Avatar of Noorullah.
Noorullah
Senior Project Engineer
Profil
Postingan
0Koneksi
Cetak
Avatar of the user.

Noorullah

Senior Project Engineer
Professional Synopsis : A competent Project engineer with 12 yrs. of a comprehensive knowledge of designing, developing and maintaining HV/MV substation projects, VSD, Motors and components to comply specifications, focusing on economy, safety, reliability, quality and sustainability. A consistent track record of successfully completing projects from the concept and detail of the design through to implementation, testing and handover. Seeking career enrichment opportunities in the areas of Project Management & LEED with a reputed organization.
Al Shafar Engineering LLC, Dubai, UAE
Anna University
United Arab Emirates

Latar Belakang Profesional

  • Status sekarang
  • Profesi
    Project / Product Management
  • Bidang
    Energi
  • Pengalaman Kerja
    10-15 tahun
  • Management
  • Skil
    Work Independently
    Managing
    Project Management
    Transmission Systems
    ETAP
    Automation
    Substation Design
    Site Management
  • Bahasa
    English
    Bahasa ibu atau Bilingual
    Urdu
    Bahasa ibu atau Bilingual
    Tamil
    Bahasa ibu atau Bilingual
    Hindi
    Fasih
  • Pendidikan tertinggi
    Sarjana

Preferensi pencarian kerja

  • Jenis pekerjaan yang diinginkan
    Full-time
    Tertarik bekerja jarak jauh
  • Jabatan pekerjaan yang diinginkan
    Senior Project Engineer
  • Lokasi pekerjaan yang diinginkan
    India
    Australia
    New Zealand
    Canada
  • Bekerja lepas

Pengalaman Kerja

Senior Project Engineer

02/2017 - Sekarang
#Led a design team (Site and Workshop) for design, engineering, workshop setup, site installation and commissioning of maintenance support systems #Performed integration, validation and commissioning of control systems #Supervised and provided design data, prepared QA documents, and Test plans for FAT and SAT #Supported and liaised with the Integration/Validation team #Managed the projects and delivered within allocated budget and time #Provided Technical Proposal and Cost Breakdown List base on site visit for upgrading client system #Provided technical support to other teams, redesign, check and review drawing, technical specification, NCR and technical query #Established strong relationships between client representative and local manufacturing team to achieve project assigned milestones. #Supported Sales team by configuring solutions, scope of work & supply, develop bids and technical proposals and also helped project management team with resource allocation, product realization, fulfillment, and receipt of payment #Assisted project manager in controlling and monitoring of project status within time, budget and quality #Handled the tasks of building and sustaining long-term partnerships with key stakeholders #Led the interface between suppliers and client during product development including design & technical collaboration at all stages #Responsible for checking materials including material costs and adequate supply source

Senior Electrical Engineer

11/2015 - 11/2016
1 yr 1 mo
#Led an engineering team for Redesign, Procurement, Construction, FAT, commissioning and SAT of new Excitation Systems #Led engineering teams for several projects included onsite service and repair works #Evaluating the budget , managed cash flow and timeframe during the project #Regularly checked all engineering & construction activities to perform according to project specification #Performed inspection on manufactured parts and providing technical support to project and test team

Senior Project Engineer

11/2006 - 10/2015
9 yrs 0 mos
- Preparing the CT/VT and Relay setting calculation (ETAP) for ABB, SIEMENS & AREVA. - Preparing the DC system, Earthing (CYMGRID), Lighting (RELUX ), Lightning calculation. - Preparing the HV & MV SLD, Power System analysis study (load flow & short circuit). - Preparing the Protection logic diagram & interlock logic, I/O signal list for the SCADA system. - Reviewing the HV/MV Schematic Diagrams of GIS, VSD and protection panels - Preparing the cable laying and termination schedule with BOQ. - Technical clarification with suppliers / vendors to provide better solution. - Heat Dissipation Load calculation for HVAC system - Preparing the Equipment Layout, Cable route layout and Support Structure layout.

Edukasi

Bachelor of Engineering (BEng)
B.E Electrical & Electronic Engineering
2002 - 2006