CakeResume Talent Search

Advanced filters
On
4-6 years
6-10 years
10-15 years
More than 15 years
Avatar of 黃正文.
Avatar of 黃正文.
Golang Developer @Binance
2021 ~ Present
後端工程師
More than one year
service(ethereum). Skills  Programming Go Java SQL Shell Html5 CSS JavaScript JQeury React Database MsSQL PostgreSQL MySQL MongoDB Redis Tools Docker Kubernetes Nats Google Pub/Sub Grafana Prometheus Helm Kustomize Nginx Caddy Platform GCP AWS Linux Windows Version Control Git GitHub GitLab CI/CD Jenkins GitLab-CI Drone Github Actions IDE Visual Studio Code Eclipse Document Swagger Graphql Protobuf Language Chinese English Work Experience Binance, Golang Developer(Blockchain), June 2021 ~ Now Binance Smart Chain . - Code review. - CI/CD flow. - Bug fixing and feature development. - Monitor and maintain our running nodes. - Response
golang
Docker
RESTful WebServices
Employed
Full-time / Interested in working remotely
6-10 years
國立雲林科技大學
資訊管理系
Avatar of 李承恩 Blues.
Avatar of 李承恩 Blues.
DevOps Team Leader @海科科技有限公司
2022 ~ Present
DevOps 工程師
Within one month
6人小組) 三月九月 2021 後端工程師 一起資訊有限公司 擔任公司後端與DevOps職務: 1. K8S環境管理 2.各專案CI/CD撰寫(Gitlab、Drone) 3.輔助script撰寫(PHP、Python、Go) 4.維運既有服務 5.開發公司派發下來的project(PHP Laravel) 6.排除專案CI/CD上的任何問題 7.
Golang
Linux
Python
Employed
Not open to opportunities
Full-time / Interested in working remotely
6-10 years
台北海洋技術學院
電腦與通訊工程
Avatar of the user.
Avatar of the user.
Test Engineer @LINE TW
2019 ~ Present
資深測試工程師
Within two months
Test Planning
test case design
Regression Testing
Employed
Full-time / Interested in working remotely
6-10 years
The University of Sunderland
Computing&Computing Science
Avatar of the user.
Avatar of the user.
Backend Tech Lead @DeepHow
2021 ~ Present
Software Engineer / Backend Engineer
Within one month
Node.js
ASP.NET
C#
Employed
Not open to opportunities
Full-time / Interested in working remotely
6-10 years
靜宜大學
資訊管理學系
Avatar of the user.
Avatar of the user.
Past
PHP Backend Developer @Acora Solutions Sdn. Bhd.
2020 ~ 2020
Within six months
Nodejs
React.js
vue.js
Unemployed
Full-time / Interested in working remotely
6-10 years
National Donghwa University
Management Information System
Avatar of 楊懷新.
Avatar of 楊懷新.
Assistant Manager @Foxconn
2021 ~ Present
資深韌體工程師
Within one month
based on ambarella platform. Implemented PDM2PCM converter and low power consumption system development on STM32. Senior Firmware Engineer at Goertek Inc., Jul– Mar.2021 Job descriptions: Firmware architecture, live streaming solutions and custom development on 360° camera,360° camera calibration/stitch, IP camera systems development, drone operating System development, IQ test. Stack: OpenCV, OpenCL, C/C++, NuttX RTOS, Unix/Linux, Android JNI/HAL,FFmpeg. Tools: Visual Studio, Android Studio, Matlab, Unity 3D, Source Insight, Git, Makefile, Jupython, imatest. Accomplishment: Build up manufacturing test and optical/IQ
C/C++
Employed
Full-time / Interested in working remotely
6-10 years
National Taipei University of Technology
electrical and computer engineering
Avatar of 李翊賓.
Avatar of 李翊賓.
專案工程師 @宏碁股份有限公司 / 宏碁資訊服務股份有限公司
2017 ~ 2020
Front-End / Back-End / Full Stack Web Developer
Within one year
李翊賓 Li, Yi-Bin 5 years of experience in Full Stack Engineer. Participated in the development of several projects and served as the project technical leader. Strong passion for learning and love for communicating with people. [email protected] Skills Frontend Javascript React Next.js RxJS PixiJS Cypress Backend PHP Laravel Node.js MySQL Ops Nginx AWS Jenkins Drone CI Ansible Docker Packer Terraform Experience Frontend Engineer, SpaceAdvisor, 2020 / 6 ~ 2020/10, 5 mos Product: Teaches Online Courses Official Website: https://teaches.cc/
JavaScript
Node.js
Next.js
Employed
Not open to opportunities
Full-time / Remote Only
6-10 years
國立臺灣科技大學
資訊工程學系
Avatar of Roby Syuhada.
Offline
Avatar of Roby Syuhada.
Offline
Mine Planning Engineer @PT. Sulawesi Cahaya Mineral
2018 ~ Present
Mining / Mine Plan Engineer
Within one month
Roby Syuhada Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis. Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result. Proven record as mining project manager for project accomplishments and presenting to
Coal Mining
Nickel
Mine Planning
Full-time / Interested in working remotely
4-6 years
Institut Teknologi Bandung
Mining Engineering, Mine Environmental Management
Avatar of Slash.
Avatar of Slash.
Full-stack Engineer @Nexusguard
2015 ~ 2016
Front-end engineer
More than one year
honestbee, Front-end Lead, Jul 2017 ~ OctServer side rendering (SSR) - New delivery features - Payment features - Collaborate with Singapore and India teams - Performance, 1) code splitting. 2) dynamic loading - Testing 1) unit testing 2) end-to-end testing (puppeteer) - Refactoring Web performance, React.js, Redux, Jest, Puppeteer, Firebase, Webpack, Drone CI Nexusguard, Full-stack Engineer, May 2015 ~ MaySingle Page Application - Web App Security and Performance - Data Visualization - UX/UI - Host CI and CD server - Testing 1) unit testing 2) back-end APIs - Demo: http://slashtu.github.io/apps/appmonitor ­Monitoring web situation
JavaScript
React.js
Node.js
Full-time / Interested in working remotely
6-10 years
National Central University
Computer Science
Avatar of 廖昱程.
Avatar of 廖昱程.
Customer Engineer @iKala 愛卡拉互動媒體股份有限公司
2022 ~ Present
Within two months
NTD 1.5 million per month and reduce 20% customer complaints. •Worked with the management team to do market research, identify customer demand, product/solution landing, and finish 5 POC. •Responsible for ELK stack, back-end system, and pre-alert system for the new product. •Drove analysis data and visualize it for the dashboard and backstage management system for insight and impact. Covino Farms, Deputy Team Leader, Nov 2015 ~ Sep 2017 •Fixing the relationship with customers and ledmembers to finish daily orders. National Taichung University of Education, Research Assistant, May 2014 ~ Dec 2014
nlp machine learning
+python
AI & Machine Learning
Employed
Full-time
4-6 years
國立中央大學
認知與神經科學所

The Most Lightweight and Effective Recruiting Plan

Search resumes and take the initiative to contact job applicants for higher recruiting efficiency. The Choice of Hundreds of Companies.

  • Browse all search results
  • Unlimited access to start new conversations
  • Resumes accessible for only paid companies
  • View users’ email address & phone numbers
Search Tips
1
Search a precise keyword combination
senior backend php
If the number of the search result is not enough, you can remove the less important keywords
2
Use quotes to search for an exact phrase
"business development"
3
Use the minus sign to eliminate results containing certain words
UI designer -UX
Only public resumes are available with the free plan.
Upgrade to an advanced plan to view all search results including tens of thousands of resumes exclusive on CakeResume.

Definition of Reputation Credits

Technical Skills
Specialized knowledge and expertise within the profession (e.g. familiar with SEO and use of related tools).
Problem-Solving
Ability to identify, analyze, and prepare solutions to problems.
Adaptability
Ability to navigate unexpected situations; and keep up with shifting priorities, projects, clients, and technology.
Communication
Ability to convey information effectively and is willing to give and receive feedback.
Time Management
Ability to prioritize tasks based on importance; and have them completed within the assigned timeline.
Teamwork
Ability to work cooperatively, communicate effectively, and anticipate each other's demands, resulting in coordinated collective action.
Leadership
Ability to coach, guide, and inspire a team to achieve a shared goal or outcome effectively.
Within one month
Mine Planning Engineer
Logo of PT. Sulawesi Cahaya Mineral.
PT. Sulawesi Cahaya Mineral
2018 ~ Present
West Java, Indonesia
Professional Background
Current status
Job Search Progress
Professions
Other
Fields of Employment
Mining Metals
Work experience
4-6 years
Management
Skills
Coal Mining
Nickel
Mine Planning
General Management
Presentation Skills
Vulcan
Surpac
data analysis and dashboarding
Supply Chain Management
Drone Piloting
Project Management Skills
Languages
Job search preferences
Positions
Mining / Mine Plan Engineer
Job types
Full-time
Locations
Remote
Interested in working remotely
Freelance
Educations
School
Institut Teknologi Bandung
Major
Mining Engineering, Mine Environmental Management
Print
Iypr3kseyjjcmp3ifm4h

Roby Syuhada

Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis.
Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result.
Proven record as mining project manager for project accomplishments and presenting to BoD & Stakeholder.

Mining / Mine Plan Engineer

(+62)81222829625

Biola No. 8 Bandung, Jawa Barat, ID
[email protected]

Skill & Achievement


Mining

  1. Supervised 900k tpm delivery and coal quality assessed front to barge.
  2. Managed fleet match 25-PC2000 & 3-EX3500 with 140-HD785.
  3. Improved Pit-CPP haul cap. (22k to 25k tpd) with 6-Double Trailer Trial.
  4. Reduced 48-HD785+HD777 FBR (save 7% fuel) by ECO-Mode optimization.

Mine Plan

  1. Orchestrated nickel wet ore blending prod. (RKEF, Heap Leach, and HPAL) to optimize additional 2 million reserve.
  2. Implemented:
  • Open pit coal avg. SR 5:1 within 14Ha with crest-toe level 45m (LOM 4yr)
  • Open-cast nickel avg. SR 1.64:1 and COG Ni 1.6% within 1.24k Ha with crest- toe level 85m (LOM 12yr)

General Mgt. Ops.

  1. Reduced 2018 Q1-Q2 Incident Rate 11% by implementing Safety Accountability Program (SAP)
  2. Facilitated EHS Automation System Upgrade (RFID) with Auto Tracking + Clustering Data
  3. Implemented Radial Crusher Design Construction (CR-12) for coal blending variance (5-6 types) 
  4. Reduced 3s of barge mooring time by implementing dredge operation.

Exploration

  1. Led 1 unit Jackro 175 drilling ops. in 2 months resulting 800k ton coal resources with GAR 3300-3500 (Balikpapan formation).
  2. Led 2 unit Jackro 175 drilling ops. in 3 weeks resulting 150k ton coal resources with GAR 4400-4900 (Pulaubalang formation).

Software & Device

  1. Mining Design (Vulcan 8, Surpac 6.4.1, Datamine Studio 3, Minex 6.3, Minescape 5.7)
  2. Mapping & Geotechnical (GPS, Surfer 13, Global Mapper, Slide, Rocfall)
  3. Data Analytics & Presentation (Excel Pivot + Visual Basic, PPT Thinkcell, Project Gantt Chart, Visio Flowchart)
  4. Drafting & Design (CAD Civil 3D, SketchUp)
  5. Video (AdPremiere + DJI Phantom 4)

Marketing & Language

  1. Obtained off-takers agreement with coal trader/buyer (Glencore, Far East, Nobel, and HMS Bergbau Indonesia).
  2. Obtained a discounted fee sample analysis (10%) with Geoservices Lab.
  3. Obtained a discounted price (10%) and 2-stage term of payment instead of full payment in advance with Coates Service & Valfrol Dewatering.
  4. Advanced proficient in English Business Conversation (iBT 87), native in Bahasa

Projects

Projects 01 00@2x

Spearheaded ECO Mode research by experiencing it directly on operator cabin (HD785 / CAT 777) by:

1. Utilize ECO Mode, evaluate Modular data bank, and optimize ECO Mode (Komatsu/CAT)

2. Fuel Efficiency results: 7-11% lesser FBR (lt/hr) with minimum usage 60% ECO Mode.

Projects 01 01@2x

Facilitated EHS and Compliance System Upgrade by:

1. Integrating technology RFID, cloud database, and on-site personnel activity (inspection-investigation etc.)

2. EHS Automation results: Comprehensive Site-to-HQ Live EHS Data for deep analytical of preventive incident presented with interactive (custom design).

Projects 01 02@2x

Generated opportunity of new marketing products with:

1. Implementing Radial Stacker Crusher Design (CR-12) to prepare 5-6 coal qualities blending

2. Total project value approx. $3million.

Work Experience

PT. Sulawesi Cahaya Mineral, Mine Planning Engineer
Dec 2018 ~ Present

Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator

• Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown.
• Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration.
• Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Syjloebslimusj5clrpp

PT Indo Mining Services, Mining Project Manager
Jun 2018 ~ Dec 2018

Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Verbal and Written Communication Skills

• Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation).
• Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review.
• Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner).
• Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Cryrmebhq2xfijyvpnba

PT Berau Coal, Mining Engineering and General Management Operation Jul 2016 ~ Jun 2018

Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator

• Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director.
• Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge.
• Managing lead 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785.
• Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied.
• Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Hwj3d7qvcg5bxg7jgdev

PT Rokatera Prima Minera, Mining Geology and Planning Engineer

Oct 2014 ~ Jul 2016

Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience

• Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown.
• Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources.
• Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Dalgadzlkerbgilyau1g

PT LAPI ITB, Mining Environment Researcher
Oct 2013 ~ Oct 2014

Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by:

• Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis.
• Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.
Peydqgvkusldmnezdkt2

Education

Institut Teknologi Bandung, Master of Science (MS), Mining Engineering & Mine Environmental Management, 2013 ~ 2014

• 1 year fast track graduate program with full ITB Dean Scholarship focusing on Mine Environmental Mgt. Engineering (Geochemist & Mine Reclamation).
• Thesis project in open pit coal PT Bukit Asam to predict ARD/AMD potential by characterizing Cubical-Framboidal Pyrite in order.
• AJ-BCEP Student Exchange with a participant from ASEAN and Japan University Student with 3 campuses visited:
a. Institut Teknologi Bandung, Laboratorium visit, and Pongkor Underground Gold Mine, Bogor-Indonesia
b. Chulalongkorn University and Gypsum Open Pit Mine, Thailand
c. Kyushu University, laboratorium visit, and CINEST Resources Symposium Speaker in Kyushu-Japan
• 2013 CINEST Earth Resources Symposium Speaker in Kyushu-Japan, about Vein Deposit Gold Exploration report.
Jkere2ucmqecoztkpb8y

Institut Teknologi Bandung, Bachelor of Science (BS), Mining Engineering & Mining & Oil Exploration, 2009 ~ 2013

• 4 year undergraduate program with 2 years ITB Dean Scholarship focusing on Mining Engineering (Coal and Mineral Exploration, Planning, and Operation).
• Thesis project in creating a quantitative table of Resource-Reserve Conservation Evaluation by: a. Converting Indonesia Mineral and Energy Ministry Regulation into a quantitative table. b. Assessing exploratory documents and annual production - financial reports from 4 major mining corporate (Newmont Copper & Gold, KBK Gold, NHM Copper & Iron Ore) as a subject to evaluate.


• Field Leader of ITB Mining Student Orientation.
• Head of Logistics and Documentation Division of ITB President Election.
• Facilitator of ITB Oil-Gas-Mining Professional Discussion.
Bx1qzb8ghug2zifldddf
Resume
Profile
Iypr3kseyjjcmp3ifm4h

Roby Syuhada

Master of Science (M.Sc.) in Mining Engineering with 5+ working experiences in Indonesia Coal and Nickel Mining Industries that Passionate in Mine Design plus Vulcan9, Minex6.4, Surpac6.6 scheduling software proficiency, and Business Development of mine-to-port operational performance Tableau analysis.
Expert in data mining and scientist using Pivot + Visual Basic Excel, transforming into an interactive PowerPoint Think Cell + Tableau dashboard with a Gantt chart MS Project plan to deliver a quick-win result.
Proven record as mining project manager for project accomplishments and presenting to BoD & Stakeholder.

Mining / Mine Plan Engineer

(+62)81222829625

Biola No. 8 Bandung, Jawa Barat, ID
[email protected]

Skill & Achievement


Mining

  1. Supervised 900k tpm delivery and coal quality assessed front to barge.
  2. Managed fleet match 25-PC2000 & 3-EX3500 with 140-HD785.
  3. Improved Pit-CPP haul cap. (22k to 25k tpd) with 6-Double Trailer Trial.
  4. Reduced 48-HD785+HD777 FBR (save 7% fuel) by ECO-Mode optimization.

Mine Plan

  1. Orchestrated nickel wet ore blending prod. (RKEF, Heap Leach, and HPAL) to optimize additional 2 million reserve.
  2. Implemented:
  • Open pit coal avg. SR 5:1 within 14Ha with crest-toe level 45m (LOM 4yr)
  • Open-cast nickel avg. SR 1.64:1 and COG Ni 1.6% within 1.24k Ha with crest- toe level 85m (LOM 12yr)

General Mgt. Ops.

  1. Reduced 2018 Q1-Q2 Incident Rate 11% by implementing Safety Accountability Program (SAP)
  2. Facilitated EHS Automation System Upgrade (RFID) with Auto Tracking + Clustering Data
  3. Implemented Radial Crusher Design Construction (CR-12) for coal blending variance (5-6 types) 
  4. Reduced 3s of barge mooring time by implementing dredge operation.

Exploration

  1. Led 1 unit Jackro 175 drilling ops. in 2 months resulting 800k ton coal resources with GAR 3300-3500 (Balikpapan formation).
  2. Led 2 unit Jackro 175 drilling ops. in 3 weeks resulting 150k ton coal resources with GAR 4400-4900 (Pulaubalang formation).

Software & Device

  1. Mining Design (Vulcan 8, Surpac 6.4.1, Datamine Studio 3, Minex 6.3, Minescape 5.7)
  2. Mapping & Geotechnical (GPS, Surfer 13, Global Mapper, Slide, Rocfall)
  3. Data Analytics & Presentation (Excel Pivot + Visual Basic, PPT Thinkcell, Project Gantt Chart, Visio Flowchart)
  4. Drafting & Design (CAD Civil 3D, SketchUp)
  5. Video (AdPremiere + DJI Phantom 4)

Marketing & Language

  1. Obtained off-takers agreement with coal trader/buyer (Glencore, Far East, Nobel, and HMS Bergbau Indonesia).
  2. Obtained a discounted fee sample analysis (10%) with Geoservices Lab.
  3. Obtained a discounted price (10%) and 2-stage term of payment instead of full payment in advance with Coates Service & Valfrol Dewatering.
  4. Advanced proficient in English Business Conversation (iBT 87), native in Bahasa

Projects

Projects 01 00@2x

Spearheaded ECO Mode research by experiencing it directly on operator cabin (HD785 / CAT 777) by:

1. Utilize ECO Mode, evaluate Modular data bank, and optimize ECO Mode (Komatsu/CAT)

2. Fuel Efficiency results: 7-11% lesser FBR (lt/hr) with minimum usage 60% ECO Mode.

Projects 01 01@2x

Facilitated EHS and Compliance System Upgrade by:

1. Integrating technology RFID, cloud database, and on-site personnel activity (inspection-investigation etc.)

2. EHS Automation results: Comprehensive Site-to-HQ Live EHS Data for deep analytical of preventive incident presented with interactive (custom design).

Projects 01 02@2x

Generated opportunity of new marketing products with:

1. Implementing Radial Stacker Crusher Design (CR-12) to prepare 5-6 coal qualities blending

2. Total project value approx. $3million.

Work Experience

PT. Sulawesi Cahaya Mineral, Mine Planning Engineer
Dec 2018 ~ Present

Skills: Development Design |Mine Technical Services Project |Mine Planning and Sequencing |Reserve Optimising |Process Development |Self Initiator and Innovator

• Developed Life of Mine for 12 years production (total 38million mineable reserve in 318Ha) using Vulcan9 software for Yearly to 3MRP schedule breakdown.
• Boosted 18% ore mine recovery (additional 6 million minable nickel ore) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Cut 1.6 km MHR Design from existing road design (total 15 km) and develop all supporting infrastructure using Surpac6.6 and Civil 3D AutoCAD with Infrastructure and Production Engineering team collaboration.
• Develop daily to monthly technical production (PA-UA-MA) evaluation integrated with fuel usage and working hour to monitor budget usage per location compared to monthly production.
Syjloebslimusj5clrpp

PT Indo Mining Services, Mining Project Manager
Jun 2018 ~ Dec 2018

Skills: Project and Stakeholder Management |Team Leadership |Mine Development Plan |Project Costing Analysis |Resource Management |Excellent Verbal and Written Communication Skills

• Succeed to deliver all milestone project 1 month ahead of the schedule (projects worth $1.95million) with 7% budget saving (Operational-Commercial-Accommodation).
• Managing lead 50k coal ton per month operation with weekly operation contractor coordination including HSE safety procedures compliance review.
• Develop weekly inspection - observation plans with HSEC contractor team as a safety operation mentor to develop safety awareness for the operator (front liner).
• Obtained discounted 10% Geoservices coal analysis fee and competitive coal off-takers agreement with HMS Bergbau, Far East, and Nobel by negotiation and tender.
Cryrmebhq2xfijyvpnba

PT Berau Coal, Mining Engineering and General Management Operation Jul 2016 ~ Jun 2018

Skills: Root Cause Analysis and Problem Solving |Supervisory Experience |Work Autonomously and Innovator |Shareholder Presentation |Collaborative Multi-Disciplinary |Cost Estimates and KPI Generator

• Saved 7% fuel usage in 3 months by spearheading ECO Mode optimising in total 48 unit Komatsu HD and reporting to Operational Director.
• Boosted 13% coal haul capacity by supervising 6 Double Trailer trial for consistent delivery 900k ton per month coal to port coal barge.
• Managing lead 30k ton coal daily operation by evaluating coal forecasts and hauling sequence with Dispatcher of 25 PC2000, 3 EX3500 matched with 140 HD 785.
• Generated contractors KPI evaluation table based on the commercial parameter for production and safety quarter performance with penalty-award applied.
• Succeed to propose 2 milestone projects and budgetary approved by BoD (total worth $6.5million) related to Radial Stacker Coal Crusher and HSE Automation (RFID utilized) project.
Hwj3d7qvcg5bxg7jgdev

PT Rokatera Prima Minera, Mining Geology and Planning Engineer

Oct 2014 ~ Jul 2016

Skills: Consultants Engineering and Client Presentation |Reserve Optimising |Feasibility Studies Reporting | Technical Services Report |Team Oriented |Supervisory Experience

• Develop Life of Mine including feasibility study report for 5 years production (total 1.9 million mineable coal reserve in 18Ha) using Minex 6.4 software for Yearly to 3MRP schedule breakdown.
• Boosted 18.5% coal mine recovery (additional 300k minable coal) with geology modelling resources reconciliation by re-sloping UPL bench geometry based on Geotechnical Consultant Study.
• Led and motivated 2 months of 1Jackro175 exploration drilling team to get an additional 800k ton coal resources and build coal body using Minex 6.4 to obtain 2.5 million measured resources.
• Consistent 40k ton coal operation by supervising 4PC600 matched with 8ADT740 using coal forecasts and quality memo (coal quality notes with actual picture sample).
Dalgadzlkerbgilyau1g

PT LAPI ITB, Mining Environment Researcher
Oct 2013 ~ Oct 2014

Skills: Open Surface Pit |Rock Sampling |Statistical Analysis |Database Management |Attention To Detail Spearheaded Acid Rock/Mine Drainage (ARD/AMR) research in big coal open pit by:

• Conducting five tests (Static, Kinetic, XRD, XRF, and Microscope Mineral) to characterize pyrite specifications and its genesis.
• Simulated pyrite dispersion pattern in coal mine pit with organic and an-organic sulfur content as a back analysis of coal basin genesis.
Peydqgvkusldmnezdkt2

Education

Institut Teknologi Bandung, Master of Science (MS), Mining Engineering & Mine Environmental Management, 2013 ~ 2014

• 1 year fast track graduate program with full ITB Dean Scholarship focusing on Mine Environmental Mgt. Engineering (Geochemist & Mine Reclamation).
• Thesis project in open pit coal PT Bukit Asam to predict ARD/AMD potential by characterizing Cubical-Framboidal Pyrite in order.
• AJ-BCEP Student Exchange with a participant from ASEAN and Japan University Student with 3 campuses visited:
a. Institut Teknologi Bandung, Laboratorium visit, and Pongkor Underground Gold Mine, Bogor-Indonesia
b. Chulalongkorn University and Gypsum Open Pit Mine, Thailand
c. Kyushu University, laboratorium visit, and CINEST Resources Symposium Speaker in Kyushu-Japan
• 2013 CINEST Earth Resources Symposium Speaker in Kyushu-Japan, about Vein Deposit Gold Exploration report.
Jkere2ucmqecoztkpb8y

Institut Teknologi Bandung, Bachelor of Science (BS), Mining Engineering & Mining & Oil Exploration, 2009 ~ 2013

• 4 year undergraduate program with 2 years ITB Dean Scholarship focusing on Mining Engineering (Coal and Mineral Exploration, Planning, and Operation).
• Thesis project in creating a quantitative table of Resource-Reserve Conservation Evaluation by: a. Converting Indonesia Mineral and Energy Ministry Regulation into a quantitative table. b. Assessing exploratory documents and annual production - financial reports from 4 major mining corporate (Newmont Copper & Gold, KBK Gold, NHM Copper & Iron Ore) as a subject to evaluate.


• Field Leader of ITB Mining Student Orientation.
• Head of Logistics and Documentation Division of ITB President Election.
• Facilitator of ITB Oil-Gas-Mining Professional Discussion.
Bx1qzb8ghug2zifldddf