CakeResume Talent Search

Advanced filters
On
De 4 a 6 años
6-10 años
10-15 años
Más de 15 años
Avatar of Vladyslav Khakov.
Avatar of Vladyslav Khakov.
Past
DeFi Engineer @OpenOcean Finance
2023 ~ 2024
Blockchain Developer
En un mes
in the DeFi space, ensuring that my contributions lead to tangible improvements in user experience and platform performance. With a passion for continuous learning and development, I am well-equipped to tackle the challenges of the ever-evolving blockchain landscape. Konotop, Sumy Oblast, Ukraine,Work Experience JanuaryFebruary 2024 DeFi Engineer OpenOcean Finance • Developed and deployed high-performance DeFi protocols on the Solana blockchain, leveraging the network's high throughput and low fees to optimize user transactions. • Specialized in Rust programming for smart contract development, ensuring secure and efficient contract execution within the OpenOcean ecosystem. • Integrated Solana
Rust
Solana
Cryptography/Cryptocurrency
Desempleado
Listo para la entrevista
A tiempo completo / Sólo a distancia
De 4 a 6 años
Kyiv National Taras Shevchenko University
Computer Science
Avatar of Mike Shih.
Avatar of Mike Shih.
Past
Sustaining Engineering Leader - TPO (TPM) @Keurig Dr Pepper Inc.
2020 ~ 2023
Project Lead / Tech Lead / Team Lead / Technical Manager
En un mes
Mike Shih Mike is an easy going individual who enjoys challenging and diverse roles and is confident working with technical expert members or team from any industry. Also good at communicating with others. When facing with troubles, I can deal with them calmly. And also, I am good at logical analysis, strong sense of responsibility, leadership and management skills, communication skills and organizational skills, as well as team core cohesion. The technical design activity will start from study marketing department product spec or custom product requirement to design relative mechanical structure and component parts and product
Technical Project Leadership · Development and definition of the project scope. · Manufacturing Process Improvement · Cost saving for MP project · Technical Product Development · Project managements · Engineering Management
Desempleado
Listo para la entrevista
A tiempo completo / Interesado en trabajar a distancia
Más de 15 años
Nan Jeon University of Science and Technology
Science and Technology
Avatar of 胡嘉倫.
Avatar of 胡嘉倫.
Senior UX Designer / UX Strategist @HTC 宏達國際電子股份有限公司
2022 ~ Presente
UI/UX Designer
En un mes
. I also enjoy teamwork, collaborations, and learning new skills. Skill UI/UX Skills ★ UX Strategy ★ Information Architecture ★ Wireframe ★ UX Flow ★ Mockup ★ Design System ★ QA ★ Redesign and Enhancement Research Methods ★ Competitor Analysis ★ Google Analytics ★ Persona ★ Requirement Definition ★ User Stories Graphic Design ★ Marketing Materials ★ Print Production ★ Publication Design ★ Banner Ads ★ EDMs Experiences HTC Corporation Senior UI/UX Designer / UX Strategist August 2022 ~ Now Proposing strategy solutions for VIVE global website revamp based on data of Google Analytics and SEO
Adobe XD
sketch
Adobe Photoshop
Empleado
Listo para la entrevista
A tiempo completo / Interesado en trabajar a distancia
De 4 a 6 años
Birmingham City University
Visual Communication
Avatar of Samantha Jae Lipit.
Avatar of Samantha Jae Lipit.
Consultant @Global Advanced IT Connections
2024 ~ 2024
Product Owner, Business Analyst, System Analyst
En un mes
Taiwan Team and contributed to effective communication and teamwork. • Provided support to the Product Owner by facilitating Sprint Retrospective Sessions, ensuring continuous improvement and team reflection. • Involved in Program Increment and Iteration Plannings and Demo sessions. BUSINESS SYSTEM ANALYST • Partnered with Product Owners and Operations team to define and document business requirements, identify issues, and propose process improvements. • Facilitated Backlog Grooming/Refinement Sessions, ensuring: - 100% team alignment on prioritized requirements and timeframes. - Clarity on User Stories documented in Jira and Rally - Collaborative discussion and agreement on Acceptance Criteria with Development and Product Teams.
YAML
AWS
Azure
Empleado
Listo para la entrevista
A tiempo completo / Interesado en trabajar a distancia
6-10 años
Adamson University
Information Technology
Avatar of HongSen KE.
Avatar of HongSen KE.
Sales & Marketing Manager @聖和汽車股份有限公司 Sheng-Ho Automobiles
2018 ~ Presente
Business Development / Product Manager / Product Marketing/ Strategy Manager
En un mes
HongSen KE My core value is developing relationships, offering mutually beneficial interactions to establish long-term trust. Shaped by over a decade of experience across five industry domains, defining the value I can provide. Excelled in business development, relationship building, trust enhancement, operational management, and brand stewardship. Experienced in cross-cultural coordination, brand transformation, team restructuring, and achieving exponential performance growth. Changhua County, Taiwan [email protected] Work Experience Sales & Marketing Manager Sheng-Ho Automobiles • FebPresent Sheng-Ho Automobiles, my family business, a dealer of the French Stellantis Group's Peugeot & Citroen brands.
Business Development
People Oriented
Motivation and Team Building
Empleado
Listo para la entrevista
A tiempo completo / Interesado en trabajar a distancia
6-10 años
Loughborough University
Marketing & Management
Avatar of Marko Bogdanovski.
Avatar of Marko Bogdanovski.
Frontend Architect / Lead @Elemental
2021 ~ 2023
Frontend Developer
En un mes
Belgrade, Serbia [email protected] Marko Bogdanovski L5 Software Engineer - NodeJS | Go | Blockchain I specialize in building SaaS applications powered by Blockchain and AI technologies. My core competency lies in end-to-end complete management of new project development, with a focus on custom-tailored apps and services for businesses. Work Experience Full Stack Engineer Ledger Leopard • August 2023 — Present — Developing systems and services based on OpenAI and Blockchain technologies. Frontend Lead Elemental • January 2021 — July 2023 — Worked closely with the CTO to define objectives and align them with the company's strategic
PHP
NoSQL
AWS
Empleado
Listo para la entrevista
A tiempo completo / Sólo a distancia
6-10 años
ETS "Nikola Tesla"
IT
Avatar of the user.
Avatar of the user.
產品總監 @禾亞數位科技股份有限公司
2022 ~ Presente
Product manager, Senior Product Manager, Product Director
En un mes
Team Leadership
Product Management
Product Planning
Empleado
Listo para la entrevista
A tiempo completo / Interesado en trabajar a distancia
10-15 años
國立台灣科技大學 National Taiwan University of Science and Technology
電機工程系
Avatar of the user.
Avatar of the user.
Past
Software Project Manager @Askey Computer Corp.(Asus Group), Taiwan,
2020 ~ 2023
Project Manager、Software Project Manager、Product Manager
En un mes
Embedded System
Microsoft Embedded
Python
Desempleado
Listo para la entrevista
A tiempo completo / Interesado en trabajar a distancia
10-15 años
Tamkang University
Water Resources and Environmental Engineering
Avatar of the user.
Avatar of the user.
Service Manager @Geekplus International Co. Ltd
2020 ~ Presente
COO or Head of Operations or Head of Sales/Business Development
En un mes
Microsoft Office
Empleado
Listo para la entrevista
A tiempo completo / Interesado en trabajar a distancia
10-15 años
Hong Kong Polytechnic University
Bsc Hon Hotel Management
Avatar of Johnny Hsu.
Avatar of Johnny Hsu.
Past
Community Manager @Iron Fish Foundation
2023 ~ Presente
Product Manager / Project Manager / Business Development / Growth Manager
En un mes
Johnny Hsu Crypto Trader / NFT holder / DeFi advocator Taipei City, Taiwan Web3 | DeFi | Crypto | Blockchain Experience Crypto Trader • Self-employed OctoberNow Trade futures and spots of crypto (manually). Analysis of new projects in Web3 and finding investment opportunities. Proactively immersed in trader communities and communicating with other traders. Moderate Discord channels and serve as a point of contact for stakeholders. Lead of Ecosystem Growth • ThunderCore DecemberOctober 2023 Ecosystem Responsibilities - Managed partner accounts, facilitating cross-chain, NFT, and developer team collaborations through external agencies. - Initiated and evolved ThunderCore's Developer Program, successfully onboarding 100
Slack
Zendesk
Notion
Desempleado
Listo para la entrevista
A tiempo completo / Interesado en trabajar a distancia
De 4 a 6 años
國立中興大學
Chinese and Language studies

El plan de reclutamiento más ligero y eficaz

Busque currículums y tome la iniciativa de ponerse en contacto con los solicitantes de empleo para lograr una mayor eficacia en la contratación. La elección de cientos de empresas.

  • Examinar todos los resultados de la búsqueda
  • Acceso ilimitado para iniciar nuevas conversaciones
  • currículos accesibles sólo para empresas de pago
  • Ver dirección de correo electrónico y números de teléfono de los usuarios
Consejos de búsqueda
1
Search a precise keyword combination
senior backend php
If the number of the search result is not enough, you can remove the less important keywords
2
Use quotes to search for an exact phrase
"business development"
3
Use the minus sign to eliminate results containing certain words
UI designer -UX
Sólo los currículums públicos están disponibles con el plan gratuito.
Actualiza a un plan avanzado para ver todos los resultados de la búsqueda incluyendo decenas de miles de currículums exclusivos en CakeResume.

Definition of Reputation Credits

Technical Skills
Specialized knowledge and expertise within the profession (e.g. familiar with SEO and use of related tools).
Problem-Solving
Ability to identify, analyze, and prepare solutions to problems.
Adaptability
Ability to navigate unexpected situations; and keep up with shifting priorities, projects, clients, and technology.
Communication
Ability to convey information effectively and is willing to give and receive feedback.
Time Management
Ability to prioritize tasks based on importance; and have them completed within the assigned timeline.
Teamwork
Ability to work cooperatively, communicate effectively, and anticipate each other's demands, resulting in coordinated collective action.
Leadership
Ability to coach, guide, and inspire a team to achieve a shared goal or outcome effectively.
Más de un año
Package design and substrate planning manager
Logo of NXP Semiconductors Taiwan Ltd. 台灣恩智浦半導體股份有限公司.
NXP Semiconductors Taiwan Ltd. 台灣恩智浦半導體股份有限公司
2022 ~ Presente
Hsinchu, 新竹市台灣
Professional Background
Situación actual
Progreso en la búsqueda de empleo
Professions
Other
Fields of Employment
Manufacturing
Experiencia laboral
10-15 años
Management
I've had experience in managing 5-10 people
Habilidades
Word
Excel
Idiomas
English
Intermedio
Job search preferences
Posición
Substrate material planning manager
Tipo de trabajo
A tiempo completo
Ubicación
A distancia
Interesado en trabajar a distancia
Freelance
No.
Educación
Escuela
National Taiwan University of Science and Technology
Mayor
Material Science and Technology
Imprimir

Bruce Hsieh

Package Innovation Principle Engineer

  Hsinchu City, Taiwan

v Master of material science technology

v 10 years experience in assembly industry, including
- 3 years wire bonding process experience for logic product with lead frame base
- 6.5 years package design experience for memory product with wire bonding and flip chip base. Package type include BGA base product (MCP / PoP )
- 0.5 year substrate planning experience 

- Work in NXP package innovation as project leader now, to handle new product or new technology development

v Key achievement
- Focal team leader to achieve major customer annual audit successfully
- Manage new product development from design till mass production withhigh hitting rate
- Leading team to accomplish customer annual project with cross function team


* E-mail : [email protected]

* Phone no. : 0972-393331


 

Working Experience

工作經歷


Principal Engineer

NXP Semiconductors Taiwan Ltd. 台灣恩智浦半導體股份有限公司

Apr. 2022 - Present
HsinChu, Taiwan

As a project leader for new product or new technology or new material development. The role need to work with internal cross function team, business unit, quality and engineering team for project development. While development need,
1. from assembly process, package design, selected material point of view to create risk assessment
2. prepare development proposal including development schedule to meet production plan.
3. work with OSAT or production line to complete process window study to make sure qualification quality

Substrate material planning manager

Powertech Technology Inc.

六月 2021 - Present
HsinChu, Taiwan

1. Leading 6 members team for substrate planning
2. Work with procurement to define long term substrate allocation and strategy
3. Inventory and excess material control
4. Be coordinator to work with x function team to come out disposition for substrate incoming issue

R&D manager

Powertech Technology Inc.

四月 2019 - 六月 2021
HsinChu, Taiwan

1. Leading 6 members for new production development
1-1 work with customer to find out best structure solution for new product. (both WB base and flip chip base)
1-2 find out best direct material solution through technical discussion and simulation
2. Build up design data base to consolidate capability of team members
3. Coordinator for cross function team project, e.g. standardization substrate deign

R&D section manager

Powertech Technology Inc.

六月 2016 - 四月 2019
HsinChu, Taiwan

1. Leading 6 members for new production development
1-1 work with customer to find out best structure solution for new product. (both WB base and flip chip base)
1-2 find out best direct material solution through technical discussion and simulation
2. Build up design data base to consolidate capability of team members
3. Coordinator for cross function team project, e.g. standardization substrate design

R&D senior engineer

Powertech Technology Inc.

六月 2014 - 六月 2016
HsinChu, Taiwan

1. Project management :
1-1 New product development from design till mass production
1-2 Cost reduction project
2. Trouble shooting, define design rule and upgrade regularly
3. New direct material development (wire /compound / solder ball / die attach film)

Wire bond process engineer

SPIL

九月 2010 - 六月 2014
TaiChung, Taiwan

1. Wire bonding process engineer main job function
1-1 new product process condition and loop setting
1-2 New Cu wire and capillary development
1-2 trouble shooting while new product development
2. Focal team leader for new device qualification
3. Mass production trouble shooting and throughput enhancement

Jun. 2021 - Mar. 2022

Substrate material planning manager  Powertech Technology Inc.

1. Leading a 6 member team for substrate planning


2. Work with procurement to define long term substrate allocation and strategy


3. Inventory and excess material control. Work with process team to come out a plan to consume excess material


4. Be coordinator to work with a cross-function team to come out disposition for substrate incoming issue

5.Monitor substrate delivery and negotiate with suppliers


Apr. 2019 - Jun. 2021

R&D manager  Powertech Technology Inc.

1. Leading 6 members for new production development
1-1 work with customers who has memory foundry to find out the best design solution for new product. (product type including MCP with wire bond and flip chip base)
1-2 find out the best direct material solution through technical discussion and simulation

1-3 work with project managed team to come out product development milestone


2. Build up design data base to consolidate the capability of team members


3. Be a coordinator and communication with cross function team project, e.g. standardization substrate design

4. To communicate and align a working model for better communication with customer manager

5.Integrate suppliers's technical road map with assembly process road map

Jun. 2016 - Apr. 2019

R&D section manager  Powertech Technology Inc.

1. Leading 6 members for new production development
1-1 work with customers who has memory foundry to find out the best design solution for new product. (product type including MCP with wire bond and flip chip base)
1-2 find out the best direct material solution through technical discussion and simulation

1-3 work with project manag team to come our product development milestone


2. Build up design data base to consolidate the capability of team members


3. Be a coordinator and communication with cross function team project, e.g. standardization substrate design

4. Communicate with suppliers for new direct material development. 

Jun. 2014 - Jun. 2016

R&D senior engineer  Powertech Technology Inc.

1. Project management :
1-1 Memory new product development from design till mass production. MCP (NAND+DRAM+controller) and PoP (DRAM) are major package type.
1-2 Cost reduction project

1-3 Work with process engineering team to come out DOE matrix for new structure or new material development


2. Trouble shooting, defining, integrating design rules and upgrading regularly


3. New direct material development (wire /compound / solder ball / die attach film)

Sep. 2010 - Jun. 2014

Wire bond process engineer  SPIL

1. Wire bonding process engineer for QFN package, the main job function are,
1-1 New product process condition and loop setting
1-2 New Cu wire and capillary development
1-3  Trouble shooting while new product development

1-4 Mass production trouble shooting and throughput enhancement


2. Focal team leader for new device qualification


3. Work with technical center to build up parameter data base and selection rule


Education

2007 - 2009

National Taiwan University of Science and Technology

Master of Material Science and Technology

2003 - 2007

National United University 

Bachelor of Material Science and Technology

Resume
Perfil

Bruce Hsieh

Package Innovation Principle Engineer

  Hsinchu City, Taiwan

v Master of material science technology

v 10 years experience in assembly industry, including
- 3 years wire bonding process experience for logic product with lead frame base
- 6.5 years package design experience for memory product with wire bonding and flip chip base. Package type include BGA base product (MCP / PoP )
- 0.5 year substrate planning experience 

- Work in NXP package innovation as project leader now, to handle new product or new technology development

v Key achievement
- Focal team leader to achieve major customer annual audit successfully
- Manage new product development from design till mass production withhigh hitting rate
- Leading team to accomplish customer annual project with cross function team


* E-mail : [email protected]

* Phone no. : 0972-393331


 

Working Experience

工作經歷


Principal Engineer

NXP Semiconductors Taiwan Ltd. 台灣恩智浦半導體股份有限公司

Apr. 2022 - Present
HsinChu, Taiwan

As a project leader for new product or new technology or new material development. The role need to work with internal cross function team, business unit, quality and engineering team for project development. While development need,
1. from assembly process, package design, selected material point of view to create risk assessment
2. prepare development proposal including development schedule to meet production plan.
3. work with OSAT or production line to complete process window study to make sure qualification quality

Substrate material planning manager

Powertech Technology Inc.

六月 2021 - Present
HsinChu, Taiwan

1. Leading 6 members team for substrate planning
2. Work with procurement to define long term substrate allocation and strategy
3. Inventory and excess material control
4. Be coordinator to work with x function team to come out disposition for substrate incoming issue

R&D manager

Powertech Technology Inc.

四月 2019 - 六月 2021
HsinChu, Taiwan

1. Leading 6 members for new production development
1-1 work with customer to find out best structure solution for new product. (both WB base and flip chip base)
1-2 find out best direct material solution through technical discussion and simulation
2. Build up design data base to consolidate capability of team members
3. Coordinator for cross function team project, e.g. standardization substrate deign

R&D section manager

Powertech Technology Inc.

六月 2016 - 四月 2019
HsinChu, Taiwan

1. Leading 6 members for new production development
1-1 work with customer to find out best structure solution for new product. (both WB base and flip chip base)
1-2 find out best direct material solution through technical discussion and simulation
2. Build up design data base to consolidate capability of team members
3. Coordinator for cross function team project, e.g. standardization substrate design

R&D senior engineer

Powertech Technology Inc.

六月 2014 - 六月 2016
HsinChu, Taiwan

1. Project management :
1-1 New product development from design till mass production
1-2 Cost reduction project
2. Trouble shooting, define design rule and upgrade regularly
3. New direct material development (wire /compound / solder ball / die attach film)

Wire bond process engineer

SPIL

九月 2010 - 六月 2014
TaiChung, Taiwan

1. Wire bonding process engineer main job function
1-1 new product process condition and loop setting
1-2 New Cu wire and capillary development
1-2 trouble shooting while new product development
2. Focal team leader for new device qualification
3. Mass production trouble shooting and throughput enhancement

Jun. 2021 - Mar. 2022

Substrate material planning manager  Powertech Technology Inc.

1. Leading a 6 member team for substrate planning


2. Work with procurement to define long term substrate allocation and strategy


3. Inventory and excess material control. Work with process team to come out a plan to consume excess material


4. Be coordinator to work with a cross-function team to come out disposition for substrate incoming issue

5.Monitor substrate delivery and negotiate with suppliers


Apr. 2019 - Jun. 2021

R&D manager  Powertech Technology Inc.

1. Leading 6 members for new production development
1-1 work with customers who has memory foundry to find out the best design solution for new product. (product type including MCP with wire bond and flip chip base)
1-2 find out the best direct material solution through technical discussion and simulation

1-3 work with project managed team to come out product development milestone


2. Build up design data base to consolidate the capability of team members


3. Be a coordinator and communication with cross function team project, e.g. standardization substrate design

4. To communicate and align a working model for better communication with customer manager

5.Integrate suppliers's technical road map with assembly process road map

Jun. 2016 - Apr. 2019

R&D section manager  Powertech Technology Inc.

1. Leading 6 members for new production development
1-1 work with customers who has memory foundry to find out the best design solution for new product. (product type including MCP with wire bond and flip chip base)
1-2 find out the best direct material solution through technical discussion and simulation

1-3 work with project manag team to come our product development milestone


2. Build up design data base to consolidate the capability of team members


3. Be a coordinator and communication with cross function team project, e.g. standardization substrate design

4. Communicate with suppliers for new direct material development. 

Jun. 2014 - Jun. 2016

R&D senior engineer  Powertech Technology Inc.

1. Project management :
1-1 Memory new product development from design till mass production. MCP (NAND+DRAM+controller) and PoP (DRAM) are major package type.
1-2 Cost reduction project

1-3 Work with process engineering team to come out DOE matrix for new structure or new material development


2. Trouble shooting, defining, integrating design rules and upgrading regularly


3. New direct material development (wire /compound / solder ball / die attach film)

Sep. 2010 - Jun. 2014

Wire bond process engineer  SPIL

1. Wire bonding process engineer for QFN package, the main job function are,
1-1 New product process condition and loop setting
1-2 New Cu wire and capillary development
1-3  Trouble shooting while new product development

1-4 Mass production trouble shooting and throughput enhancement


2. Focal team leader for new device qualification


3. Work with technical center to build up parameter data base and selection rule


Education

2007 - 2009

National Taiwan University of Science and Technology

Master of Material Science and Technology

2003 - 2007

National United University 

Bachelor of Material Science and Technology