Hsinchu, Hsinchu City, Taiwan
Jun 2013 - Sep 2014
1. Tool installation :
Attend new site FAB ramping up progress , reduce installation time of new equipment , up to 10%
參與新廠擴建時裝機作業,團隊共同努力,縮短新機台釋出時程達 10%
Sep 2014 - Mar 2018
1. Cost reduction project :
Optimize photo-resist (PR) coating recipe to achieve chemical reduction purpose, up to 50% consuming per wafer .
優化光阻液塗佈製程配方,達到光阻劑減量,每片晶圓用量減少 50%
2. Process module evaluation :
Co-work with vendor, evaluate new type process module ( BST : Back Side Treatment brusher )
與開發廠商合作,評估新型態製程模組 ( BST brush )
3. New tech process module preset
Integrate and summary potential requirement , preset next generation spin module ( Coat & DEV module ), which exist contamination risk
總結潛在的需求,預置次世代 spin 模組,新世代光阻有汙染風險,需要特化污染防治層
Mar 2018 - To date
1. Tool sponsor :
Recover bypass units , raise availability 30%
Fine tune PR coating recipe , reduce poor coating rate 90%
Install digital gauge , complete monitoring system
提高機台模組妥善率 ( 輸出提升 30% ) ;
養護光阻液塗佈均勻度 ( 缺陷率降低 80% ) ;
安裝數位錶頭,完善機台參數監控系統
2. Tool matching :
Compare identical functional modules of different generation tool , summary relative merits
比較不同世代機型同樣功能的加工模組,總結相對優劣
3. New material installation
Control EUVL PR installation progress , accelerate new tech process evolution
新世代 EUVL 光阻安裝,加快 N3 / N2 世代黃光製程演進
在台積電的工作經歷,讓我學習如何判斷事情的輕重緩急
以最有效率的方式安排工作,來達到個人一天最大的產出。
提升問題解決能力,在眾多現象中精準快速找出問題並有效率解決。
與不同部門的合作中,學習到團隊合作和溝通協調能力,建立自己的價值贏得他人尊重。
高度壓力且工時長的工作中,提升抗壓性及保持樂觀和正面思考的態度。
Sep 2009 - Feb 2013
Sep 2001 - Jun 2005
Hsinchu, Hsinchu City, Taiwan
Jun 2013 - Sep 2014
1. Tool installation :
Attend new site FAB ramping up progress , reduce installation time of new equipment , up to 10%
參與新廠擴建時裝機作業,團隊共同努力,縮短新機台釋出時程達 10%
Sep 2014 - Mar 2018
1. Cost reduction project :
Optimize photo-resist (PR) coating recipe to achieve chemical reduction purpose, up to 50% consuming per wafer .
優化光阻液塗佈製程配方,達到光阻劑減量,每片晶圓用量減少 50%
2. Process module evaluation :
Co-work with vendor, evaluate new type process module ( BST : Back Side Treatment brusher )
與開發廠商合作,評估新型態製程模組 ( BST brush )
3. New tech process module preset
Integrate and summary potential requirement , preset next generation spin module ( Coat & DEV module ), which exist contamination risk
總結潛在的需求,預置次世代 spin 模組,新世代光阻有汙染風險,需要特化污染防治層
Mar 2018 - To date
1. Tool sponsor :
Recover bypass units , raise availability 30%
Fine tune PR coating recipe , reduce poor coating rate 90%
Install digital gauge , complete monitoring system
提高機台模組妥善率 ( 輸出提升 30% ) ;
養護光阻液塗佈均勻度 ( 缺陷率降低 80% ) ;
安裝數位錶頭,完善機台參數監控系統
2. Tool matching :
Compare identical functional modules of different generation tool , summary relative merits
比較不同世代機型同樣功能的加工模組,總結相對優劣
3. New material installation
Control EUVL PR installation progress , accelerate new tech process evolution
新世代 EUVL 光阻安裝,加快 N3 / N2 世代黃光製程演進
在台積電的工作經歷,讓我學習如何判斷事情的輕重緩急
以最有效率的方式安排工作,來達到個人一天最大的產出。
提升問題解決能力,在眾多現象中精準快速找出問題並有效率解決。
與不同部門的合作中,學習到團隊合作和溝通協調能力,建立自己的價值贏得他人尊重。
高度壓力且工時長的工作中,提升抗壓性及保持樂觀和正面思考的態度。
Sep 2009 - Feb 2013