CakeResume Talent Search

Advanced filters
On
4-6 years
6-10 years
10-15 years
More than 15 years
Avatar of 傅貞瑗.
Avatar of 傅貞瑗.
Past
國文授課講師 @家庭教師
2020 ~ 2024
牙醫助理
Within one month
月九月 2015 報帳系統的管理、工讀生排班分派配、展場布置,團隊一度有十多人,所有人的績效皆由我考核,教育訓練皆我完成,主任卸任時,也希望我能離職,當她的私立助理。 學歷國立成功大學 National Cheng Kung University 中國文學 技能 Word C/C++ Python PowerPoint 語言 English — 進階
Word
C/C++
Python
Unemployed
Ready to interview
Full-time / Interested in working remotely
6-10 years
國立成功大學 National Cheng Kung University
中國文學
Avatar of 曾洪浩.
Avatar of 曾洪浩.
Past
設備工程師 @TSMC 台積電
2018 ~ 2024
工程師
Within one month
良好運作。 解決設備故障,降低生產停機時間。 改進和優化製程,提高效率和產品品質。 記錄和報告設備狀態和製程改進。 學歷National Cheng Kung University (NCKU), Taiwan 國立成功大學 微電子工程研究所 ◎ 碩士論文:以水熱法製備氧化鎳奈米片及其於延伸式閘極場效電晶體
Word
PowerPoint
Excel
Unemployed
Ready to interview
Full-time / Interested in working remotely
4-6 years
National Cheng Kung University (NCKU), Taiwan 國立成功大學
微電子工程
Avatar of 涂家禎.
Avatar of 涂家禎.
Past
Marketing Manager & Project Lead @MNA, The Management of New Arts. 牛耳藝術
2022 ~ 2024
PM/產品經理/專案管理/行銷營運企劃
Within one month
campaigns, encompassing social posts, press releases, and short video scripts. Planned and executed marketing campaigns include Yo-Yo Ma’s 36 cities Bach Project, La La Land in Concert, and the Harry Potter Film Series in Concert. 學歷 SepSepUniversity of Leeds Advertising and Marketing, Master SepJune 2017 National Cheng Kung University Foreign Language and literature, Bachelor 32 Beethoven Sonatas Campaign I led a campaign to promote a series of seven concerts, previously struggling with low ticket sales. Through strategic initiatives including the creation of an engaging event webpage, collaboration with designers for unique visual branding, and
IELTS
Google Analytics
Communication
Unemployed
Ready to interview
Full-time / Interested in working remotely
4-6 years
University of Leeds, United Kingdom
Advertising and Marketing
Avatar of the user.
Avatar of the user.
senior software engineer/ tenical pm @CYTENA BPS
2021 ~ Present
後端工程師
Within one month
MySQL
Microservices
MongoDB
Employed
Ready to interview
Full-time / Interested in working remotely
6-10 years
國立台灣大學 (National Taiwan University, NTU)
Electronic engineering
Avatar of the user.
Avatar of the user.
Past
資深工程師 @Velodash Inc.
2019 ~ 2023
Android / Flutter / Backend
Within one month
Android
kotlin
JAVA
Unemployed
Ready to interview
Full-time / Interested in working remotely
6-10 years
國立成功大學
資訊工程學系
Avatar of Ray Chen.
Avatar of Ray Chen.
Executive Assistant @CAULY powered by FutureStreamNetworks
2023 ~ Present
企劃經理、國際合作經理、資深產品經理、資深專案經理、行銷經理
Within one month
異業合作和廣告投放增加單月營收提升35%。 藉由與百位KOL及影響力社團合作成功提升業績22%。 協助洽談臺灣經銷商並完成大宗貿易,促進品牌的市場擴張和收入增長。 成果與效能 建立日常營運營表板並確保組織異動團隊成員仍能維持績效
Microsoft Office
Communication
Photoshop
Employed
Ready to interview
Full-time / Interested in working remotely
10-15 years
Shanghai Jiao Tong University
Avatar of 黃天心.
Avatar of 黃天心.
前端網頁設計師 @首岳資訊網路股份有限公司
2022 ~ Present
前端工程師、網頁設計師、平面視覺設計師、多媒體設計師、展覽規劃設計人員
Within one month
需求目標。 曾任於科博館擔任特展總策畫之一,與成員組織研究、廠商、教育三大不同體系,透過團隊合作、溝通與協調,共同完成大型博物館光影互動展覽。 平時也追求自我能力的提升,透過網路資源和補習加強前端工程能力,如增強JavaScript技術和熟悉
Word
PowerPoint
Excel
Employed
Ready to interview
Full-time / Interested in working remotely
6-10 years
國立臺中科技大學
光影互動, 感性研究, 多媒體設計
Avatar of the user.
Avatar of the user.
Android 軟體工程師 @Lafresh益欣資訊
2019 ~ Present
Android App Developer
Within one month
Android Development
IOS Development
Java
Employed
Ready to interview
Full-time / Interested in working remotely
6-10 years
國立成功大學
工程科學所(在讀)
Avatar of 梁賦康 (Foo-Hong, Leong).
Avatar of 梁賦康 (Foo-Hong, Leong).
Product Manager @東元電機股份有限公司 (TECO Electric & Machinery Co. Ltd.)
2023 ~ 2023
Data Scientist, Data Analyst, Machine Learning Engineer
Within one month
梁賦康 (Foo-Hong, Leong) Taoyuan City, Taiwan Email: [email protected] Tel:Skills • Languages: Python • DataBases: MySQL, SQLite • Infrastructure tools: Github • Machine learning libraries: TensorFlow, Keras, and Scikit-learn • Data visualization tools: Power BI, Seaborn and Matplotlib • Deployment: Streamlit Summary I have been working in Motor Manufacturing Industry for 8 years. My first programming was going to my Bachelor's degree, C++ was the first program I learned. Then I started to learn Python in 2018 at TEDU and my first project was the Stock Trend Prediction by CNN. I kept
Python
Power BI
Data Analytics
Employed
Ready to interview
Full-time / Interested in working remotely
6-10 years
國立成功大學 National Cheng Kung University
Mechanical Engineering
Avatar of 張正誼.
Avatar of 張正誼.
Pre-Sales @遠傳電信股份有限公司
2022 ~ Present
交通工程師/專案經理/產品經理
Within one month
過自駕車虛擬場域建置、微觀車流模擬、交通特性分析、交通影響評估、交通工程改善及時制重整等工作。 學歷國立台灣大學 National Taiwan University 土木工程系交通工程組國立成功大學 National Cheng Kung University 交通管理科學系 技能 Microsoft Office AutoCAD ArcGIS Tableau VISSIM Synchro THCS 交通工程與管理 運輸規
Microsoft Office
AutoCAD
ArcGIS
Employed
Ready to interview
Full-time / Interested in working remotely
6-10 years
國立台灣大學 National Taiwan University
土木工程系交通工程組

The Most Lightweight and Effective Recruiting Plan

Search resumes and take the initiative to contact job applicants for higher recruiting efficiency. The Choice of Hundreds of Companies.

  • Browse all search results
  • Unlimited access to start new conversations
  • Resumes accessible for only paid companies
  • View users’ email address & phone numbers
Search Tips
1
Search a precise keyword combination
senior backend php
If the number of the search result is not enough, you can remove the less important keywords
2
Use quotes to search for an exact phrase
"business development"
3
Use the minus sign to eliminate results containing certain words
UI designer -UX
Only public resumes are available with the free plan.
Upgrade to an advanced plan to view all search results including tens of thousands of resumes exclusive on CakeResume.

Definition of Reputation Credits

Technical Skills
Specialized knowledge and expertise within the profession (e.g. familiar with SEO and use of related tools).
Problem-Solving
Ability to identify, analyze, and prepare solutions to problems.
Adaptability
Ability to navigate unexpected situations; and keep up with shifting priorities, projects, clients, and technology.
Communication
Ability to convey information effectively and is willing to give and receive feedback.
Time Management
Ability to prioritize tasks based on importance; and have them completed within the assigned timeline.
Teamwork
Ability to work cooperatively, communicate effectively, and anticipate each other's demands, resulting in coordinated collective action.
Leadership
Ability to coach, guide, and inspire a team to achieve a shared goal or outcome effectively.
More than one year
PowerPlant Engineer
GE Evergreen Engine Service Coopertion
2020 ~ Present
Taoyuan, Taiwan
Professional Background
Current status
Job Search Progress
Professions
Turbine Engineer
Fields of Employment
Aeronautics / Space
Work experience
6-10 years
Management
I've had experience in managing 15+ people
Skills
Word
PowerPoint
Excel
Photoshop
Customer Service
Engineering Drawings
Engineering Skills
Troubleshooting Skills
Languages
English
Fluent
Chinese
Native or Bilingual
Job search preferences
Positions
Customer Support Engineer
Job types
Full-time
Locations
Remote
Interested in working remotely
Freelance
No
Educations
School
National Cheng Kung University
Major
Automatic control, Circuitry
Print

YujiangWang

PowerPlant Engineer

  Taoyuan City, Taiwan

Highly motivated communication with different department and extensive customer support experience, outstanding engineering background and technique support, familiar with leading project and organize the teamwork.

 
Tel: 886 987 520 391

Email address: [email protected]

Work Experience

PowerPlant Engineer (Turbine Fan Engine)  •  GE Evergreen Engine Service Corporation

January 2020 - Present

  • Take responsibility for providing technical support in turbine fan engine maintenance cases.
  • Performing trouble shooting while the technician runs into problems during engine disassembly or repair or engine build up.
  • Lead shop operation team to complete the investigation/ maintenance/ special request project.
  • Take responsibility for performing data collection and analysis if attend investigation projects while inducting the event engine.
  • Supporting material team to recognize the components configuration and set up the scrap replacement rule.
  • Have good communication with customer and commercial team and realize the requirements in contracts.
  • Working with global engineering teams to solve difficult technical problems.
  • Lead lean projects to reduce the shop maintenance labor hours and realize the cost down target.
  • Initiate new procedures into shop flow once OEM publishes the new criteria or new service bulletin.
  • Give the presentation to shop mechanics and share professional knowledge to improve the shop's soft power.


Customer Support Engineer  •  Evergreen Aviation Technologies Corporation

December 2016 - December 2019

  • Take responsibility for discussing with customers about the workscope during engine shop visits.
  • Supporting finance team to charge the maintenance fee and contact customers.
  • Take responsibility for providing technical support in turbine fan engine maintenance cases.
  • Performing trouble shooting while the technician runs into problems during engine disassembly or repair or engine build up.
  • Lead shop operation team to complete the investigation/ maintenance/ special request project.
  • Working with global engineering teams to solve difficult technical problems.
  • Get training for two months in GE headquarters and GE Caledonian.

PowerPlant Technician  •  Evergreen Aviation Technologies Corporation

August 2015 - November 2016

Performed the PowerPlant (aircraft engine) maintenance task, and also completed the engine induction inspection & data analysis.

Education

National Cheng Kung University

Engineering Science Department - Bachelor of Science degree

Major in Automatic control, Circuitry

2010 - 2014

Skills


  • Word
  • PowerPoint
  • Excel
  • Photoshop
  • Customer Service
  • Engineering Drawings
  • Engineering Skills
  • Troubleshooting Skills

Languages


  • English — Fluent
  • Chinese — Native or Bilingual

Projects



CF6 engine model conversion change

The customer(Airline) and the commercial team have an agreement in contract to provide customers with a spare engine, then the customer has 12 engines for us to overhaul. The contract value is over 100 million USD.

To match customer's request, I introduced a new procedure into the shop. The procedure is published by OEM but nobody has done it before, and the old procedure is uncompleted, so I did a lot of data collection and spent a lot of time discussing with the design engineer and fleet support engineer, and confirmed the final procedure, then broke down the entire requirement into details and ordered the shop mechanic to follow step by step.

The project matches the schedule on time and prevents the penalty and satisfies customers.


Aircraft engine maintenance workscope preparation auxiliary tool

The workscope preparation is the major responsibility for engineers, to prevent the human factor and reduce the man hours in preparing the workscope documentation. I created the auxiliary tool by using Excel VBA function editor to help teams to generate documents more easily and quickly.

CF6 engine fan module repair procedure introduction

Developing a new procedure to do the repair on FAN module rather than remove the rotating components from the engine, prevented the risk which might happen during disassembly and saved man hours and costs. It also prevents the potential possibility to scrap the life limit parts if-execute the overhaul.

About Me

In the aviation industry for over 6 years, I have completed a lot of projects and keep improving my communication skills, coordination skills & engineering skills. In my career plan, the 30-year-old is at the intersection to choose the next road of my life. To be a new role, I hope I can keep sharpening my personnel skills, and bring a new mindset into that industry based on my experience.

Resume
Profile

YujiangWang

PowerPlant Engineer

  Taoyuan City, Taiwan

Highly motivated communication with different department and extensive customer support experience, outstanding engineering background and technique support, familiar with leading project and organize the teamwork.

 
Tel: 886 987 520 391

Email address: [email protected]

Work Experience

PowerPlant Engineer (Turbine Fan Engine)  •  GE Evergreen Engine Service Corporation

January 2020 - Present

  • Take responsibility for providing technical support in turbine fan engine maintenance cases.
  • Performing trouble shooting while the technician runs into problems during engine disassembly or repair or engine build up.
  • Lead shop operation team to complete the investigation/ maintenance/ special request project.
  • Take responsibility for performing data collection and analysis if attend investigation projects while inducting the event engine.
  • Supporting material team to recognize the components configuration and set up the scrap replacement rule.
  • Have good communication with customer and commercial team and realize the requirements in contracts.
  • Working with global engineering teams to solve difficult technical problems.
  • Lead lean projects to reduce the shop maintenance labor hours and realize the cost down target.
  • Initiate new procedures into shop flow once OEM publishes the new criteria or new service bulletin.
  • Give the presentation to shop mechanics and share professional knowledge to improve the shop's soft power.


Customer Support Engineer  •  Evergreen Aviation Technologies Corporation

December 2016 - December 2019

  • Take responsibility for discussing with customers about the workscope during engine shop visits.
  • Supporting finance team to charge the maintenance fee and contact customers.
  • Take responsibility for providing technical support in turbine fan engine maintenance cases.
  • Performing trouble shooting while the technician runs into problems during engine disassembly or repair or engine build up.
  • Lead shop operation team to complete the investigation/ maintenance/ special request project.
  • Working with global engineering teams to solve difficult technical problems.
  • Get training for two months in GE headquarters and GE Caledonian.

PowerPlant Technician  •  Evergreen Aviation Technologies Corporation

August 2015 - November 2016

Performed the PowerPlant (aircraft engine) maintenance task, and also completed the engine induction inspection & data analysis.

Education

National Cheng Kung University

Engineering Science Department - Bachelor of Science degree

Major in Automatic control, Circuitry

2010 - 2014

Skills


  • Word
  • PowerPoint
  • Excel
  • Photoshop
  • Customer Service
  • Engineering Drawings
  • Engineering Skills
  • Troubleshooting Skills

Languages


  • English — Fluent
  • Chinese — Native or Bilingual

Projects



CF6 engine model conversion change

The customer(Airline) and the commercial team have an agreement in contract to provide customers with a spare engine, then the customer has 12 engines for us to overhaul. The contract value is over 100 million USD.

To match customer's request, I introduced a new procedure into the shop. The procedure is published by OEM but nobody has done it before, and the old procedure is uncompleted, so I did a lot of data collection and spent a lot of time discussing with the design engineer and fleet support engineer, and confirmed the final procedure, then broke down the entire requirement into details and ordered the shop mechanic to follow step by step.

The project matches the schedule on time and prevents the penalty and satisfies customers.


Aircraft engine maintenance workscope preparation auxiliary tool

The workscope preparation is the major responsibility for engineers, to prevent the human factor and reduce the man hours in preparing the workscope documentation. I created the auxiliary tool by using Excel VBA function editor to help teams to generate documents more easily and quickly.

CF6 engine fan module repair procedure introduction

Developing a new procedure to do the repair on FAN module rather than remove the rotating components from the engine, prevented the risk which might happen during disassembly and saved man hours and costs. It also prevents the potential possibility to scrap the life limit parts if-execute the overhaul.

About Me

In the aviation industry for over 6 years, I have completed a lot of projects and keep improving my communication skills, coordination skills & engineering skills. In my career plan, the 30-year-old is at the intersection to choose the next road of my life. To be a new role, I hope I can keep sharpening my personnel skills, and bring a new mindset into that industry based on my experience.