 對遠端工作有興趣
4 到 6 年
National Taiwan University
Civil Engineering (Division of Transportation Engineering)
Avatar of the user.
Avatar of the user.
Product DEV Support Supervisor @Wiwynn
2021 ~ 現在
PM/產品經理/專案管理
一個月內
Word
Excel
Microsoft Office
就職中
目前會考慮了解新的機會
全職 / 對遠端工作有興趣
4 到 6 年
National Taiwan University
圖書資訊學系
Avatar of Denny Lin.
Avatar of Denny Lin.
Software Engineer @Netskope
2023 ~ 現在
Senior Software Engineer
一個月內
Denny Lin 林亮圻 3 years experience in software development on cloud ( AWS / Azure ) 2 years experience in DevOps Python, Go, Java Bachelor of Computer Science & Information Engineering , National Taiwan University Software engineer, DevOps [email protected] Experience Trend Micro Inc. , Software Engineer, Dec 2019 ~ Dec 2021 Developing a WYSIWYG system for threat experts to analyze host activity logs and generate alerts / reports from them Integrating host activity logs from upstream, normalizing by data analysis packages like Python Pandas Using ElasticSearch and Kibana for data tagging, aggregating and alerting Building a version
MySQL
Golang
Redis
就職中
目前沒有興趣尋找新的機會
全職 / 對遠端工作有興趣
4 到 6 年
National Taiwan University
Computer Science
Avatar of Yu-Chuan Chiang.
Avatar of Yu-Chuan Chiang.
Senior Software Engineer @Moldex3D ( CoreTech System Co. Ltd.)
2016 ~ 現在
Senior Software Engineer
超過一年
Yu-Chuan Chiang Senior Software Engineer - Have 6+ years of experience in computational fluid dynamics (CFD) software development with C++. - Proactively looking for a new job opportunity and new challenges. - Skills : C++, TDD, Unit Testing, Refactoring, SOLID Design Principles, GitLab CI Hsinchu, Hsinchu City, Taiwan 工作經歷 Senior Software Engineer • Moldex3D ( CoreTech System Co. Ltd.) - Refactored Moldex 3D's new-gen CFD numerical kernel solvers platform architecture. - Designed and developed core modules of Molde3D's next-gen CFD platform. - Focus on increasing the code quality and scalability
C++
TDD (Test-driven development)
Refactoring
就職中
目前沒有興趣尋找新的機會
全職 / 對遠端工作有興趣
4 到 6 年
National Taiwan University
Civil Engineering
Avatar of 李芃函 (Sylvia).
Avatar of 李芃函 (Sylvia).
Supply Chain Specialist @Tsaitung Agriculture
2020 ~ 現在
一年內
李芃函 (Sylvia) Hi~我是Sylvia,曾是流轉的小島民,在友邦漂流的歲月稍稍多過在台灣工作的時間,但這也代表各種適應能力的證明。能在各個新環境細心觀察並預先做出判斷與決策,安然度過駐外的每一天,這是書本上無法學到的。透過行萬里路,的確有
Word
PowerPoint
Google Drive
全職 / 對遠端工作有興趣
6 到 10 年
National Taiwan University
Horticulture

最輕量、快速的招募方案,數百家企業的選擇

搜尋履歷,主動聯繫求職者,提升招募效率。

  • 瀏覽所有搜尋結果
  • 每日可無限次數開啟陌生對話
  • 搜尋僅開放付費企業檢視的履歷
  • 檢視使用者信箱 & 電話
搜尋技巧
1
嘗試搜尋最精準的關鍵字組合
資深 後端 php laravel
如果結果不夠多,再逐一刪除較不重要的關鍵字
2
將須完全符合的字詞放在雙引號中
"社群行銷"
3
在不想搜尋到的字詞前面加上減號,如果想濾掉中文字,需搭配雙引號使用 (-"人資")
UI designer -UX
免費方案僅能搜尋公開履歷。
升級至進階方案,即可瀏覽所有搜尋結果(包含數萬筆覽僅在 CakeResume 平台上公開的履歷)。

職場能力評價定義

專業技能
該領域中具備哪些專業能力(例如熟悉 SEO 操作,且會使用相關工具)。
問題解決能力
能洞察、分析問題,並擬定方案有效解決問題。
變通能力
遇到突發事件能冷靜應對,並隨時調整專案、客戶、技術的相對優先序。
溝通能力
有效傳達個人想法,且願意傾聽他人意見並給予反饋。
時間管理能力
了解工作項目的優先順序,有效運用時間,準時完成工作內容。
團隊合作能力
具有向心力與團隊責任感,願意傾聽他人意見並主動溝通協調。
領導力
專注於團隊發展,有效引領團隊採取行動,達成共同目標。
一年內
Optimization Analyst(Associate Engineer)
Logo of Taiwan Semiconductor Manufacturing  台灣積體電路製造股份有限公司.
Taiwan Semiconductor Manufacturing 台灣積體電路製造股份有限公司
2020 ~ 現在
Hsinchu County, Taiwan
專業背景
目前狀態
就職中
求職階段
專業
其他
產業
工作年資
4 到 6 年
管理經歷
我有管理 1~5 人的經驗
技能
C++
Combinatorial Optimization
Operation Research
Scheduling
Statistics
machine learning
Reinforcement Learning
PowerPoint
Excel
SQL
語言能力
English
進階
Chinese
母語或雙語
求職偏好
希望獲得的職位
Algorithm Designer
預期工作模式
全職
期望的工作地點
台灣新竹市, 台灣台中, 台灣台北市, 台灣新北市, 台灣台南市
遠端工作意願
對遠端工作有興趣
接案服務
學歷
學校
National Taiwan University
主修科系
Industrial Engineering
列印
Ir7coupdergih3exfk1g

郭哲銘(Galen Kuo)

Algorithm Designer  •  +886-930218256 •  [email protected]

     

Operation Research / Machine Learning / Algorithm / Optimization Modeling


 • Cultivated with statistical learning, artificial Intelligence, linear programming, production and manufacturing management and other quantitative reasoning fields. 

 • Work on and Explore occupations related to algorithms, combinatorics and optimization. 

 • Eager to explore and analyze data to support business finding potential knowledge and insight through optimization technique and data analysis method 


 A resourceful operation analyst with sharp quantitative and programming skills possesses 3-year experience deal with optimization problem in Semiconductor Company, TFT-LCD Panel Industry, specialty memory IC company, printed circuit board (PCB) industry, and Electronic Assembly Manufacturer.


Here's my LinkedIn, Personal Web, mail and GitHub


Advanced Skills


Programming Language

Familiar with Object Oriented Programming(C++, Java, C#) and other high-level programming language including R, Python and Excel VBA.


Operation Research

An optimal analyst possesses 3-year experience deal with optimization problem.

Work on and Explore occupations related to algorithms, combinatorics and optimization.


Machine Learning

Apply reinforcement learning framework to optimization problem with high complexity, huge size and complicated constraints.

Focus on MCTS, optimization theory, reinforcement learning and statistical techniques.

Optimization Programming


• Build a tree-based reinforcement learning optimization algorithm applying ensemble dispatching rules and Monte Carlo Tree Search (MCTS) to solve scheduling problems with huge size under short time constraints /* Patent ID : TWI633504 */ 

• Develop a heuristic algorithm method(Lagrangian relaxation method) to solve scheduling problem in a large scale for searching a good solution in an effective way.

• Develop a integrated system contains efficient meta-heuristics algorithm such as GA, PSO with Chaos-based initialization, ACO and AFSA(Artificial Fish-Swarm Algorithm) to solve classic benchmark including TSP, assignment problem and bin packing problem. 

• Experienced in linear programming language such as OOP with Lingo / Cplex package.

• Build a fuzzy inference system contains 10+ membership function in C#.

• Implement Back Propagation Neural Network in C#.

工作經歷

Industrial Technology Research Institute (ITRI)(工業技術研究院, 工研院), Data Analyst & Optimization Analyst (2nd year), Dec 2017 ~ 現在

Focused on reinforcement learning, statistics method and optimization techniques 

• Built model to simulate Photolithography & Patterning System and optimize its production schedule. Raise 6.9% PoH(pieces per hour) in 70% cases, 3.75% on average. Total computation time required is less than 5 min. The expected revenue earned is over 50 million (DRAM Devices Industry) 


• Developed batching scheduling algorithm and setup a flexible 3-D data structure to storage highly varying scheduling data in small-volume, large-variety production system. Increase 11% order fill rate and reduce 20% computing time (Printed Circuit Board (PCB) Industry) 


• Designed dispatching rules to solve mass production scheduling problem with huge size(30000+ jobs and 100+ machines) in 10 minutes. Implement divide and conquer algorithm to saved 80%+ computation time and meet 99% utilization (TFT-LCD Panels Industry)

Yafbmnex8a0jrkvjt4xe

Industrial Technology Research Institute (ITRI)(工業技術研究院, 工研院), Data Analyst & Optimization Analyst (1st year), Dec 2016 ~ Dec 2017

Intelligent Analytic Tech. Div - Data Analytic Tech. Dept 


 • Built a tree-based reinforcement learning optimization algorithm applying ensemble dispatching rules and Monte Carlo Tree Search (MCTS) to solve scheduling problems with huge size under short time constraints /* Patent ID : TWI633504 */ 


• Developed Intelligent Scheduling Technology to solve complicated combination problem and ensured projects were delivered on or ahead of schedule 

  - Set up the Tree-based Scheduling Algorithm to optimize the schedule problem under many constraints and achieve the required objective(min makespan/WIP/...) 

  - Built related module in scheduling problems such as batching process, mask transportation, preserving maintenance, out sourcing, reticle sharing, unexpected crash, machine setup and yield issue 


 • Developed an algorithm to analyze workload of manufacturing system by statistical theory and unsupervised clustering method

Yafbmnex8a0jrkvjt4xe

LMPMARKET PTE. LTD., Singapore, Partner and Optimization Analyst, Dec 2018 ~ 現在

• Building the programming solver to generate best supply strategy by considering elasticity of capacity between electricity spot market and power generator with long term contractual commitments. Work with Dr. Yen-Shong Chiao, Singapore
 • Maintaining programming model to ensure that current solver meets customer needs and constraints

Va3azqla37fie60whlzy

LMPMARKET PTE. LTD., Singapore, Optimization Analyst and Algorithm Programmer, May 2017 ~ Dec 2018

• Power Network Planning and Optimization

 - Built and modified the Linear Programming Model to represent a Electric Power Network System

 - Solved the problem and determine optimal electric power supply strategy based on known demand and capacity in Java(with Lingo Package)


• Searched for potential strategy to improve transporting strategy by sensitivity analysis and constraints relaxation

 - (Seller) Find best power transmission strategy to maximize revenue(at lowest transportation loss)

 - (Buyer) Find best transaction strategy to minimize cost(result from price differences of many power generators between different areas)

Va3azqla37fie60whlzy

Industrial Technology Research Institute (ITRI)(工業技術研究院, 工研院) Research Intern - Machine Learning Project, Mar 2015 ~ Dec 2015


• Built a unsupervised clustering model, including hierarchical algorithm(HA) and k-means clustering, to analysis complex time series of indicator, for example, PM10 and PM2.5 concentrations at Taiwan based on data from Taiwan Air Quality Monitoring Network

 

• Visualized the air quality data by statistical techniques and plot results in R language


• Compared the common machine learning algorithms, including support vector machine, neural network, decision tree, radon forest and so on in various data set in R language in order to realize the characteristic of each algorithm, and organized into technical documents


 • Built the simulation model about traffic system for the demonstration of application in data analytic in Java

Lqqphmgilafddf91vdr9

Cloud Farm, Product Manager, Jun 2012 ~ Jul 2014

Project planning, Web Database Development and Marketing  


• Design the MVC(Model–view–controller) architecture of system, and implement the database design and web programming

• Arranged harvesting schedule by considering the planting time, demand and due date of order. Responsible for daily logistics management and shipping

• In charge of sale and communicate with customers, acknowledging of orders and hold the customer complaints

• Lead a team of 8 people and successfully develop e-commerce and business model to expanse distribution channel of local agriculture, increasing 15% of retail revenue

• Analyze the planting process, transforming to manufacturing structure to build food traceability by ERP(Enterprise Resource Planning)

• Target and connect to potential customers who are likely to bulk order and help farmer pricing products, eventually winning the 5 cases of companies order with 200+ carton of agricultural products


Lqqphmgilafddf91vdr9

Publications

Conference Papers

  • Che-Ming Kuo, Heuristic Algorithm for Scheduling of Make-to-Order Plant Factory with Considering Crops Size Variation during Cultivation, Chinese Institute of Industrial Engineers Annual Conference(CIIE2015).
  • Kwei-Long Huang, Chao-Lung Yang, Che-Ming Kuo*(corresponding author) and Hao-Chen Weng, A Plant Factory Scheduling Research with Multi-Period Harvest, The 17th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2016).

Master's Thesis 
  • A Scheduling Research in Plant Factory with Considering Multi-Period Harvest, 2016

Patent
  • Tsung-Jung Hsieh, Sen-Chia Chang, Yao-Chung Hsu, Che-Ming Kuo, I-Hsuan Chung, Tree Search-Based Scheduling Method and An Apparatus Using the Same (TW I633504B)

學歷

National Taiwan University, 科學碩士(MS), Industrial Engineering, 2015 ~ 2016

Master Thesis : A Scheduling Research in Plant Factory with Considering Multi-Period Harvest 


This study focus on the crop-scheduling problem for a plant factory and consider the special property of crops which can be harvested multiple times. This scheduling problem is formulated as a mixed integer programming (MIP) problem. 


The objective function is defined as to find the maximum revenue for the plant factory under the consider of different practical condition including types of crops, cultivation room number, cultivation room space, heterogeneous harvesting amount among different environment of cultivation room and multiple harvesting period. 


This study develops a heuristic algorithm method(Lagrangian relaxation method) to solve scheduling problem in a large scale for searching a good solution(gap is less than 20%) in an effective way(reduce 90%+ computing time).

Cq44s6qe9viokbqtrtwp

National Taiwan University of Science and Technology, 科學碩士(MS), Industrial Management, 2014 ~ 2015

Attended, earning 20+ credits in manufacturing, artificial intelligence and algorithm field, and transfer to Nation Taiwan University to got an MS in Industrial Engineering.

If71y54ln23v2tmbmj6g

National Yunlin University of Science and Technology, 工學學士(BEng), Industrial Engineering and Management, 2010 ~ 2014

Graduating in the honor of the first lead.

Ptbcopit4trubchjwn6r
履歷
個人檔案
Ir7coupdergih3exfk1g

郭哲銘(Galen Kuo)

Algorithm Designer  •  +886-930218256 •  [email protected]

     

Operation Research / Machine Learning / Algorithm / Optimization Modeling


 • Cultivated with statistical learning, artificial Intelligence, linear programming, production and manufacturing management and other quantitative reasoning fields. 

 • Work on and Explore occupations related to algorithms, combinatorics and optimization. 

 • Eager to explore and analyze data to support business finding potential knowledge and insight through optimization technique and data analysis method 


 A resourceful operation analyst with sharp quantitative and programming skills possesses 3-year experience deal with optimization problem in Semiconductor Company, TFT-LCD Panel Industry, specialty memory IC company, printed circuit board (PCB) industry, and Electronic Assembly Manufacturer.


Here's my LinkedIn, Personal Web, mail and GitHub


Advanced Skills


Programming Language

Familiar with Object Oriented Programming(C++, Java, C#) and other high-level programming language including R, Python and Excel VBA.


Operation Research

An optimal analyst possesses 3-year experience deal with optimization problem.

Work on and Explore occupations related to algorithms, combinatorics and optimization.


Machine Learning

Apply reinforcement learning framework to optimization problem with high complexity, huge size and complicated constraints.

Focus on MCTS, optimization theory, reinforcement learning and statistical techniques.

Optimization Programming


• Build a tree-based reinforcement learning optimization algorithm applying ensemble dispatching rules and Monte Carlo Tree Search (MCTS) to solve scheduling problems with huge size under short time constraints /* Patent ID : TWI633504 */ 

• Develop a heuristic algorithm method(Lagrangian relaxation method) to solve scheduling problem in a large scale for searching a good solution in an effective way.

• Develop a integrated system contains efficient meta-heuristics algorithm such as GA, PSO with Chaos-based initialization, ACO and AFSA(Artificial Fish-Swarm Algorithm) to solve classic benchmark including TSP, assignment problem and bin packing problem. 

• Experienced in linear programming language such as OOP with Lingo / Cplex package.

• Build a fuzzy inference system contains 10+ membership function in C#.

• Implement Back Propagation Neural Network in C#.

工作經歷

Industrial Technology Research Institute (ITRI)(工業技術研究院, 工研院), Data Analyst & Optimization Analyst (2nd year), Dec 2017 ~ 現在

Focused on reinforcement learning, statistics method and optimization techniques 

• Built model to simulate Photolithography & Patterning System and optimize its production schedule. Raise 6.9% PoH(pieces per hour) in 70% cases, 3.75% on average. Total computation time required is less than 5 min. The expected revenue earned is over 50 million (DRAM Devices Industry) 


• Developed batching scheduling algorithm and setup a flexible 3-D data structure to storage highly varying scheduling data in small-volume, large-variety production system. Increase 11% order fill rate and reduce 20% computing time (Printed Circuit Board (PCB) Industry) 


• Designed dispatching rules to solve mass production scheduling problem with huge size(30000+ jobs and 100+ machines) in 10 minutes. Implement divide and conquer algorithm to saved 80%+ computation time and meet 99% utilization (TFT-LCD Panels Industry)

Yafbmnex8a0jrkvjt4xe

Industrial Technology Research Institute (ITRI)(工業技術研究院, 工研院), Data Analyst & Optimization Analyst (1st year), Dec 2016 ~ Dec 2017

Intelligent Analytic Tech. Div - Data Analytic Tech. Dept 


 • Built a tree-based reinforcement learning optimization algorithm applying ensemble dispatching rules and Monte Carlo Tree Search (MCTS) to solve scheduling problems with huge size under short time constraints /* Patent ID : TWI633504 */ 


• Developed Intelligent Scheduling Technology to solve complicated combination problem and ensured projects were delivered on or ahead of schedule 

  - Set up the Tree-based Scheduling Algorithm to optimize the schedule problem under many constraints and achieve the required objective(min makespan/WIP/...) 

  - Built related module in scheduling problems such as batching process, mask transportation, preserving maintenance, out sourcing, reticle sharing, unexpected crash, machine setup and yield issue 


 • Developed an algorithm to analyze workload of manufacturing system by statistical theory and unsupervised clustering method

Yafbmnex8a0jrkvjt4xe

LMPMARKET PTE. LTD., Singapore, Partner and Optimization Analyst, Dec 2018 ~ 現在

• Building the programming solver to generate best supply strategy by considering elasticity of capacity between electricity spot market and power generator with long term contractual commitments. Work with Dr. Yen-Shong Chiao, Singapore
 • Maintaining programming model to ensure that current solver meets customer needs and constraints

Va3azqla37fie60whlzy

LMPMARKET PTE. LTD., Singapore, Optimization Analyst and Algorithm Programmer, May 2017 ~ Dec 2018

• Power Network Planning and Optimization

 - Built and modified the Linear Programming Model to represent a Electric Power Network System

 - Solved the problem and determine optimal electric power supply strategy based on known demand and capacity in Java(with Lingo Package)


• Searched for potential strategy to improve transporting strategy by sensitivity analysis and constraints relaxation

 - (Seller) Find best power transmission strategy to maximize revenue(at lowest transportation loss)

 - (Buyer) Find best transaction strategy to minimize cost(result from price differences of many power generators between different areas)

Va3azqla37fie60whlzy

Industrial Technology Research Institute (ITRI)(工業技術研究院, 工研院) Research Intern - Machine Learning Project, Mar 2015 ~ Dec 2015


• Built a unsupervised clustering model, including hierarchical algorithm(HA) and k-means clustering, to analysis complex time series of indicator, for example, PM10 and PM2.5 concentrations at Taiwan based on data from Taiwan Air Quality Monitoring Network

 

• Visualized the air quality data by statistical techniques and plot results in R language


• Compared the common machine learning algorithms, including support vector machine, neural network, decision tree, radon forest and so on in various data set in R language in order to realize the characteristic of each algorithm, and organized into technical documents


 • Built the simulation model about traffic system for the demonstration of application in data analytic in Java

Lqqphmgilafddf91vdr9

Cloud Farm, Product Manager, Jun 2012 ~ Jul 2014

Project planning, Web Database Development and Marketing  


• Design the MVC(Model–view–controller) architecture of system, and implement the database design and web programming

• Arranged harvesting schedule by considering the planting time, demand and due date of order. Responsible for daily logistics management and shipping

• In charge of sale and communicate with customers, acknowledging of orders and hold the customer complaints

• Lead a team of 8 people and successfully develop e-commerce and business model to expanse distribution channel of local agriculture, increasing 15% of retail revenue

• Analyze the planting process, transforming to manufacturing structure to build food traceability by ERP(Enterprise Resource Planning)

• Target and connect to potential customers who are likely to bulk order and help farmer pricing products, eventually winning the 5 cases of companies order with 200+ carton of agricultural products


Lqqphmgilafddf91vdr9

Publications

Conference Papers

  • Che-Ming Kuo, Heuristic Algorithm for Scheduling of Make-to-Order Plant Factory with Considering Crops Size Variation during Cultivation, Chinese Institute of Industrial Engineers Annual Conference(CIIE2015).
  • Kwei-Long Huang, Chao-Lung Yang, Che-Ming Kuo*(corresponding author) and Hao-Chen Weng, A Plant Factory Scheduling Research with Multi-Period Harvest, The 17th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2016).

Master's Thesis 
  • A Scheduling Research in Plant Factory with Considering Multi-Period Harvest, 2016

Patent
  • Tsung-Jung Hsieh, Sen-Chia Chang, Yao-Chung Hsu, Che-Ming Kuo, I-Hsuan Chung, Tree Search-Based Scheduling Method and An Apparatus Using the Same (TW I633504B)

學歷

National Taiwan University, 科學碩士(MS), Industrial Engineering, 2015 ~ 2016

Master Thesis : A Scheduling Research in Plant Factory with Considering Multi-Period Harvest 


This study focus on the crop-scheduling problem for a plant factory and consider the special property of crops which can be harvested multiple times. This scheduling problem is formulated as a mixed integer programming (MIP) problem. 


The objective function is defined as to find the maximum revenue for the plant factory under the consider of different practical condition including types of crops, cultivation room number, cultivation room space, heterogeneous harvesting amount among different environment of cultivation room and multiple harvesting period. 


This study develops a heuristic algorithm method(Lagrangian relaxation method) to solve scheduling problem in a large scale for searching a good solution(gap is less than 20%) in an effective way(reduce 90%+ computing time).

Cq44s6qe9viokbqtrtwp

National Taiwan University of Science and Technology, 科學碩士(MS), Industrial Management, 2014 ~ 2015

Attended, earning 20+ credits in manufacturing, artificial intelligence and algorithm field, and transfer to Nation Taiwan University to got an MS in Industrial Engineering.

If71y54ln23v2tmbmj6g

National Yunlin University of Science and Technology, 工學學士(BEng), Industrial Engineering and Management, 2010 ~ 2014

Graduating in the honor of the first lead.

Ptbcopit4trubchjwn6r