2021年9月 - 現在
• Arrange assembly input for demand under considering in materials and capacity restrictions
• Tracking in-line WIP for customer shipping request in time, achieve rate 100% since taking over
• Set up capacity model for special machine to negotiate with production line
• Write excelVBA to reduce routine jobs time, the highest by 80%
• Build machine flexibility checking model for all of products