Avatar of Andrew Clement.
Andrew Clement
General Foreman
Profile
Reputation Credits0

Posts
0Connections
列印
Avatar of the user.

Andrew Clement

General Foreman
Experienced Electrical Superintendent with a demonstrated history of working in the construction industry. Skilled in Electrical Safety, Electrical Wiring, Management, Business Process Improvement, and Troubleshooting. Knowledge in labor unit tracking, estimating, change orders, and proposal writing.
EC Electric
Kennewick, Washington, USA

职场能力评价

专业背景

  • 目前状态
  • 专业
  • 产业
  • 工作年资
  • 管理经历
  • 最高学历

求职偏好

  • 预期工作模式
  • 希望获得的职位
    General Foreman
  • 期望的工作地点
  • 接案服务

工作经验

General Foreman

2019年6月 - 现在
Boardman, OR New construction of PDX64 data center. Worked on shell power, office construction, and data gallery design and construction. Laid out up to 3 crews at a time in the mechanical space, gallery space, and fire alarm design. Manage red line drawings between foreman for turnover to the client. Manage workflow in the field to meet deadlines established by the client. Managed material handlers to allow for Journeyman and Apprentices to stay on the tools to increase productivity.

General Foreman

2019年3月 - 2019年4月
2 个月
Hermiston, OR Industrial construction of a new Lamb Weston Potato french fry factory. Located in Hermiston, OR. Managed raw receiving and raw grading portion of the plant. Planned work for multiple crews, ordered material, utilized prefabrication practices to decrease man hours as well as speed up this fast paced project. Prioritized construction activities to assist commissioning in finishing their milestones on time and ahead of schedule. Worked directly with commissioning agents in the field to identify and resolve any issues as they came up on a daily basis. Was responsible for approximately 40 electricians for the duration of the project.

Electrical Superintendent/Project Manager

2018年1月 - 2019年3月
1 年 3 个月
Wallula, WA Plan review, project planning and execution of multiple projects in Washington and Oregon Worked through bidding project using Accubid software, setting up project controls, planning and implementing cost tracking and unit tracking for each project through the use of Spectrum Construction Management Software . Daily reports submitted to client through e-sub as well as daily cost - tracking, daily unit-tracking, and percent complete. Paper Machine Upgrade Approx 15 million electrical scope. Upgrade of new 15kV and 5kV distribution at the plant. New controls scheme to integrate with existing DCS controls. Multiple new skids planned out and wired in per owners specification. Met project deadline with several days to spare over a time period. Planning work for multiple crews, preparing detailed schedule with milestones, and managing daily crew production goals. Met with owner two times per day to go over what was accomplished and what tasks were remaining.

Electrical Start-up Engineer

2016年9月 - 2017年3月
7 个月
Toledo, Oh Provide electrical commissioning support for the 800MW 2+1 natural gas plant in Oregon, OH for Oregon Clean Energy Included testing all in coming switch - gear, directing an electrical commissioning crew of electricians, and keeping detailed test records for turn-over packages for the owner. Was responsible for accepting or rejecting work packages from construction once they were complete. Manged work flow for prioritization to get unit on turning gear to allow for additional commissioning activities till and make schedule. Was responsible for approximately 25 Electricians between two crews working on either turbine or supporting systems throughout the project.

General Foreman

2016年1月 - 2016年9月
9 个月
Black & Veatch Approximately 20 million in electrical work. Created work packages for crews to work off of to go through and check systems that were initially signed off but never checked out by previous contractor. Provided support and received directive from Black & Veatch Commissioning engineers as well as MHI commissioning technicians to test equipment that was on site. Worked with PGE techs to transfer over systems as they were completed so that the owner could begin to operate systems as they were completed. Additionally, had a 3 crews of I and C technicians to support the start-up activities and worked to get the combined cycle plant online before the required due date. Managed a crew size of approximately 50 Electricians as well as 20 I and C Electricians and Pipe Fitters

Journeyman Electrician

2015年9月 - 2015年12月
4 个月
Boardman, Oregon Start-up and commissioning for the Carty power plant for PGE Worked on the initial start-up and commissioning crew taking directives from the Abengoa Commissioning Lead Responsible for doing pre-startup work such as testing transformers, meggering MCCs, testing DCS wiring, and working with the Lead to fix any issues that arose.

Journeyman Inside

2010年1月 - 2015年12月
6 年 0 个月
Business Administration, Business Administration and Management, General 2005 - 2007 Tri-Tech

Journeyman Electrician

2015年8月 - 2015年9月
2 个月
Elgin, Oregon Boise Saw Mill shutdown for an expansion of a new conveyor system. Installation of multiple racks of conduit, control wiring, and low voltage terminations.

Journeyman Electrician

2014年12月 - 2015年8月
9 个月
Boardman, OR Installation and commissioning of commercial power distribution systems, backup power systems, power bus distribution, and shell power systems. Troubleshooting exisiting systems, high/low voltage terminations, control system installation/testing, and network infrastructure.

Electrical Apprentice

2014年12月 - 2014年12月
1 个月
Hermiston, OR Good Shepard Hospital expansion, Con Agra expansion, and Residential circuitry work.

Electrical Apprentice

2014年9月 - 2014年11月
3 个月
Boardman, OR New substation for the Port of Morrow Installation of DC/AC control system, troubleshooting start-up of equipment, and underground installation of raceways for control systems

Electrical Apprentice

2014年9月 - 2014年10月
2 个月
Project was the WSU Wine Center in Richland, WA

Electrical Apprentice

2014年6月 - 2014年9月
4 个月
Hermiston, OR Installation of raceways for new PLC systems for a dryer expansion. Integration of new control system to existing control system, termination of PLC cabinets, and installation of multiplw sensors around the entire system.

Electrical Apprentice

2013年7月 - 2014年6月
1 年 0 个月
Boardman, OR Project was the Grimmway Farms new facility in Pasco, WA Installed conduit systems, pulled wire and terminated low voltage motors. Project was the Tillamook expansion in Boardman, OR Installed coated PVC conduit up through 3, wired PLC systems throughout the new plant, pulled/terminated fiber optic cable and assisted in integrating it to the existing plant. Project was the Con Agra Line 5 Expansion in Boardman, OR Installed stainless steel conduit up through 3, pulled and terminated PLC systems, integrated new and existing communication systems between buildings. Helped create the as-built/red-line drawings for raw processing/raw sizing.

Electrical Apprentice

2013年6月 - 2013年7月
2 个月
Projects were various residential retrofit and new installations throughout the Tri-Cities, WA area.

Electrical Apprentice

2013年1月 - 2013年6月
6 个月
Hanford, WA Project was the Vitrification Plant at Hanford Worked on multiple work packages throughout the entire facility under multiple Journeyman, Foreman, and General Foreman

Electrical Apprentice

2012年9月 - 2013年1月
5 个月
Prineville, OR Facebook Data Center Terminated transformers, troubleshooting new and existing installations, setting up and maintaining temporary power throughout the job.

Electrical Apprentice

2011年1月 - 2012年8月
1 年 8 个月
Irrigon, OR Projects included large pump stations for farmers. Wiring controls, transformers, running conduit, troubleshooting existing installations were part of the daily routine. Notable project was the update at the Williams Gas Plant with control terminations, confined spaces, and hazardous work environment.

Electrical Apprentice

2010年7月 - 2011年1月
7 个月

Systems Integration Specialist

2008年7月 - 2010年8月
2 年 2 个月
Kennewick, Washington Design and integration of audio, video, and automation systems for commercial and industrial buildings.

General Studies

2000年1月 - 2004年12月
5 年 0 个月

学历

尚无内容。